ROADWORKS SUMMARY
Crawley Avenue, CRAWLEY, RH10 8BA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Crawley Avenue, RH10 8BA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Crawley Avenue, CRAWLEY, RH10 8BA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Crawley Avenue are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
19 Feb 2024 and 18 Feb 2029
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 18 February 2029. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 12:37.

West Sussex County Council logo
LONG TERM
Between
10 Jun 2024 and 10 Jan 2025
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 8 Jul 2024 at 09:18.

West Sussex County Council logo
LONG TERM
Between
16 Jul 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Horsham Northern Bypass Eastbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Horsham Northern Bypass Eastbound, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 July 2024 and could run through until 20 January 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 30 May 2024 at 11:16.

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
Crawley S/western Bypass Westbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley S/western Bypass Westbound, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:09.

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.

West Sussex County Council logo
LONG TERM
Between
16 Aug 2024 and 16 Feb 2025
Details
View Map
Share
Follow
Breezehurst Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 August 2024 and could run through until 16 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 10:58.

West Sussex County Council logo
LONG TERM
Between
20 Aug 2024 and 20 Feb 2025
Details
View Map
Share
Follow
Pelham Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 August 2024 and could run through until 20 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 11:00.

West Sussex County Council logo
LONG TERM
Between
23 Aug 2024 and 23 Feb 2025
Details
View Map
Share
Follow
Creasys Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 23 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 12:07.

West Sussex County Council logo
LONG TERM
Between
23 Aug 2024 and 23 Feb 2025
Details
View Map
Share
Follow
Breezehurst Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 August 2024 and could run through until 23 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 5 Aug 2024 at 11:50.

West Sussex County Council logo
LONG TERM
Between
29 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Coachmans Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Coachmans Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 12:15.

West Sussex County Council logo
LONG TERM
Between
30 Aug 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Pelham Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 16 Aug 2024 at 09:31.

West Sussex County Council logo
LONG TERM
Between
2 Sep 2024 and 2 Mar 2025
Details
View Map
Share
Follow
Creasys Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 2 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 13 Aug 2024 at 10:10.

West Sussex County Council logo
LONG TERM
Between
4 Oct 2024 and 4 Apr 2025
Details
View Map
Share
Follow
Scory Close

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Scory Close, Bewbush, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 21 Aug 2024 at 12:35.

West Sussex County Council logo
LONG TERM
Between
4 Oct 2024 and 4 Apr 2025
Details
View Map
Share
Follow
Chestnut Walk

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chestnut Walk, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 21 Aug 2024 at 12:11.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 24 Jan 2025
Details
View Map
Share
Follow
The Dingle

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Dingle, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 08:44.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Dec 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Hazelwick Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Hazelwick Avenue, Three Bridges, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 15:33.

Network Rail logo
LONG TERM
Between
9 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
High Street

Network Rail are proposing to carry out Works for Rail Purposes on High Street, Horley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 14:45.

Network Rail logo
LONG TERM
Until
12 Jan 2025
Details
View Map
Share
Follow
High Street

Network Rail are carrying out Works for Rail Purposes on High Street, Horley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 9 December 2024 at 06:00 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Dec 2024 at 08:12.

West Sussex County Council logo
Until
3 Jan 2025
Details
View Map
Share
Follow
A23 Ifield Avenue Roundabout

West Sussex County Council are carrying out Highway improvement works on A23 Ifield Avenue Roundabout, West Green, Crawley.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 December 2024 at 09:24 and could run through until 3 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Dec 2024 at 13:43.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Charlwood Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 December 2024 at 09:41 and could run through until 27 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 11:20.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Station Road

Network Rail were proposing to carry out Works for Rail Purposes on Station Road, Horley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 December 2024 and run through until 27 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 20 Dec 2024 at 14:06.

Network Rail logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Oct 2024 at 12:01.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 27 Feb 2025
Details
View Map
Share
Follow
Fairway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairway, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 11:49.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Follow
The Dingle

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Dingle, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 15:00.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Town Mead

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:38.

West Sussex County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 09:21.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 12:31.

West Sussex County Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 13:46.

