ROADWORKS SUMMARY
Sycamore Avenue, HORSHAM, RH12 4TR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Sycamore Avenue, RH12 4TR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Sycamore Avenue, HORSHAM, RH12 4TR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Sycamore Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Robin Hood Lane

West Sussex County Council are carrying out Highway improvement works on Robin Hood Lane, Warnham.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 March 2024 at 06:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 19 Sep 2024 at 10:22.

West Sussex County Council logo
LONG TERM
Between
1 May and 20 Dec 2024
Details
View Map
Share
Follow
Horsham Northern Bypass Eastbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Horsham Northern Bypass Eastbound, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 May 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 8 Feb 2024 at 11:35.

West Sussex County Council logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Langley Walk

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Langley Walk, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 3 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 13:47.

West Sussex County Council logo
LONG TERM
Between
7 Jun and 7 Dec 2024
Details
View Map
Share
Follow
Fox Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Fox Close, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 June 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 13:02.

West Sussex County Council logo
LONG TERM
Between
9 Jun and 22 Dec 2024
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 22 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 13 May 2024 at 07:28.

West Sussex County Council logo
LONG TERM
Between
10 Jun and 10 Dec 2024
Details
View Map
Share
Follow
Scory Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Scory Close, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 13:43.

West Sussex County Council logo
LONG TERM
Between
11 Jun and 11 Dec 2024
Details
View Map
Share
Follow
Wiston Court

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Wiston Court, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 15:05.

West Sussex County Council logo
LONG TERM
Between
11 Jun and 11 Dec 2024
Details
View Map
Share
Follow
Hassocks Court

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hassocks Court, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 15:00.

West Sussex County Council logo
LONG TERM
Between
11 Jun and 11 Dec 2024
Details
View Map
Share
Follow
Pyecombe Court

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pyecombe Court, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 14:10.

West Sussex County Council logo
LONG TERM
Between
11 Jun and 11 Dec 2024
Details
View Map
Share
Follow
Cuckfield Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cuckfield Close, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 14:12.

West Sussex County Council logo
LONG TERM
Between
11 Jun and 11 Dec 2024
Details
View Map
Share
Follow
Cuckfield Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cuckfield Close, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 14:00.

West Sussex County Council logo
LONG TERM
Between
11 Jun and 11 Dec 2024
Details
View Map
Share
Follow
Harting Court

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Harting Court, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 15:14.

West Sussex County Council logo
LONG TERM
Between
16 Jul 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Horsham Northern Bypass Eastbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Horsham Northern Bypass Eastbound, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 20 January 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 30 May 2024 at 11:16.

West Sussex County Council logo
LONG TERM
Between
17 Jul 2024 and 27 Jan 2025
Details
View Map
Share
Follow
Horsham Northern Bypass Eastbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Horsham Northern Bypass Eastbound, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2024 and could run through until 27 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 Jun 2024 at 11:51.

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Crawley S/western Bypass Westbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley S/western Bypass Westbound, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:09.

West Sussex County Council logo
LONG TERM
Between
16 Aug 2024 and 16 Feb 2025
Details
View Map
Share
Follow
Breezehurst Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2024 and could run through until 16 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 10:58.

West Sussex County Council logo
LONG TERM
Between
20 Aug 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Pelham Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2024 and could run through until 20 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 11:00.

West Sussex County Council logo
LONG TERM
Between
23 Aug 2024 and 23 Feb 2025
Details
View Map
Share
Follow
Breezehurst Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 23 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 5 Aug 2024 at 11:50.

West Sussex County Council logo
LONG TERM
Between
23 Aug 2024 and 23 Feb 2025
Details
View Map
Share
Follow
Creasys Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 23 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 12:07.

West Sussex County Council logo
LONG TERM
Between
29 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Coachmans Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Coachmans Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 12:15.

West Sussex County Council logo
LONG TERM
Between
30 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Pelham Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 16 Aug 2024 at 09:31.

West Sussex County Council logo
LONG TERM
Between
2 Sep 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Creasys Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 13 Aug 2024 at 10:10.

Southern Gas Networks logo
LONG TERM
Until
13 Dec 2024
Details
View Map
Share
Follow
Ifield Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Ifield Road, West Green, Crawley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 30 September 2024 at 12:00 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 13:13.

