ROADWORKS SUMMARY
Stanier Close, CRAWLEY, RH10 7UX
Introduction
View current and future planned roadworks and road closures for Stanier Close, RH10 7UX and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Stanier Close, CRAWLEY, RH10 7UX
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Stanier Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
Tomorrow
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Pound Hill, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 30 Dec 2022 at 09:35.
Tomorrow
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Pound Hill, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 30 Dec 2022 at 09:41.
19 Feb 2024 and 18 Feb 2029
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2024 and could run through until 18 February 2029. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 12:37.
Friday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 1 Feb 2024 at 13:27.
2 Jun and 22 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on High Street, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 24 Nov 2023 at 15:14.
2 Jun and 22 Dec 2024
Surrey County Council are proposing to carry out Highway improvement works on Albert Road, Horley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 24 Nov 2023 at 15:14.
3 Jun and 3 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Langley Walk, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 3 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 13:47.
7 Jun and 7 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Fox Close, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 June 2024 and could run through until 7 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 13:02.
9 Jun and 22 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 June 2024 and could run through until 22 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 13 May 2024 at 07:28.
10 Jun and 10 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Scory Close, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 13:43.
10 Jun 2024 and 10 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 8 Jul 2024 at 09:18.
10 Jun and 10 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chestnut Walk, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 June 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 13:08.
11 Jun and 11 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Harting Court, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 15:14.
11 Jun and 11 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cuckfield Close, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 14:00.
11 Jun and 11 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cuckfield Close, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 14:12.
11 Jun and 11 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pyecombe Court, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 14:10.
11 Jun and 11 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hassocks Court, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 15:00.
11 Jun and 11 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Wiston Court, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 11 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 15:05.
31 Jul 2024 and 30 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley S/western Bypass Westbound, Broadfield, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:09.
31 Jul 2024 and 30 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Southbound, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.
31 Jul 2024 and 30 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Northbound, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Wheelers Lane, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:53.
14 Aug 2024 and 15 Feb 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:52.
16 Aug 2024 and 16 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 August 2024 and could run through until 16 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 10:58.
20 Aug 2024 and 20 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Drive, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 August 2024 and could run through until 20 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 11:00.
23 Aug 2024 and 23 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 August 2024 and could run through until 23 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 12:07.
23 Aug 2024 and 23 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Breezehurst Drive, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 August 2024 and could run through until 23 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 5 Aug 2024 at 11:50.
29 Aug 2024 and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Coachmans Drive, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 24 Jun 2024 at 12:15.
30 Aug 2024 and 2 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Pelham Drive, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 August 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 16 Aug 2024 at 09:31.
2 Sep 2024 and 2 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 September 2024 and could run through until 2 March 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 13 Aug 2024 at 10:10.
13 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Ifield Road, West Green, Crawley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 12:00 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 13:13.
4 Oct 2024 and 4 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Scory Close, Bewbush, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 4 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 21 Aug 2024 at 12:35.
4 Oct 2024 and 4 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chestnut Walk, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 4 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 21 Aug 2024 at 12:11.
14 Oct and 20 Dec 2024
Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Road, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Surrey County Council on 12 Aug 2024 at 07:09.
20 Dec 2024
Surrey County Council are carrying out Highway repair and maintenance works on Effingham Road, Copthorne.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 14 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 17 Oct 2024 at 11:53.
Saturday
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Radford Road, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 30 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 11:00.
12 Dec 2024
West Sussex County Council are carrying out Highway repair and maintenance works on Gatwick Road, Northgate, Crawley.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:30 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 13:19.
30 Oct and 11 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radford Road, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 13 Aug 2024 at 10:25.
30 Oct and 11 Dec 2024
Southern Gas Networks were proposing to carry out roadworks on Balcombe Road, Pound Hill, Crawley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 30 October 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 11:00.
5 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Goffs Lane, West Green, Crawley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 15:45 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 10:09.
5 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Snell Hatch, West Green, Crawley.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 15:45 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 15:59.
20 Dec 2024
West Sussex County Council are carrying out Highway improvement works on Haslett Avenue East, Three Bridges, Crawley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 09:33.
11 Nov and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Deerswood Road, West Green, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Aug 2024 at 12:20.
Thursday
UK Power Networks South Eastern are proposing to carry out New service connection on Brighton Road, Pease Pottage.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 November 2024 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Sep 2024 at 14:31.
Thursday
UK Power Networks South Eastern are carrying out New service connection on Brighton Road, Pease Pottage.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 08:00 and could run through until 28 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by UK Power Networks South Eastern on 13 Nov 2024 at 09:05.
Tuesday
Surrey County Council are carrying out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 20:15 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 14:15.
Tuesday
Surrey County Council are carrying out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 November 2024 at 20:14 and could run through until 26 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 14:16.
18 Nov and 6 Dec 2024
West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 7 Oct 2024 at 10:25.
18 Nov and 6 Dec 2024
Eunetworks are proposing to carry out Utility asset works on Radford Road, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 14 Oct 2024 at 10:37.
18 Nov and 6 Dec 2024
Eunetworks are proposing to carry out Utility asset works on Radford Road, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 30 Oct 2024 at 14:25.
18 Nov and 5 Dec 2024
Eunetworks are proposing to carry out Utility asset works on Radford Road, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 17:02.
5 Dec 2024
Eunetworks are carrying out Utility asset works on Radford Road, Crawley.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 18 November 2024 at 18:00 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Eunetworks on 19 Nov 2024 at 08:43.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:58.
Friday
Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 07:40.
21 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Meadowlands, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Aug 2024 at 12:47.
21 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ewhurst Road, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 15:16.