Surrey County Council logo
LONG TERM
Between
6 Jan and 1 Sep 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Surrey County Council on 24 Apr 2024 at 12:27.

West Sussex County Council logo
Between
7 and 30 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 12:35.

West Sussex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 15:45.

West Sussex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Crawley Avenue Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 15:41.

National Highways logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Crawley Avenue Roundabout

National Highways were proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Dec 2024 at 11:25.

West Sussex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Crawley Avenue Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 15:48.

Southern Gas Networks logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Langdale Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Langdale Road, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:52.

West Sussex County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 8 Jul 2024 at 09:19.

Southern Gas Networks logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Church Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Lane, Copthorne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 3 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 15:30.

Surrey County Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Norwood Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 10:39.

Surrey County Council logo
LONG TERM
Between
13 Jan and 24 Feb 2025
Details
View Map
Share
Follow
Stan Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Stan Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Nov 2024 at 10:37.

West Sussex County Council logo
Between
15 and 20 Jan 2025
Details
View Map
Share
Follow
Antlands Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:48.

West Sussex County Council logo
Between
15 and 20 Jan 2025
Details
View Map
Share
Follow
Antlands Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 13:20.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Church Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 6 Nov 2024 at 08:35.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Woodcroft Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcroft Road, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:51.

Southern Gas Networks logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Thirlmere Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thirlmere Road, Ifield, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:55.

Surrey County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Horley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Nov 2024 at 10:08.

Surrey County Council logo
Between
20 and 23 Jan 2025
Details
View Map
Share
Follow
Charlwood Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 19 Nov 2024 at 10:10.

West Sussex County Council logo
Between
25 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 11:07.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Ewhurst Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ewhurst Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:36.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Ewhurst Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ewhurst Close, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 14:25.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Reynolds Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Reynolds Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 12:52.

West Sussex County Council logo
LONG TERM
Between
27 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Shipley Bridge Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shipley Bridge Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 14:34.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:10.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 11:49.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 10:13.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Haslett Avenue West

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:08.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Haslett Avenue West

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 11:43.

West Sussex County Council logo
LONG TERM
Between
29 Jan and 7 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:09.

West Sussex County Council logo
Between
29 Jan and 13 Feb 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Dec 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Meadowlands

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Meadowlands, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 14:34.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Copthorne Way

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way, Copthorne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:27.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Copthorne Way Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way Roundabout, Copthorne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:28.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Copthorne Common

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Common, Copthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:25.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Church Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 11:29.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Church Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 07:40.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Tinsley Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Tinsley Lane, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 15:54.

UK Power Networks South Eastern logo
Between
6 and 12 Feb 2025
Details
View Map
Share
Follow
Fleming Way

UK Power Networks South Eastern are proposing to carry out New service connection on Fleming Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:18.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, West Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:20.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, West Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:39.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:23.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:40.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 12:31.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:36.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:13.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Oct 2024 at 11:57.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:07.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 10:09.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:37.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 6 Jun 2025
Details
View Map
Share
Follow
Manor Royal

West Sussex County Council are proposing to carry out Highway improvement works on Manor Royal, Northgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 16:34.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Stan Hill

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Stan Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Nov 2024 at 11:22.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
10 and 14 Feb 2025
Details
View Map
Share
Follow
Stan Hill

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Stan Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Dec 2024 at 09:35.

UK Power Networks South Eastern logo
Between
13 and 28 Feb 2025
Details
View Map
Share
Follow
Gatwick Road

UK Power Networks South Eastern are proposing to carry out New service connection on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:36.

West Sussex County Council logo
LONG TERM
Between
15 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Hazelwick Avenue

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hazelwick Avenue, Three Bridges, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 31 March 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Dec 2024 at 12:47.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Roffey Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Roffey Roundabout, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 11:11.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Horsham Northern Bypass Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Horsham Northern Bypass Eastbound, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 11:13.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Crawley Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Westbound, North Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 11:10.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:00.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 10:14.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 11:29.

Surrey County Council logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Hookwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 23 Aug 2024 at 12:44.

Surrey County Council logo
LONG TERM
Between
17 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Reigate Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Hookwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Surrey County Council on 23 Aug 2024 at 12:43.

