ROADWORKS SUMMARY
Sandy Lane, CRAWLEY, RH10 4HS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Sandy Lane, RH10 4HS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Sandy Lane, CRAWLEY, RH10 4HS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Sandy Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Pound Hill, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 30 Dec 2022 at 09:35.

West Sussex County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Pound Hill, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2024 and could run through until 25 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 30 Dec 2022 at 09:41.

West Sussex County Council logo
LONG TERM
Between
19 Feb 2024 and 18 Feb 2029
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 18 February 2029. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 12:37.

West Sussex County Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 1 Feb 2024 at 13:27.

Surrey County Council logo
LONG TERM
Between
2 Jun and 22 Dec 2024
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Nov 2023 at 15:14.

Surrey County Council logo
LONG TERM
Between
2 Jun and 22 Dec 2024
Details
View Map
Share
Follow
Albert Road

Surrey County Council are proposing to carry out Highway improvement works on Albert Road, Horley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 22 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 24 Nov 2023 at 15:14.

West Sussex County Council logo
LONG TERM
Between
9 Jun and 22 Dec 2024
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2024 and could run through until 22 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 13 May 2024 at 07:28.

West Sussex County Council logo
LONG TERM
Between
10 Jun 2024 and 10 Jan 2025
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 8 Jul 2024 at 09:18.

West Sussex County Council logo
LONG TERM
Between
10 Jun and 10 Dec 2024
Details
View Map
Share
Follow
Chestnut Walk

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chestnut Walk, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 15 Feb 2024 at 13:08.

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.

Surrey County Council logo
LONG TERM
Between
14 Aug 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Wheelers Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wheelers Lane, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:53.

Surrey County Council logo
LONG TERM
Between
14 Aug 2024 and 15 Feb 2025
Details
View Map
Share
Follow
Redehall Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Redehall Road, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:52.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
West Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Street, Dormansland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 29 November 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 10 Jul 2024 at 11:27.

West Sussex County Council logo
LONG TERM
Between
4 Oct 2024 and 4 Apr 2025
Details
View Map
Share
Follow
Chestnut Walk

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chestnut Walk, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 October 2024 and could run through until 4 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 21 Aug 2024 at 12:11.

Southern Gas Networks logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
West Street

Southern Gas Networks are carrying out Utility repair and maintenance works on West Street, Dormansland.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 October 2024 at 10:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:09.

Surrey County Council logo
LONG TERM
Between
14 Oct and 20 Dec 2024
Details
View Map
Share
Follow
Effingham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Road, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 12 Aug 2024 at 07:09.

Surrey County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Effingham Road

Surrey County Council are carrying out Highway repair and maintenance works on Effingham Road, Copthorne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 October 2024 at 08:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 17 Oct 2024 at 11:53.

Southern Gas Networks logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Radford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Radford Road, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 October 2024 and run through until 30 November 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 11:00.

West Sussex County Council logo
LONG TERM
Until
12 Dec 2024
Details
View Map
Share
Follow
Gatwick Road

West Sussex County Council are carrying out Highway repair and maintenance works on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 October 2024 at 09:30 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 13:19.

Southern Gas Networks logo
LONG TERM
Between
30 Oct and 11 Dec 2024
Details
View Map
Share
Follow
Radford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radford Road, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 October 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Aug 2024 at 10:25.

Southern Gas Networks logo
LONG TERM
Between
30 Oct and 11 Dec 2024
Details
View Map
Share
Balcombe Road

Southern Gas Networks were proposing to carry out roadworks on Balcombe Road, Pound Hill, Crawley.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 11 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 15 Oct 2024 at 11:00.

West Sussex County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Haslett Avenue East

West Sussex County Council are carrying out Highway improvement works on Haslett Avenue East, Three Bridges, Crawley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:30 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 09:33.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Finishing
Tomorrow
Details
View Map
Share
Beeching Way

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on Beeching Way, East Grinstead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 25 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 7 Oct 2024 at 10:33.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Finishing
Tomorrow
Details
View Map
Share
London Road

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on London Road, East Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 25 November 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 7 Oct 2024 at 10:31.

