ROADWORKS SUMMARY
Balcombe Road, CRAWLEY, RH10 7ZR
Introduction

View current and future planned roadworks and road closures for Balcombe Road, RH10 7ZR and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Balcombe Road, CRAWLEY, RH10 7ZR
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Balcombe Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
19 Feb 2024 and 18 Feb 2029
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2024 and could run through until 18 February 2029. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 12:37.
6 Jan and 1 Sep 2025
Surrey County Council are proposing to carry out Highway improvement works on High Street, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 24 Apr 2024 at 12:27.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Manor Royal, Northgate, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:06.
1 Apr 2025 and 30 Apr 2026
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue, Northgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 30 April 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 13:47.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Felbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 22 Aug 2024 at 08:06.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 14 Aug 2024 at 09:44.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Thornton Close, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 16 Aug 2024 at 14:31.
1 Apr and 1 Oct 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Thornton Place, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 29 Aug 2024 at 07:54.
21 Apr and 30 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on The Ridings, Pound Hill, Crawley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 April 2025 and run through until 30 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 15:35.
18 Jul 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Radford Road, Crawley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 22 April 2025 at 09:53 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 27 May 2025 at 10:34.
28 Apr and 13 Jun 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Withypitts, Turners Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Apr 2025 at 10:34.
16 Jun 2025
UK Power Networks South Eastern are carrying out New service connection on Withypitts, Turners Hill.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 29 April 2025 at 10:00 and could run through until 16 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 29 Apr 2025 at 11:31.
28 Apr and 13 Jun 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Selsfield Road, Turners Hill.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by UK Power Networks South Eastern on 7 Apr 2025 at 10:33.
13 Jun 2025
UK Power Networks South Eastern are carrying out New service connection on Selsfield Road, Turners Hill.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 April 2025 at 16:49 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 23 May 2025 at 12:03.
Tomorrow
West Sussex County Council are proposing to carry out Highway improvement works on Shipley Bridge Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 4 June 2025. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 28 Mar 2025 at 09:09.
Tomorrow
West Sussex County Council are proposing to carry out Highway improvement works on Elger Way, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 4 June 2025. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 27 Mar 2025 at 15:26.
Tomorrow
West Sussex County Council are proposing to carry out Highway improvement works on Borers Arms Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 4 June 2025. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 10 Mar 2025 at 08:35.
Tomorrow
West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Bank, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2025 and could run through until 4 June 2025. The works will impact the footway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 11:52.
Friday
Surrey County Council are proposing to carry out Section 50 on Rowplatt Lane, Felbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 9 Apr 2025 at 07:35.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Brighton Road, Broadfield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge only.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:22.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Brighton Road, Tilgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge only.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:23.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Southgate Roundabout, Southgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge only.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:13.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Southgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway, verge and cycleway.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:25.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Broadfield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge and cycleway.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:14.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Horsham Road Roundabout, Gossops Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge only.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:14.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Southgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway, verge and cycleway.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:15.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Gossops Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge only.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:14.
20 May and 20 Jun 2025
West Sussex County Council were proposing to carry out Highway improvement works on Crawley Avenue, Southgate, Crawley.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 May 2025 and run through until 20 June 2025. The works were due to impact the footway, verge and cycleway.
This roadwork event was last updated by West Sussex County Council on 29 May 2025 at 16:22.
27 May and 10 Jun 2025
West Sussex County Council are proposing to carry out roadworks on Haslett Avenue East Eastbound, Northgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2025 and could run through until 10 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 21 May 2025 at 12:18.
Tomorrow
West Sussex County Council are proposing to carry out Permanent reinstatement on Ifield Drive, Ifield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Mar 2025 at 12:09.
Tomorrow
West Sussex County Council are carrying out Permanent reinstatement on Ifield Drive, Ifield, Crawley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 May 2025 at 09:00 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 30 May 2025 at 14:35.
Tomorrow
West Sussex County Council are carrying out Highway repair and maintenance works on East Street, Turners Hill.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 20:01 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 Jun 2025 at 20:03.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Balcombe Road, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 10:51.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Worth Park Avenue, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 10:49.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Road, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 10:51.
Friday
West Sussex County Council are proposing to carry out Highway improvement works on Worth Park Avenue Roundabout, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 10:50.
Tomorrow
West Sussex County Council were proposing to carry out Highway improvement works on London Road, Northgate, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 June 2025 and run through until 4 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Mar 2025 at 13:47.