UK Power Networks South Eastern logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Oct 2024 at 15:00.

UK Power Networks South Eastern logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chanctonbury Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Chanctonbury Way, Southgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Dec 2024 at 08:23.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Town Barn Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Barn Road, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 15:30.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Town Mead

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 15:30.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Russ Hill

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Russ Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 18 Dec 2024 at 10:58.

West Sussex County Council logo
LONG TERM
Between
24 Feb and 29 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 13:17.

West Sussex County Council logo
LONG TERM
Between
24 Feb and 29 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 13:14.

West Sussex County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Pelham Place Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Pelham Place Roundabout, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 18 Oct 2024 at 13:44.

West Sussex County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Pelham Place

West Sussex County Council are proposing to carry out Highway improvement works on Pelham Place, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 13:39.

West Sussex County Council logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Holyrood Place

West Sussex County Council are proposing to carry out Highway improvement works on Holyrood Place, Broadfield, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 13:41.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Southbound, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:14.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Napier Way

West Sussex County Council are proposing to carry out Highway improvement works on Napier Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:20.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Hazelwick Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Hazelwick Avenue, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:16.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Northbound

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Northbound, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:15.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Maxwell Way

West Sussex County Council are proposing to carry out Highway improvement works on Maxwell Way, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:12.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Northbound Slip

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Northbound Slip, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:17.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Southbound Slip

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Southbound Slip, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:18.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:13.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Manor Royal

West Sussex County Council are proposing to carry out Highway improvement works on Manor Royal, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:20.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:19.

UK Power Networks South Eastern logo
Between
1 and 13 Mar 2025
Details
View Map
Share
Follow
Hazelwick Avenue Northbound

UK Power Networks South Eastern are proposing to carry out New service connection on Hazelwick Avenue Northbound, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:12.

UK Power Networks South Eastern logo
Between
1 and 13 Mar 2025
Details
View Map
Share
Follow
North Road

UK Power Networks South Eastern are proposing to carry out New service connection on North Road, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:37.

UK Power Networks South Eastern logo
LONG TERM
Between
1 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Northgate Roundabout

UK Power Networks South Eastern are proposing to carry out New service connection on Northgate Roundabout, Three Bridges, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 8 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:17.

UK Power Networks South Eastern logo
LONG TERM
Between
1 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Crawley Avenue Access Westbound

UK Power Networks South Eastern are proposing to carry out New service connection on Crawley Avenue Access Westbound, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:11.

UK Power Networks South Eastern logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Willow Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Willow Road, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 3 Dec 2024 at 14:40.

UK Power Networks South Eastern logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Willow Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Willow Road, Horsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Dec 2024 at 12:11.

Surrey County Council logo
LONG TERM
Between
4 Mar and 15 Apr 2025
Details
View Map
Share
Follow
Norwood Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Norwood Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 12:13.

Surrey County Council logo
LONG TERM
Between
4 Mar and 15 Apr 2025
Details
View Map
Share
Follow
Stan Hill

Surrey County Council are proposing to carry out Highway repair and maintenance works on Stan Hill, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 9 Dec 2024 at 12:14.

West Sussex County Council logo
Between
6 and 24 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 12:54.

West Sussex County Council logo
Between
6 and 18 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:16.

West Sussex County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
The Broadway

West Sussex County Council are proposing to carry out Highway improvement works on The Broadway, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 28 Nov 2024 at 11:13.

West Sussex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Kelvin Way

West Sussex County Council are proposing to carry out Highway improvement works on Kelvin Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 10:56.

West Sussex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Kelvin Lane

West Sussex County Council are proposing to carry out Highway improvement works on Kelvin Lane, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 13:48.

West Sussex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Faraday Road

West Sussex County Council are proposing to carry out Highway improvement works on Faraday Road, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:29.

Network Rail logo
Between
14 and 17 Mar 2025
Details
View Map
Share
Follow
Wimland Road

Network Rail are proposing to carry out Works for Rail Purposes on Wimland Road, Faygate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Dec 2024 at 13:03.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley S/western Bypass Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley S/western Bypass Westbound, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 15:26.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Tollgate Hill Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Tollgate Hill Roundabout, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 15:17.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley S/western Bypass Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley S/western Bypass Eastbound, Broadfield, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 14:44.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Eastbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:21.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Faygate Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Faygate Roundabout, Faygate, Horsham.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:13.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Westbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:21.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Eastbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Eastbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:11.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Roundabout, Faygate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:22.