Southern Gas Networks logo
Between
11 Nov and 6 Dec 2024
Details
View Map
Share
Newhache

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Newhache, Dormansland.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 6 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 09:49.

West Sussex County Council logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 7 Oct 2024 at 10:25.

Southern Gas Networks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Crawley Down Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 09:23.

Eunetworks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Radford Road

Eunetworks are proposing to carry out Utility asset works on Radford Road, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 14 Oct 2024 at 10:37.

Eunetworks logo
Between
18 Nov and 6 Dec 2024
Details
View Map
Share
Follow
Radford Road

Eunetworks are proposing to carry out Utility asset works on Radford Road, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 30 Oct 2024 at 14:25.

Eunetworks logo
Between
18 Nov and 5 Dec 2024
Details
View Map
Share
Follow
Radford Road

Eunetworks are proposing to carry out Utility asset works on Radford Road, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 5 Nov 2024 at 17:02.

Eunetworks logo
Until
5 Dec 2024
Details
View Map
Share
Follow
Radford Road

Eunetworks are carrying out Utility asset works on Radford Road, Crawley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 18:00 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Eunetworks on 19 Nov 2024 at 08:43.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
East Hill Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:58.

Surrey County Council logo
Finishing
Friday
Details
View Map
Share
Follow
East Hill Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Hill Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 13 Nov 2024 at 07:40.

Southern Gas Networks logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Kinnibrugh Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kinnibrugh Drive, Dormansland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Sep 2024 at 11:39.

Southern Gas Networks logo
Finishing
Tuesday
Details
View Map
Share
Follow
Crawley Down Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Crawley Down Road, Felbridge.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 November 2024 at 10:00 and could run through until 26 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 14:42.

Southern Gas Networks logo
Between
21 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Reynolds Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Reynolds Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Aug 2024 at 15:17.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
Radford Road

UK Power Networks South Eastern are carrying out Utility repair and maintenance works on Radford Road, Crawley.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 22 November 2024 at 18:44 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 22 Nov 2024 at 18:47.

South East Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Horsted Lane

South East Water are proposing to carry out New service connection on Horsted Lane, Sharpthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 14 Oct 2024 at 10:19.

South East Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Horsted Lane

South East Water are proposing to carry out New service connection on Horsted Lane, Sharpthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 4 Nov 2024 at 14:45.

South East Water logo
Finishing
Wednesday
Details
View Map
Share
Follow
Horsted Lane

South East Water are proposing to carry out New service connection on Horsted Lane, Sharpthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 27 November 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 22 Nov 2024 at 10:52.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
East Street

UK Power Networks South Eastern are proposing to carry out New service connection on East Street, Turners Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 16 Oct 2024 at 11:18.

UK Power Networks South Eastern logo
Finishing
Friday
Details
View Map
Share
Follow
East Street

UK Power Networks South Eastern are proposing to carry out New service connection on East Street, Turners Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:18.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Princess Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Princess Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:29.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Leopold Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Leopold Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:28.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Lodge Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lodge Close, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:27.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Town Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Jul 2024 at 10:13.

Southern Gas Networks logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Woolborough Lane

Southern Gas Networks are proposing to carry out New service connection on Woolborough Lane, Northgate, Crawley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 12:53.

Southern Gas Networks logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Woolborough Lane

Southern Gas Networks are proposing to carry out New service connection on Woolborough Lane, Northgate, Crawley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 09:26.

Southern Gas Networks logo
Between
25 Nov and 9 Dec 2024
Details
View Map
Share
Follow
Woolborough Lane

Southern Gas Networks are proposing to carry out New service connection on Woolborough Lane, Northgate, Crawley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 11:56.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Hollow Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollow Lane, Dormansland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:14.

Southern Gas Networks logo
Between
25 Nov and 23 Dec 2024
Details
View Map
Share
Follow
Dormans Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dormans Road, Dormansland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:12.

West Sussex County Council logo
Between
26 Nov and 10 Dec 2024
Details
View Map
Share
Follow
Gatwick Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 23 Oct 2024 at 14:23.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Church Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Street, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:31.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Alpha Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Alpha Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 31 Oct 2024 at 11:30.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Smalls Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Smalls Mead, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Nov 2024 at 13:34.

West Sussex County Council logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 15:42.