Tomorrow
West Sussex County Council are proposing to carry out Highway improvement works on London Road, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 1 Apr 2025 at 11:10.
Tomorrow
West Sussex County Council are carrying out Highway improvement works on London Road, Northgate, Crawley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 06:00 and could run through until 4 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 Jun 2025 at 08:38.
2 and 13 Jun 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2025 and could run through until 13 June 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 1 Apr 2025 at 12:10.
Monday
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Church Road, Horley.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 June 2025 at 18:45 and could run through until 9 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 3 Jun 2025 at 15:47.
Thursday
West Sussex County Council are proposing to carry out Highway improvement works on Pelham Place, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2025 at 11:15.
Thursday
West Sussex County Council are proposing to carry out Highway improvement works on Pelham Place, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Apr 2025 at 11:33.
Thursday
West Sussex County Council are proposing to carry out Highway improvement works on Pelham Place, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2025 at 11:50.
Thursday
West Sussex County Council are proposing to carry out Highway improvement works on Pelham Place, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Apr 2025 at 13:54.
Thursday
West Sussex County Council are proposing to carry out Highway improvement works on Holyrood Place, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2025 at 13:32.
Thursday
West Sussex County Council are proposing to carry out Highway improvement works on Holyrood Place, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Apr 2025 at 13:09.
Thursday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Common, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2025 and could run through until 5 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 May 2025 at 09:56.
Sunday
West Sussex County Council were proposing to carry out Highway repair and maintenance works on Brighton Road, Tilgate, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 June 2025 and run through until 8 June 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 22 Apr 2025 at 15:02.
4 and 10 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Rusper Road, Ifield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 10 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Apr 2025 at 10:49.
Friday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Common, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 May 2025 at 15:31.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Thornton Close, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 May 2025 at 13:10.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on Thornton Place, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 30 May 2025 at 13:10.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Wakehurst Drive, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 27 Mar 2025 at 14:53.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Tyler Row To Smith Close, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 11:24.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Loriners, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 28 Mar 2025 at 09:25.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Tyler Road, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 28 Mar 2025 at 08:34.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Saddler Row 1 To 5, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 11:19.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Saddler Row, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 27 Mar 2025 at 14:48.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Wakehurst Drive 50 To 56, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 11:27.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Cooper Row, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 10:32.
5 Jun and 8 Aug 2025
West Sussex County Council were proposing to carry out Highway improvement works on Cooper Row, Southgate, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 5 June 2025 and run through until 8 August 2025. The works were due to impact the footway only.
This roadwork event was last updated by West Sussex County Council on 10 Mar 2025 at 10:47.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Shepherd Close, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 27 Mar 2025 at 15:01.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Mason Road 38 To 50, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 28 Mar 2025 at 08:46.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Collier Row, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 11:20.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Mason Road To 23, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 28 Mar 2025 at 09:26.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Mason Road 5 To 13, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 28 Mar 2025 at 09:19.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Mason Road, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 10 Mar 2025 at 10:11.
5 Jun and 8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Wakehurst Drive, Southgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 8 August 2025. The works will impact the footway only.
This roadwork event was last updated by West Sussex County Council on 27 Mar 2025 at 14:40.
5 and 11 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Rusper Road, Ifield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Mar 2025 at 14:47.
Saturday
West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 May 2025 at 09:59.
Saturday
West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2025 and could run through until 7 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 6 May 2025 at 11:13.
9 and 13 Jun 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on A23 J B2114 Leave S, Mid Sussex.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 8 May 2025 at 12:32.
9 and 13 Jun 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on A23 J B2114 Leave S, Mid Sussex.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 19 May 2025 at 07:23.
9 and 13 Jun 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Bewbush Drive, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 20 Mar 2025 at 12:37.
9 and 13 Jun 2025
Cornerstone Telecommunications Infrastructure were proposing to carry out Utility asset works on Bewbush Drive, Bewbush, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 27 May 2025 at 15:04.
9 and 15 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Dower Walk, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 15 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Mar 2025 at 12:24.
9 and 13 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 18 Mar 2025 at 12:01.
9 and 13 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 4 Apr 2025 at 14:37.
9 and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park View, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 09:11.
9 and 30 Jun 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Park View, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2025 and could run through until 30 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 May 2025 at 12:40.
10 and 16 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Dairyfields, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 27 Mar 2025 at 22:04.
10 and 16 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Dairyfields, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Mar 2025 at 14:45.
