ROADWORKS SUMMARY
Pigeon Pass, Turners Hill Park, CRAWLEY, RH10 4QU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Pigeon Pass, Turners Hill Park, RH10 4QU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Pigeon Pass, Turners Hill Park, CRAWLEY, RH10 4QU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pigeon Pass, Turners Hill Park are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Surrey County Council logo
LONG TERM
Between
14 Aug 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Redehall Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Redehall Road, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:52.

Surrey County Council logo
LONG TERM
Between
14 Aug 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Wheelers Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wheelers Lane, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:53.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Dec 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Hazelwick Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Hazelwick Avenue, Three Bridges, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 15:33.

West Sussex County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 09:21.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 12:31.

West Sussex County Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 13:46.

West Sussex County Council logo
Between
7 and 30 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 12:35.

West Sussex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 15:45.

West Sussex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Crawley Avenue Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 15:41.

National Highways logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Crawley Avenue Roundabout

National Highways were proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 6 Dec 2024 at 11:25.

West Sussex County Council logo
Between
11 and 13 Jan 2025
Details
View Map
Share
Follow
Crawley Avenue Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 January 2025 and could run through until 13 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 15:48.

Surrey County Council logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Redehall Road

Surrey County Council were proposing to carry out Highway improvement works on Redehall Road, Smallfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 07:38.

West Sussex County Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Snow Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Dec 2024 at 14:56.

Southern Gas Networks logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Church Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Church Lane, Copthorne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 3 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 15:30.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Church Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 6 Nov 2024 at 08:35.

West Sussex County Council logo
Between
15 and 20 Jan 2025
Details
View Map
Share
Follow
Antlands Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 13:20.

West Sussex County Council logo
Between
15 and 20 Jan 2025
Details
View Map
Share
Follow
Antlands Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:48.

South East Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Priory Road

South East Water are proposing to carry out Remedial works on Priory Road, Forest Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 31 Oct 2024 at 10:44.

South East Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Priory Road

South East Water are proposing to carry out New service connection on Priory Road, Forest Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 10 Dec 2024 at 12:40.

South East Water logo
Between
21 and 23 Jan 2025
Details
View Map
Share
Follow
Priory Road

South East Water are proposing to carry out New service connection on Priory Road, Forest Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 9 Oct 2024 at 12:15.

West Sussex County Council logo
Between
25 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 11:07.

Surrey County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Redehall Road

Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:59.

Surrey County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Redehall Road

Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 12 Dec 2024 at 15:22.

West Sussex County Council logo
LONG TERM
Between
27 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Shipley Bridge Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shipley Bridge Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 14:34.

West Sussex County Council logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lindfield Road

West Sussex County Council are proposing to carry out Highway improvement works on Lindfield Road, Ardingly.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 12:32.

West Sussex County Council logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Lindfield Road

West Sussex County Council are proposing to carry out Highway improvement works on Lindfield Road, Ardingly.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 09:31.

West Sussex County Council logo
Between
29 Jan and 13 Feb 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Dec 2024 at 14:54.

West Sussex County Council logo
LONG TERM
Between
29 Jan and 7 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:09.

West Sussex County Council logo
Between
31 Jan and 22 Feb 2025
Details
View Map
Share
Turners Hill Road

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 22 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:57.

West Sussex County Council logo
Between
31 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Turners Hill Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 14:37.

West Sussex County Council logo
Between
31 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Turners Hill Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:54.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Church Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 07:40.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Dukes Head Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Dukes Head Roundabout, Copthorne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:56.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Copthorne Common

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Common, Copthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:25.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Copthorne Way Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way Roundabout, Copthorne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:28.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Copthorne Way

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way, Copthorne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:27.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Church Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 11:29.

Surrey County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
East Park Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 12:20.

Surrey County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
East Park Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 26 Nov 2024 at 14:46.

West Sussex County Council logo
Between
5 and 10 Feb 2025
Details
View Map
Share
Follow
Lingfield Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lingfield Road, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 11:30.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Blackberry Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 08:42.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Blackberry Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 11 Dec 2024 at 13:19.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Tinsley Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Tinsley Lane, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 15:54.

UK Power Networks South Eastern logo
Between
6 and 12 Feb 2025
Details
View Map
Share
Follow
Fleming Way

UK Power Networks South Eastern are proposing to carry out New service connection on Fleming Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:18.

Surrey County Council logo
Between
8 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Effingham Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Dec 2024 at 11:10.

BT logo
Between
10 and 11 Feb 2025
Details
View Map
Share
Follow
Vowels Lane

BT are proposing to carry out Utility asset works on Vowels Lane, West Hoathly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 11 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 12 Nov 2024 at 13:20.

