ROADWORKS SUMMARY
Clockfield, CRAWLEY, RH10 4AR

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Clockfield, RH10 4AR and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Clockfield, CRAWLEY, RH10 4AR

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Clockfield are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
19 Feb 2024 and 18 Feb 2029
Details
View Map
Share
Follow
The Boulevard

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Boulevard, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2024 and could run through until 18 February 2029. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 19 Feb 2024 at 12:37.

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.

West Sussex County Council logo
LONG TERM
Between
31 Jul 2024 and 30 Mar 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 July 2024 and could run through until 30 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 10 May 2024 at 08:12.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Wheelers Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Wheelers Lane, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:53.

Surrey County Council logo
LONG TERM
Finishing
Saturday
Details
View Map
Share
Follow
Redehall Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Redehall Road, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2024 and could run through until 15 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Surrey County Council on 13 May 2024 at 05:52.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Town Mead

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 January 2025 and run through until 14 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 08:38.

West Sussex County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
North Street

West Sussex County Council are carrying out Highway improvement works on North Street, Turners Hill.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 20:46 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 14:01.

West Sussex County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Antlands Lane

West Sussex County Council are carrying out Highway improvement works on Antlands Lane, Tinsley Green, Crawley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2025 at 13:23 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 10:24.

West Sussex County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Lindfield Road

West Sussex County Council are proposing to carry out Highway improvement works on Lindfield Road, Ardingly.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 09:31.

West Sussex County Council logo
LONG TERM
Until
12 Apr 2025
Details
View Map
Share
Follow
Shipley Bridge Lane

West Sussex County Council are carrying out Highway repair and maintenance works on Shipley Bridge Lane, Copthorne.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 09:30 and could run through until 12 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Jan 2025 at 10:52.

West Sussex County Council logo
LONG TERM
Between
29 Jan and 7 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Nov 2024 at 10:09.

West Sussex County Council logo
Finishing
Today
Details
View Map
Share
London Road

West Sussex County Council were proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 29 January 2025 and run through until 13 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Feb 2025 at 15:56.

West Sussex County Council logo
Between
31 Jan and 22 Feb 2025
Details
View Map
Share
Follow
Turners Hill Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 January 2025 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:54.

West Sussex County Council logo
Until
22 Feb 2025
Details
View Map
Share
Follow
Turners Hill Road

West Sussex County Council are carrying out Highway repair and maintenance works on Turners Hill Road, Crawley Down.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 February 2025 at 17:30 and could run through until 22 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Feb 2025 at 15:37.

West Sussex County Council logo
Between
31 Jan and 22 Feb 2025
Details
View Map
Share
Turners Hill Road

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Turners Hill Road, Crawley Down.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 22 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 12:57.

West Sussex County Council logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Lindfield Road

West Sussex County Council are carrying out Highway improvement works on Lindfield Road, Ardingly.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 07:30 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Feb 2025 at 08:39.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Copthorne Way

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way, Copthorne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:27.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Copthorne Way Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Way Roundabout, Copthorne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:28.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Copthorne Common

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Common, Copthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:25.

West Sussex County Council logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Copthorne Common

West Sussex County Council are carrying out Highway improvement works on Copthorne Common, Copthorne.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:30 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Feb 2025 at 09:43.

West Sussex County Council logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Dukes Head Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Dukes Head Roundabout, Copthorne.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 18 Dec 2024 at 10:56.

West Sussex County Council logo
Until
21 Feb 2025
Details
View Map
Share
Follow
Dukes Head Roundabout

West Sussex County Council are carrying out Highway improvement works on Dukes Head Roundabout, Copthorne.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 09:30 and could run through until 21 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Feb 2025 at 09:42.

UK Power Networks South Eastern logo
LONG TERM
Between
6 Feb and 12 Apr 2025
Details
View Map
Share
Tinsley Lane

UK Power Networks South Eastern were proposing to carry out New service connection on Tinsley Lane, Three Bridges, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 February 2025 and run through until 12 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 15:04.

Surrey County Council logo
Between
8 Feb and 8 Mar 2025
Details
View Map
Share
Effingham Lane

Surrey County Council were proposing to carry out Highway repair and maintenance works on Effingham Lane, Copthorne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 February 2025 and run through until 8 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 20 Jan 2025 at 09:56.