10 and 13 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Jan 2025 at 11:10.
11 and 17 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Oatlands, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Mar 2025 at 15:28.
11 and 17 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Oatlands, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 27 Mar 2025 at 22:08.
11 and 14 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Jan 2025 at 10:39.
12 and 18 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Dunsfold Close, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 May 2025 at 08:55.
12 and 18 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Dunsfold Close, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Mar 2025 at 14:39.
12 and 18 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Ryelands, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Mar 2025 at 14:01.
12 and 18 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Ryelands, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 08:45.
13 and 19 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Dormans, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Mar 2025 at 14:38.
13 and 19 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Dormans, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 31 Mar 2025 at 08:54.
13 and 16 Jun 2025
BT were proposing to carry out Utility asset works on Hophurst Lane, West Sussex, Crawley Down.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 June 2025 and run through until 16 June 2025. The works were due to impact the verge only.
This roadwork event was last updated by BT on 20 Mar 2025 at 10:41.
13 and 18 Jun 2025
West Sussex County Council are proposing to carry out Works for road purposes on Dorking Road, Kingsfold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 May 2025 at 09:33.
13 and 18 Jun 2025
West Sussex County Council are proposing to carry out Works for road purposes on Dorking Road, Kingsfold.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 May 2025 at 09:33.
14 Jun and 11 Aug 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Brighton Road, Tilgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 June 2025 and could run through until 11 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 24 Feb 2025 at 15:29.
15 and 22 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Dower Walk, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 May 2025 at 08:54.
15 and 17 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Woodlands Close, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 June 2025 and could run through until 17 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 22 May 2025 at 10:47.
16 and 19 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 19 May 2025 at 11:58.
16 and 19 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Coachmans Drive, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 19 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 19 May 2025 at 11:15.
16 and 22 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Bewbush Drive, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 26 Mar 2025 at 15:36.
16 and 30 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on North Road, Three Bridges, Crawley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 30 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 11:48.
16 and 30 Jun 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on West Avenue, Three Bridges, Crawley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 June 2025 and run through until 30 June 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 11:49.
17 and 20 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Woodlands Close, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 19 May 2025 at 12:10.
17 and 21 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Jan 2025 at 11:13.
17 and 21 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Mar 2025 at 15:18.
18 and 22 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Jan 2025 at 13:10.
18 and 22 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 June 2025 and could run through until 22 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 24 Mar 2025 at 14:11.
20 and 24 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Ifield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:37.
20 and 24 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Ifield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 24 Mar 2025 at 13:53.
23 Jun and 11 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Northgate Avenue, Northgate, Crawley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 19 Feb 2025 at 12:05.
23 Jun and 11 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Northgate Avenue, Northgate, Crawley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 11 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 13 Mar 2025 at 10:19.
23 and 27 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hophurst Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 14:14.
23 and 27 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hophurst Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 24 Mar 2025 at 11:49.
23 and 27 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felbridge Road, Felbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 14:20.
23 and 27 Jun 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felbridge Road, Felbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 24 Mar 2025 at 13:29.
24 and 26 Jun 2025
South East Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Balcombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 7 Apr 2025 at 16:04.
24 and 26 Jun 2025
South East Water are proposing to carry out Utility repair and maintenance works on Mill Lane, Balcombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 26 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by South East Water on 22 May 2025 at 15:49.
24 and 30 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Aintree Road, Furnace Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 Apr 2025 at 08:49.
24 and 30 Jun 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Epsom Road, Furnace Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Apr 2025 at 13:06.
25 Jun and 1 Jul 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Newmarket Road, Furnace Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Apr 2025 at 13:04.
25 and 29 Jun 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue Access Westbound, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 11:10.
25 and 29 Jun 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 June 2025 and could run through until 29 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 11:09.
27 Jun 2025
West Sussex County Council are proposing to carry out Highway improvement works on Mill Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 27 June 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Apr 2025 at 14:18.
27 Jun and 2 Jul 2025
Surrey County Council were proposing to carry out Highway repair and maintenance works on Reigate Road, Hookwood, Dorking Rural.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 June 2025 and run through until 2 July 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 3 Apr 2025 at 08:42.
28 Jun and 1 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Jan 2025 at 13:43.
28 Jun and 1 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Mar 2025 at 15:11.
29 Jun and 2 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 6 Jan 2025 at 14:45.
29 Jun and 2 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Jan 2025 at 15:41.
29 Jun and 2 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 24 Mar 2025 at 12:24.
30 Jun and 5 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Paddockhurst Road, Turners Hill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 1 May 2025 at 13:48.