UK Power Networks South Eastern logo
Between
13 and 28 Feb 2025
Details
View Map
Share
Follow
Gatwick Road

UK Power Networks South Eastern are proposing to carry out New service connection on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:36.

West Sussex County Council logo
LONG TERM
Between
15 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Hazelwick Avenue

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hazelwick Avenue, Three Bridges, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 31 March 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Dec 2024 at 12:47.

West Sussex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
North Lane

West Sussex County Council are proposing to carry out Highway improvement works on North Lane, West Hoathly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 11:20.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 11:29.

East Sussex County Council logo
Between
17 Feb and 15 Mar 2025
Details
View Map
Share
Follow
Hartfield Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Hartfield Road, Forest Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 4 Dec 2024 at 09:53.

Southern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Crawley Down Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 13:04.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 10:14.

West Sussex County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Dukes Head Roundabout

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 27 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:33.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
East Hill Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on East Hill Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Dec 2024 at 08:02.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
East Hill Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on East Hill Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Dec 2024 at 09:03.

West Sussex County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Vicarage Walk

West Sussex County Council were proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the footway and footpath.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 16:00.

West Sussex County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Vicarage Walk

West Sussex County Council are proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and footpath.

This roadwork event was last updated by West Sussex County Council on 20 Dec 2024 at 10:23.

West Sussex County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Vicarage Walk

West Sussex County Council are proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and footpath.

This roadwork event was last updated by West Sussex County Council on 13 Dec 2024 at 10:39.

West Sussex County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Dukes Head Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:04.

West Sussex County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Dukes Head Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 14:36.

West Sussex County Council logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Nov 2024 at 08:23.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Northbound

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Northbound, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:15.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Hazelwick Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Hazelwick Avenue, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:16.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Maxwell Way

West Sussex County Council are proposing to carry out Highway improvement works on Maxwell Way, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:12.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Northbound Slip

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Northbound Slip, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:17.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Southbound Slip

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Southbound Slip, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:18.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:13.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Manor Royal

West Sussex County Council are proposing to carry out Highway improvement works on Manor Royal, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:20.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:19.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Southbound, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:14.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Napier Way

West Sussex County Council are proposing to carry out Highway improvement works on Napier Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:20.

UK Power Networks South Eastern logo
Between
1 and 13 Mar 2025
Details
View Map
Share
Follow
Hazelwick Avenue Northbound

UK Power Networks South Eastern are proposing to carry out New service connection on Hazelwick Avenue Northbound, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:12.

UK Power Networks South Eastern logo
LONG TERM
Between
1 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Northgate Roundabout

UK Power Networks South Eastern are proposing to carry out New service connection on Northgate Roundabout, Three Bridges, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 8 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:17.

UK Power Networks South Eastern logo
Between
1 and 13 Mar 2025
Details
View Map
Share
Follow
North Road

UK Power Networks South Eastern are proposing to carry out New service connection on North Road, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:37.

UK Power Networks South Eastern logo
LONG TERM
Between
1 Mar and 8 Apr 2025
Details
View Map
Share
Follow
Crawley Avenue Access Westbound

UK Power Networks South Eastern are proposing to carry out New service connection on Crawley Avenue Access Westbound, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:11.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Broadbridge Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Broadbridge Lane, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Dec 2024 at 09:08.

West Sussex County Council logo
Between
4 and 11 Mar 2025
Details
View Map
Share
Follow
Beeching Way

West Sussex County Council are proposing to carry out Highway improvement works on Beeching Way, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Dec 2024 at 09:30.

West Sussex County Council logo
Between
6 and 24 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 12:54.

West Sussex County Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Holtye Road

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Holtye Road, East Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 12 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Dec 2024 at 14:09.

West Sussex County Council logo
Between
11 and 13 Mar 2025
Details
View Map
Share
Follow
Holtye Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Holtye Road, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 March 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 9 Dec 2024 at 14:24.

East Sussex County Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Priory Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Priory Road, Forest Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 17 Dec 2024 at 14:27.

UK Power Networks South Eastern logo
Between
18 Mar and 9 Apr 2025
Details
View Map
Share
Follow
Gatwick Road

UK Power Networks South Eastern are proposing to carry out New service connection on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 11 Dec 2024 at 14:36.

Southern Gas Networks logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Crawley Down Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 07:38.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
25 Mar and 8 Apr 2025
Details
View Map
Share
London Road

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on London Road, East Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 8 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:48.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
25 Mar and 8 Apr 2025
Details
View Map
Share
Beeching Way

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on Beeching Way, East Grinstead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 8 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:48.


Roadworks Map near to Pigeon Pass, Turners Hill Park, CRAWLEY, RH10 4QU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 27 Dec 2024 20:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Pigeon Pass, Turners Hill Park, CRAWLEY, RH10 4QU (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.