West Sussex County Council logo
LONG TERM
Between
4 Oct 2024 and 4 Apr 2025
Details
View Map
Share
Follow
Scory Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Scory Close, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 21 Aug 2024 at 12:35.

West Sussex County Council logo
LONG TERM
Between
4 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Langhurst Wood Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Langhurst Wood Road, Horsham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 6 December 2024. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Oct 2024 at 11:11.

Southern Gas Networks logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Snell Hatch

Southern Gas Networks are carrying out Utility repair and maintenance works on Snell Hatch, West Green, Crawley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 15:45 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 15:59.

Southern Gas Networks logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Goffs Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Goffs Lane, West Green, Crawley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 15:45 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:09.

Southern Gas Networks logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Deerswood Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Deerswood Road, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 12:20.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Brighton Road

UK Power Networks South Eastern are carrying out New service connection on Brighton Road, Pease Pottage.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 09:05.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Brighton Road

UK Power Networks South Eastern are proposing to carry out New service connection on Brighton Road, Pease Pottage.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2024 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Sep 2024 at 14:31.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Lodge Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Close, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:27.

West Sussex County Council logo
Until
9 Dec 2024
Details
View Map
Share
Follow
Hurst Road

West Sussex County Council are carrying out Highway improvement works on Hurst Road, Horsham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:30 and could run through until 9 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Nov 2024 at 10:00.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Town Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 10:13.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Leopold Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Leopold Road, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 23 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:29.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Princess Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Princess Road, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 23 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:29.

Southern Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prestwood Lane

Southern Water are carrying out Utility repair and maintenance works on Prestwood Lane, Ifield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 07:45 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 26 Nov 2024 at 08:36.

Southern Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Prestwood Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Prestwood Lane, Ifield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Oct 2024 at 10:53.

UK Power Networks South Eastern logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Broadbridge Heath Road

UK Power Networks South Eastern are carrying out Remedial works on Broadbridge Heath Road, Warnham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 09:00 and could run through until 28 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 26 Nov 2024 at 09:51.

Southern Water logo
Between
26 Nov and 20 Dec 2024
Details
View Map
Share
Prestwood Lane

Southern Water were proposing to carry out Utility repair and maintenance works on Prestwood Lane, Ifield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Water on 27 Sep 2024 at 14:51.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Partridge Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Partridge Lane, Newdigate, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 10 Sep 2024 at 11:42.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
The Dingle

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Dingle, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 08:44.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Church Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Street, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 23 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:30.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Alpha Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Alpha Road, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 23 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:30.

West Sussex County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Hammerpond Road

West Sussex County Council are carrying out Highway improvement works on Hammerpond Road, Mannings Heath.

The road is closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 2 December 2024 and are due to last for only one day. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:48.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Smalls Mead

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Smalls Mead, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 23 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 10:30.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Albany Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albany Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:25.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Partridge Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Partridge Lane, Newdigate, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 7 Sep 2024 at 10:39.

West Sussex County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 15:50.

West Sussex County Council logo
Between
3 and 7 Dec 2024
Details
View Map
Share
Follow
Horsham Northern Bypass Eastbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Horsham Northern Bypass Eastbound, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 7 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:18.

West Sussex County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Haslett Avenue West

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 15:48.

West Sussex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Coachmans Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Coachmans Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Nov 2024 at 13:46.

West Sussex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Friday Street

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friday Street, Rusper.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 13:07.

West Sussex County Council logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Follow
Friday Street

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friday Street, Rusper.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 10:59.

West Sussex County Council logo
Between
10 and 14 Dec 2024
Details
View Map
Share
Follow
Breezehurst Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Nov 2024 at 13:49.

West Sussex County Council logo
Between
11 and 15 Dec 2024
Details
View Map
Share
Follow
Creasys Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Nov 2024 at 14:05.

West Sussex County Council logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Robin Hood Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Robin Hood Lane, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 10:53.

West Sussex County Council logo
Between
17 and 20 Dec 2024
Details
View Map
Share
Follow
Robin Hood Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Robin Hood Lane, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 12:24.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Follow
The Dingle

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Dingle, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 15:00.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Town Mead

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:38.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Fairway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairway, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 11:49.