West Sussex County Council logo
LONG TERM
Between
17 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Crawley Road Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Road Westbound, Colgate.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 12:50.

Surrey County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Horley Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 17:37.

Surrey County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Charlwood Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 17:36.

BT logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Manor Drive

BT are proposing to carry out Utility repair and maintenance works on Manor Drive, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 20 Dec 2024 at 14:43.

BT logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Manor Drive

BT are proposing to carry out Utility repair and maintenance works on Manor Drive, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 23 Dec 2024 at 07:48.

UK Power Networks South Eastern logo
Between
18 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Gatwick Road

UK Power Networks South Eastern are proposing to carry out New service connection on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:36.

West Sussex County Council logo
Between
18 and 26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:23.

Network Rail logo
Between
21 and 24 Mar 2025
Details
View Map
Share
Follow
Wimland Road

Network Rail are proposing to carry out Works for Rail Purposes on Wimland Road, Faygate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Dec 2024 at 13:33.

UK Power Networks South Eastern logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Withey Meadows

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Withey Meadows, Hookwood, Dorking Rural.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Dec 2024 at 12:46.


Roadworks Map near to Crawley Avenue, CRAWLEY, RH10 8BA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 26 Dec 2024 20:51
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Crawley Avenue, CRAWLEY, RH10 8BA (21 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
UK Power Networks South Eastern logo
NURSERYLANDS, GOSSOPS GREEN 
(0.4 miles)
UK Power Networks South Eastern
New service connection - Footway - No carriageway incursion
In Progress
Since: 17 Dec 2024 10:15
(Scheduled: 17 Dec 2024 - 31 Dec 2024)
0.4
Details
Share
Follow
2
West Sussex County Council logo
MAJOR
  
COLONSAY ROAD, BROADFIELD 
(0.4 miles)
West Sussex County Council
Highway repair and maintenance works - Footway - Road closure
Planned
Scheduled: 27 Nov 2023 - 5 Dec 2026
0.4
Details
Share
Follow
3
UK Power Networks South Eastern logo
URGENT
  
SPENCERS ROAD, WEST GREEN 
(0.5 miles)
UK Power Networks South Eastern
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 18 Dec 2024 10:26
(Scheduled: 18 Dec 2024 - 8 Jan 2025)
0.5
Details
Share
Follow
4
West Sussex County Council logo
MAJOR
  
THE DINGLE, WEST GREEN 
(0.6 miles)
West Sussex County Council
Highway repair and maintenance works - Footway - Road closure
Planned
Scheduled: 31 Jan 2024 - 2 Feb 2027
0.6
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
THE DINGLE, WEST GREEN 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Road closure
Planned
Scheduled: 2 Dec 2024 - 24 Jan 2025
0.6
Details
Share
Follow
6
Southern Gas Networks logo
MAJOR
  
ELLMAN ROAD, BEWBUSH 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 14 Oct 2024 - 6 Jan 2025
0.6
Details
Share
Follow
7
Southern Gas Networks logo
MAJOR
  
ELLMAN ROAD, BEWBUSH 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Complete
9 Oct 2024 09:40 - 11 Nov 2024 13:30
0.6
Details
Share
8
Southern Gas Networks logo
MAJOR
  
ELLMAN ROAD, BEWBUSH 
(0.6 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 14 Oct 2024 - 6 Jan 2025)
0.6
Details
Share
9
West Sussex County Council logo
MAJOR
  
SCORY CLOSE, BEWBUSH 
(0.7 miles)
West Sussex County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 4 Oct 2024 - 4 Apr 2025
0.7
Details
Share
Follow
10
West Sussex County Council logo
MAJOR
  
SHIPLEY ROAD, IFIELD 
(0.7 miles)
West Sussex County Council
Works for road purposes - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 8 Nov 2024 - 6 May 2025
0.7
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.