30 Jun and 5 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Paddockhurst Road, Turners Hill.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 May 2025 at 10:09.
30 Jun and 3 Jul 2025
West Sussex County Council are proposing to carry out Remedial works on Horsham Road, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 30 Apr 2025 at 11:09.
30 Jun and 3 Jul 2025
West Sussex County Council are proposing to carry out Remedial works on Horsham Road, Gossops Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 3 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 30 Apr 2025 at 11:26.
30 Jun and 4 Jul 2025
UK Power Networks South Eastern were proposing to carry out New service connection on Vicarage Road, Crawley Down.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 June 2025 and run through until 4 July 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 10 Apr 2025 at 12:00.
30 Jun and 5 Jul 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 17:51.
30 Jun and 5 Jul 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 17:49.
30 Jun and 5 Jul 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Reigate Road, Hookwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 29 Nov 2024 at 18:07.
1 and 4 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Jan 2025 at 13:55.
1 and 4 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2025 and could run through until 4 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Apr 2025 at 10:59.
2 and 5 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Jan 2025 at 13:58.
2 and 5 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 July 2025 and could run through until 5 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Apr 2025 at 10:34.
3 and 6 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hophurst Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 27 Jan 2025 at 16:19.
3 and 6 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hophurst Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Apr 2025 at 11:43.
3 and 6 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felbridge Road, Felbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 27 Jan 2025 at 16:07.
3 and 6 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felbridge Road, Felbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Apr 2025 at 11:58.
3 and 6 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Ifield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Jan 2025 at 08:46.
3 and 6 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Ifield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 July 2025 and could run through until 6 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Apr 2025 at 10:37.
7 and 11 Jul 2025
West Sussex County Council are proposing to carry out Permanent reinstatement on Bewbush Drive, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 May 2025 at 11:25.
7 and 12 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Balcombe Road, Pound Hill, Crawley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2025 and could run through until 12 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 1 May 2025 at 13:44.
12 and 14 Jul 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Ifield Avenue, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 July 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 2 May 2025 at 09:02.
12 and 14 Jul 2025
Vodafone are proposing to carry out Utility repair and maintenance works on Ifield Avenue, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 July 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Vodafone on 6 May 2025 at 14:40.
14 and 17 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Highbrook Lane, West Hoathly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 17 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Apr 2025 at 09:23.
14 and 18 Jul 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Vicarage Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 25 Apr 2025 at 15:05.
14 and 18 Jul 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Vicarage Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 2 May 2025 at 09:31.
14 and 18 Jul 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Vicarage Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 2 May 2025 at 10:00.
14 and 18 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Ifield Avenue, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 22 Apr 2025 at 09:28.
14 and 18 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Ifield Avenue, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 23 Apr 2025 at 08:20.
14 and 19 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Manor Royal, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 May 2025 at 09:19.
14 and 16 Jul 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Lake View Road, Felbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2025 and could run through until 16 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 23 May 2025 at 13:11.
15 and 17 Jul 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Horsham Road, Pease Pottage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 24 Oct 2024 at 14:13.
15 and 17 Jul 2025
UK Power Networks South Eastern are proposing to carry out Utility asset works on Horsham Road, Pease Pottage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2025 and could run through until 17 July 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks South Eastern on 26 Oct 2024 at 15:19.
16 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Balcombe Lane, Ardingly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 16 July 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 2 Jun 2025 at 13:37.
17 and 20 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 20 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Jan 2025 at 14:20.
17 and 19 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2025 and could run through until 19 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 Apr 2025 at 15:31.
18 and 21 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 10 Jan 2025 at 14:23.
18 and 21 Jul 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 July 2025 and could run through until 21 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 3 Apr 2025 at 12:35.
21 Jul and 18 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Seymour Road, Broadfield, Crawley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 18 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 12:36.
21 Jul and 18 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Horsham Road, Southgate, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 18 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 07:37.
21 Jul and 18 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Horsham Road, Southgate, Crawley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 18 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 12:27.
21 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Turners Hill Road, Pound Hill, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 08:09.
21 Jul and 1 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Turners Hill Road, Pound Hill, Crawley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 1 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 11:45.
21 Jul and 5 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on North Road, Three Bridges, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 July 2025 and run through until 5 August 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 11:50.
23 Jul and 22 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, West Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 3 Apr 2025 at 14:11.