Southern Gas Networks logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Langdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Langdale Road, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:52.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Woodcroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcroft Road, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:51.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Thirlmere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thirlmere Road, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:55.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Ewhurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ewhurst Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:36.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Ewhurst Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ewhurst Close, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 14:25.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Reynolds Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Reynolds Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:52.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Haslett Avenue West

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 11:43.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Haslett Avenue West

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:08.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 10:13.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 11:49.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:10.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Meadowlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Meadowlands, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 14:34.

West Sussex County Council logo
Between
12 and 18 Feb 2025
Details
View Map
Share
Follow
Northlands Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Northlands Road, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:19.

West Sussex County Council logo
Between
12 and 18 Feb 2025
Details
View Map
Share
Follow
Northlands Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Northlands Road, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 15:47.

West Sussex County Council logo
Between
12 and 19 Feb 2025
Details
View Map
Share
Follow
Northlands Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Northlands Road, Warnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 19 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 1 Nov 2024 at 15:43.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:00.

UK Power Networks South Eastern logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Oct 2024 at 15:00.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Swallowfield Close

West Sussex County Council are proposing to carry out Highway improvement works on Swallowfield Close, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 09:31.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Woodlands Walk

West Sussex County Council are proposing to carry out Highway improvement works on Woodlands Walk, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 09:24.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Winterpit Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Winterpit Lane, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 10:22.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Pound Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pound Lane, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 10:14.

West Sussex County Council logo
Between
21 and 24 Feb 2025
Details
View Map
Share
Follow
Church Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Church Road, Mannings Heath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 10:18.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Town Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:59.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Town Barn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Barn Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:56.


Roadworks Map near to Sycamore Avenue, HORSHAM, RH12 4TR

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Nov 2024 22:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Sycamore Avenue, HORSHAM, RH12 4TR (11 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
CRAWLEY ROAD 
(0.1 miles)
Virgin Media
Utility asset works - Verge - Multi-way signals
Cancelled
(Scheduled: 25 Nov 2024 - 6 Dec 2024)
0.1
Details
Share
2
Virgin Media logo
CRAWLEY ROAD 
(0.1 miles)
Virgin Media
Utility asset works - Verge - No carriageway incursion
Cancelled
(Scheduled: 25 Nov 2024 - 6 Dec 2024)
0.1
Details
Share
3
Virgin Media logo
CRAWLEY ROAD 
(0.1 miles)
Virgin Media
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 25 Nov 2024 08:30
(Scheduled: 25 Nov 2024 - 6 Dec 2024)
0.1
Details
Share
Follow
4
Nexfibre Networks Limited logo
ROWAN WAY 
(0.3 miles)
Nexfibre Networks Limited
Utility asset works - Footway - No carriageway incursion
Cancelled
(Scheduled: 26 Nov 2024 - 27 Nov 2024)
0.3
Details
Share
5
BT logo
LAMBS FARM ROAD, WEST SUSSEX 
(0.3 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 27 Nov 2024
0.3
Details
Share
Follow
6
BT logo
CRAWLEY ROAD 
(0.4 miles)
BT
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 25 Nov 2024 - 27 Nov 2024)
0.4
Details
Share
7
BT logo
FALLOW DEER CLOSE, WEST SUSSEX 
(0.7 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 27 Nov 2024 - 29 Nov 2024
0.7
Details
Share
Follow
8
West Sussex County Council logo
MANOR ROAD 
(0.7 miles)
West Sussex County Council
Section 50 - Footway, Carriageway - Give and take
Planned
Scheduled: 25 Nov 2024 - 6 Dec 2024
0.7
Details
Share
Follow
9
West Sussex County Council logo
MAJOR
  
HORSHAM NORTHERN BYPASS EASTBOUND 
(0.9 miles)
West Sussex County Council
Highway repair and maintenance works - Carriageway - Lane closure
Planned
Scheduled: 1 May 2024 - 20 Dec 2024
0.9
Details
Share
Follow
10
West Sussex County Council logo
MAJOR
  
HORSHAM NORTHERN BYPASS EASTBOUND 
(0.9 miles)
West Sussex County Council
Highway repair and maintenance works - Carriageway, Verge - Some carriageway incursion
In Progress
Since: 1 May 2024 08:00
(Scheduled: 1 May 2024 - 20 Dec 2024)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.