West Sussex County Council logo
Between
2 and 8 Dec 2024
Details
View Map
Share
Follow
Crawley Avenue Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 15:36.

West Sussex County Council logo
Between
2 and 6 Dec 2024
Details
View Map
Share
Follow
Crawley Avenue Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crawley Avenue Roundabout, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 12:40.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Crawley Down Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 11:34.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Newhache

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Newhache, Dormansland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 07:10.

Southern Gas Networks logo
Between
2 and 23 Dec 2024
Details
View Map
Share
Follow
Kinnibrugh Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Kinnibrugh Drive, Dormansland.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 08:16.

West Sussex County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 15:50.

West Sussex County Council logo
Between
3 and 5 Dec 2024
Details
View Map
Share
Follow
Haslett Avenue West

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 5 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 15:48.

UK Power Networks South Eastern logo
LONG TERM
Between
5 Dec 2024 and 29 Jan 2025
Details
View Map
Share
Follow
Hazelwick Avenue

UK Power Networks South Eastern are proposing to carry out New service connection on Hazelwick Avenue, Three Bridges, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 19 Nov 2024 at 15:33.

West Sussex County Council logo
Between
5 and 8 Dec 2024
Details
View Map
Share
Follow
Snow Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 8 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 22 Nov 2024 at 07:48.

West Sussex County Council logo
Between
9 and 17 Dec 2024
Details
View Map
Share
Follow
Wallage Lane

West Sussex County Council are proposing to carry out Highway improvement works on Wallage Lane, Rowfant.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 17 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:37.

West Sussex County Council logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 26 Sep 2024 at 11:40.

West Sussex County Council logo
Between
9 and 20 Dec 2024
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 26 Sep 2024 at 12:13.

Surrey County Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
Felcourt Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Felcourt Road, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.

Surrey County Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
Felcourt Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Felcourt Road, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:05.

Surrey County Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
Blackberry Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackberry Lane, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.

Surrey County Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
Blackberry Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Blackberry Lane, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:05.

Surrey County Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
East Grinstead Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Grinstead Road, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 11 Sep 2024 at 11:51.

Surrey County Council logo
Between
9 and 21 Dec 2024
Details
View Map
Share
Follow
East Grinstead Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Grinstead Road, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 21 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 2 Oct 2024 at 07:06.

Network Rail logo
LONG TERM
Between
9 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
High Street

Network Rail are proposing to carry out Works for Rail Purposes on High Street, Horley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Oct 2024 at 14:45.

Network Rail logo
LONG TERM
Between
9 Dec 2024 and 12 Jan 2025
Details
View Map
Share
Follow
High Street

Network Rail are proposing to carry out Works for Rail Purposes on High Street, Horley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 12 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Nov 2024 at 15:15.

Network Rail logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 21 Nov 2024 at 13:42.

Network Rail logo
Between
23 and 27 Dec 2024
Details
View Map
Share
Follow
Station Road

Network Rail are proposing to carry out Works for Rail Purposes on Station Road, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 27 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 2 Oct 2024 at 12:01.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 14 Feb 2025
Details
View Map
Share
Town Mead

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:38.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Town Barn Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Barn Road, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 08:36.

Southern Gas Networks logo
LONG TERM
Between
2 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Town Mead

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Aug 2024 at 08:40.

West Sussex County Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 09:21.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Balcombe.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 12:31.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Church Lane

West Sussex County Council are proposing to carry out Highway improvement works on Church Lane, East Grinstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 16 May 2024 at 07:26.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
De La Warr Road

West Sussex County Council are proposing to carry out Highway improvement works on De La Warr Road, East Grinstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 16 May 2024 at 08:32.

West Sussex County Council logo
Between
6 and 27 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 13:46.

West Sussex County Council logo
Between
6 and 30 Jan 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 08:27.

Surrey County Council logo
LONG TERM
Between
6 Jan and 1 Sep 2025
Details
View Map
Share
Follow
High Street

Surrey County Council are proposing to carry out Highway improvement works on High Street, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 1 September 2025. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Surrey County Council on 24 Apr 2024 at 12:27.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitewood Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 15 Oct 2024 at 11:43.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Whitewood Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on Whitewood Lane, South Godstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 16 Oct 2024 at 08:53.