21 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ewhurst Close, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 15:21.
21 Nov and 13 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Reynolds Road, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 15:17.
Friday
UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Radford Road, Crawley.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 22 November 2024 at 18:44 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 22 Nov 2024 at 18:47.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on East Street, Turners Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 11:18.
Friday
UK Power Networks South Eastern are proposing to carry out New service connection on East Street, Turners Hill.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:18.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Princess Road, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:29.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leopold Road, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:28.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Close, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:27.
25 Nov and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 10:13.
25 Nov and 9 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Woolborough Lane, Northgate, Crawley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 12:53.
25 Nov and 9 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Woolborough Lane, Northgate, Crawley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 09:26.
25 Nov and 9 Dec 2024
Southern Gas Networks are proposing to carry out New service connection on Woolborough Lane, Northgate, Crawley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:56.
26 Nov and 10 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Gatwick Road, Northgate, Crawley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 Oct 2024 at 14:23.
26 Nov and 20 Dec 2024
Southern Water were proposing to carry out Utility repair and maintenance works on Prestwood Lane, Ifield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 November 2024 and run through until 20 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Southern Water on 27 Sep 2024 at 14:51.
Thursday
Southern Water are proposing to carry out Utility repair and maintenance works on Prestwood Lane, Ifield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Oct 2024 at 10:53.
Thursday
Southern Water are proposing to carry out Utility repair and maintenance works on Prestwood Lane, Ifield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 November 2024 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 12 Nov 2024 at 11:34.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:31.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alpha Road, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:30.
2 and 23 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Smalls Mead, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 13:34.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albany Road, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 12:25.
2 Dec 2024 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on The Dingle, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 08:44.
2 and 8 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 15:42.
2 and 8 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 15:36.
2 and 6 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 12:40.
3 and 5 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 15:50.
3 and 5 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 15:48.
5 Dec 2024 and 29 Jan 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Hazelwick Avenue, Three Bridges, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 15:33.
5 and 8 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 22 Nov 2024 at 07:48.
9 and 17 Dec 2024
West Sussex County Council are proposing to carry out Highway improvement works on Wallage Lane, Rowfant.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:37.
9 Dec 2024 and 12 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on High Street, Horley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Oct 2024 at 14:45.
9 Dec 2024 and 12 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on High Street, Horley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 12 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 5 Nov 2024 at 15:15.
11 and 15 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Creasys Drive, Broadfield, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 December 2024 and could run through until 15 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 22 Nov 2024 at 10:29.
23 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 21 Nov 2024 at 13:42.
23 and 27 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 2 Oct 2024 at 12:01.
2 Jan and 27 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fairway, Ifield, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 27 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 11:49.
2 Jan and 14 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:38.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Barn Road, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 08:36.
2 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 08:40.
6 and 24 Jan 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 09:21.
6 Jan and 7 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 12:31.
6 and 27 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 13:46.
6 and 30 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 08:27.
6 Jan and 1 Sep 2025
Surrey County Council are proposing to carry out Highway improvement works on High Street, Horley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and footpath.
This roadwork event was last updated by Surrey County Council on 24 Apr 2024 at 12:27.
13 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Langdale Road, Ifield, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:52.
13 and 24 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 8 Jul 2024 at 09:19.
13 Jan and 3 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Copthorne.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 13:00.
13 and 27 Jan 2025
Surrey County Council were proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 07:38.
15 and 20 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:48.
15 and 20 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 13:20.
15 and 21 Jan 2025
Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 6 Nov 2024 at 08:35.
20 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodcroft Road, Ifield, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:51.
20 Jan and 10 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Thirlmere Road, Ifield, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:55.
20 and 23 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Horley Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Nov 2024 at 10:08.
20 and 23 Jan 2025
Surrey County Council are proposing to carry out Highway repair and maintenance works on Charlwood Road, Charlwood, Dorking Rural.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Surrey County Council on 19 Nov 2024 at 10:10.
25 Jan and 8 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 11:07.
27 Jan and 12 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shipley Bridge Lane, Copthorne.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 12 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 14:34.
27 Jan and 7 Feb 2025
Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:59.
28 and 31 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:10.
28 and 31 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 11:49.
28 and 31 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:08.
28 and 31 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 11:43.
29 Jan and 7 Mar 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:09.
31 Jan and 22 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 17 Oct 2024 at 08:18.
3 and 7 Feb 2025
Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 11:29.
6 Feb and 12 Apr 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Tinsley Lane, Three Bridges, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 12 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 15:54.
6 and 12 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Fleming Way, Northgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:18.
10 and 11 Feb 2025
BT are proposing to carry out Utility asset works on Vowels Lane, West Hoathly.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 11 February 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 12 Nov 2024 at 13:20.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road, West Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:20.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road, West Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:39.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Langley Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:23.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Langley Green, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:40.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Northgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 12:31.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Northgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:36.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:13.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 10 Oct 2024 at 11:57.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:07.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 10:09.
10 Feb and 26 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:37.
13 and 28 Feb 2025
UK Power Networks South Eastern are proposing to carry out New service connection on Gatwick Road, Northgate, Crawley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 14 Nov 2024 at 11:20.
17 and 21 Feb 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:00.
18 and 24 Feb 2025
UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by UK Power Networks South Eastern on 27 Oct 2024 at 15:00.
Roadworks Map near to Stanier Close, CRAWLEY, RH10 7UX
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Stanier Close, CRAWLEY, RH10 7UX (17 Events)
(Scheduled Dates)
(miles)
(Scheduled: 21 Nov 2024 - 25 Nov 2024)
(Scheduled: 24 Nov 2024)
(Scheduled: 11 Nov 2024 - 20 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.