23 Jul and 22 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, West Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2025 at 09:08.
23 Jul and 22 Aug 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue, Ifield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 3 Apr 2025 at 14:02.
23 Jul and 22 Aug 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue, Ifield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 22 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2025 at 10:32.
23 Jul and 15 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Worth Road, Pound Hill, Crawley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 July 2025 and run through until 15 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 11:19.
23 Jul and 15 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Lane, Pound Hill, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 July 2025 and run through until 15 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 25 Mar 2025 at 11:26.
23 Jul and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Ifield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 8 Apr 2025 at 09:24.
23 Jul and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Ifield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2025 at 09:06.
23 Jul and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, West Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 4 Apr 2025 at 10:38.
23 Jul and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, West Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2025 at 09:04.
23 Jul and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 4 Apr 2025 at 10:27.
23 Jul and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 2 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 9 Apr 2025 at 10:22.
23 Jul and 1 Sep 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bramble Close, Copthorne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 10:44.
23 Jul and 12 Aug 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairway, Copthorne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 July 2025 and could run through until 12 August 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Apr 2025 at 10:43.
25 and 31 Jul 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 2 May 2025 at 08:26.
28 Jul and 29 Aug 2025
West Sussex County Council were proposing to carry out Highway improvement works on North Lane, West Hoathly.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 29 August 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 3 Jun 2025 at 14:02.
28 Jul and 29 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on North Lane, West Hoathly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 29 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 3 Jun 2025 at 14:51.
28 Jul and 18 Aug 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Sandringham Road, Broadfield, Crawley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 July 2025 and run through until 18 August 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 12:36.
28 and 31 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Balcombe Road, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Mar 2025 at 10:47.
28 and 31 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Worth Park Avenue, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Mar 2025 at 10:13.
28 and 31 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Road, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Mar 2025 at 11:00.
28 and 31 Jul 2025
West Sussex County Council are proposing to carry out Highway improvement works on Worth Park Avenue Roundabout, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 31 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Mar 2025 at 10:53.
28 Jul and 2 Aug 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Sangers Drive, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 July 2025 and could run through until 2 August 2025. The works will impact the footway only.
This roadwork event was last updated by Surrey County Council on 4 Mar 2025 at 16:08.
4 Aug and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, West Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 13 May 2025 at 08:53.
4 Aug and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Ifield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 August 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 13 May 2025 at 08:49.
6 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Orde Close, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 6 August 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 May 2025 at 14:11.
8 Aug 2025
West Sussex County Council are proposing to carry out Highway improvement works on Newtown, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 8 August 2025 and are due to last for only one day. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 May 2025 at 12:54.
8 and 11 Aug 2025
West Sussex County Council are proposing to carry out Works for road purposes on Radford Road, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 11 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Mar 2025 at 10:15.
8 and 10 Aug 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 August 2025 and could run through until 10 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 14 Mar 2025 at 15:17.
10 Aug and 3 Oct 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Tinsley Lane, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 August 2025 and could run through until 3 October 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 12 May 2025 at 14:57.
15 and 20 Aug 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 August 2025 and could run through until 20 August 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 21 Jan 2025 at 09:22.
18 Aug and 29 Sep 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Road, Pound Hill, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 August 2025 and run through until 29 September 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 11:46.
18 Aug and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, West Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 4 Apr 2025 at 11:07.
18 Aug and 2 Sep 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Ifield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 August 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 4 Apr 2025 at 10:58.
19 Aug and 6 Sep 2025
UK Power Networks South Eastern are proposing to carry out Statutory Infrastructure Works on Gatwick Road, Northgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 August 2025 and could run through until 6 September 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 13 May 2025 at 09:19.
21 and 25 Aug 2025
South East Water are proposing to carry out New service connection on Parish Lane, Pease Pottage.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 August 2025 and could run through until 25 August 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by South East Water on 13 May 2025 at 13:51.
26 and 30 Aug 2025
Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Bewbush Drive, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 August 2025 and could run through until 30 August 2025. The works will impact the verge only.
This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 28 May 2025 at 11:00.
Roadworks Map near to Balcombe Road, CRAWLEY, RH10 7ZR (Loading...)









- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Balcombe Road, CRAWLEY, RH10 7ZR (9 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Jun 2025 - 13 Jun 2025)
(Scheduled: 31 May 2025 - 4 Jun 2025)
Contains public sector information licensed under the Open Government Licence v3.0.