West Sussex County Council logo
Between
13 and 24 Jan 2025
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 8 Jul 2024 at 09:19.

Southern Gas Networks logo
Between
13 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Church Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Lane, Copthorne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 3 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 13:00.

Surrey County Council logo
Between
13 and 27 Jan 2025
Details
View Map
Share
Redehall Road

Surrey County Council were proposing to carry out Highway improvement works on Redehall Road, Smallfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 27 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 18 Oct 2024 at 07:38.

West Sussex County Council logo
Between
15 and 20 Jan 2025
Details
View Map
Share
Follow
Antlands Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:48.

West Sussex County Council logo
Between
15 and 20 Jan 2025
Details
View Map
Share
Follow
Antlands Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 20 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 13:20.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Church Road

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 January 2025 and run through until 21 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 6 Nov 2024 at 08:35.

West Sussex County Council logo
Between
25 Jan and 8 Feb 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 8 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 11:07.

West Sussex County Council logo
LONG TERM
Between
27 Jan and 12 Apr 2025
Details
View Map
Share
Follow
Shipley Bridge Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shipley Bridge Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 14:34.

Surrey County Council logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Redehall Road

Surrey County Council are proposing to carry out Highway improvement works on Redehall Road, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Surrey County Council on 31 Oct 2024 at 08:59.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:10.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Friary Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Friary Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 11:49.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Haslett Avenue West

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:08.

West Sussex County Council logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Follow
Haslett Avenue West

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Haslett Avenue West, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 11:43.

West Sussex County Council logo
LONG TERM
Between
29 Jan and 7 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:09.

West Sussex County Council logo
Between
31 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Turners Hill Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 17 Oct 2024 at 08:18.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Church Road

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Church Road, Burstow, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Nov 2024 at 11:29.

Surrey County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
East Park Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 12:20.

Surrey County Council logo
Between
4 and 6 Feb 2025
Details
View Map
Share
Follow
East Park Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on East Park Lane, Newchapel, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 6 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Nov 2024 at 12:52.

West Sussex County Council logo
Between
5 and 10 Feb 2025
Details
View Map
Share
Follow
Lingfield Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lingfield Road, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 10 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 8 Nov 2024 at 11:30.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
5 and 11 Feb 2025
Details
View Map
Share
Follow
Blackberry Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Blackberry Lane, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 19 Nov 2024 at 08:42.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Feb and 12 Apr 2025
Details
View Map
Share
Follow
Tinsley Lane

UK Power Networks South Eastern are proposing to carry out New service connection on Tinsley Lane, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Nov 2024 at 15:54.

UK Power Networks South Eastern logo
Between
6 and 12 Feb 2025
Details
View Map
Share
Follow
Fleming Way

UK Power Networks South Eastern are proposing to carry out New service connection on Fleming Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 12 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 21 Nov 2024 at 14:18.

BT logo
Between
10 and 11 Feb 2025
Details
View Map
Share
Follow
Vowels Lane

BT are proposing to carry out Utility asset works on Vowels Lane, West Hoathly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 11 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 12 Nov 2024 at 13:20.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, West Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:20.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, West Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:39.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:23.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:40.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 12:31.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:36.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:13.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Oct 2024 at 11:57.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:07.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 10:09.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:37.

UK Power Networks South Eastern logo
Between
13 and 28 Feb 2025
Details
View Map
Share
Follow
Gatwick Road

UK Power Networks South Eastern are proposing to carry out New service connection on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Nov 2024 at 11:20.

West Sussex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
North Lane

West Sussex County Council are proposing to carry out Highway improvement works on North Lane, West Hoathly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 11:20.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:00.

Southern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Crawley Down Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 13:04.

UK Power Networks South Eastern logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Oct 2024 at 15:00.


Roadworks Map near to Sandy Lane, CRAWLEY, RH10 4HS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 07:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Sandy Lane, CRAWLEY, RH10 4HS (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South East Water logo
TURNERS HILL ROAD 
(0.9 miles)
South East Water
New service connection - Footway, Carriageway, Verge - Two-way signals
Planned
Scheduled: 23 Nov 2024 - 24 Nov 2024
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.