Surrey County Council logo
Between
8 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Effingham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Road, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 23 Jan 2025 at 07:25.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, West Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:20.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are carrying out Highway improvement works on London Road, West Green, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:30 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 08:28.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:23.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are carrying out Highway improvement works on Crawley Avenue, Langley Green, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:30 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 08:32.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on London Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 12:31.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
London Road Roundabout

West Sussex County Council are carrying out Highway improvement works on London Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 09:30 and could run through until 26 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 09:34.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:13.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are carrying out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:30 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 08:29.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 10:07.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 10:09.

West Sussex County Council logo
LONG TERM
Until
26 Mar 2025
Details
View Map
Share
Follow
London Road Southbound

West Sussex County Council are carrying out Highway improvement works on London Road Southbound, Crawley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 07:30 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 08:31.

West Sussex County Council logo
LONG TERM
Between
10 Feb and 6 Jun 2025
Details
View Map
Share
Follow
Manor Royal

West Sussex County Council are proposing to carry out Highway improvement works on Manor Royal, Northgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:06.

West Sussex County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Snow Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Snow Hill, Crawley Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 8 Jan 2025 at 13:42.

UK Power Networks South Eastern logo
Between
10 and 27 Feb 2025
Details
View Map
Share
Elger Way

UK Power Networks South Eastern were proposing to carry out Diversionary works on Elger Way, Copthorne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 27 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 12:17.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Blackberry Lane

Ses Water (formerly Sutton & East Surrey Water Company) are carrying out Utility repair and maintenance works on Blackberry Lane, Lingfield.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 February 2025 at 10:16 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Feb 2025 at 11:21.

UK Power Networks South Eastern logo
Between
13 and 28 Feb 2025
Details
View Map
Share
Gatwick Road

UK Power Networks South Eastern were proposing to carry out New service connection on Gatwick Road, Northgate, Crawley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 February 2025 and run through until 28 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 15:05.

West Sussex County Council logo
LONG TERM
Between
15 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Hazelwick Avenue

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hazelwick Avenue, Three Bridges, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 February 2025 and could run through until 31 March 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 7 Jan 2025 at 14:14.

West Sussex County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beeching Way

West Sussex County Council are proposing to carry out Highway improvement works on Beeching Way, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 15:34.

West Sussex County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beeching Way

West Sussex County Council are proposing to carry out Highway improvement works on Beeching Way, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 11 Feb 2025 at 12:11.

West Sussex County Council logo
Finishing
Monday
Details
View Map
Share
Redbridge Lane

West Sussex County Council were proposing to carry out Highway improvement works on Redbridge Lane, Balcombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 17 February 2025 The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 3 Feb 2025 at 10:29.

West Sussex County Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
North Lane

West Sussex County Council are proposing to carry out Highway improvement works on North Lane, West Hoathly.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 11:20.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Oct 2024 at 14:00.

UK Power Networks South Eastern logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 31 Jan 2025 at 13:04.

West Sussex County Council logo
Finishing
Monday
Details
View Map
Share
West Hoathly Road

West Sussex County Council were proposing to carry out Highway improvement works on West Hoathly Road, East Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were scheduled for 17 February 2025 The works were due to impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 3 Feb 2025 at 10:29.

West Sussex County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Beeching Way

West Sussex County Council are proposing to carry out Highway improvement works on Beeching Way, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 15:43.

Southern Gas Networks logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Crawley Down Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 13:04.

Southern Gas Networks logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Shipley Bridge Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Shipley Bridge Lane, Copthorne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 10 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Jan 2025 at 13:52.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 6 Dec 2024 at 10:14.

West Sussex County Council logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Balcombe Road

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Balcombe Road, Tinsley Green, Crawley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 24 Jan 2025 at 12:27.

UK Power Networks South Eastern logo
Between
18 and 24 Feb 2025
Details
View Map
Share
Follow
Winchester Road

UK Power Networks South Eastern are proposing to carry out Disconnection or alteration of supply on Winchester Road, Tilgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 24 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 27 Oct 2024 at 15:00.

West Sussex County Council logo
Between
20 and 23 Feb 2025
Details
View Map
Share
Follow
Imberhorne Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Imberhorne Lane, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 February 2025 and could run through until 23 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Jan 2025 at 14:36.

UK Power Networks South Eastern logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chanctonbury Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Chanctonbury Way, Southgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 24 Dec 2024 at 08:23.

UK Power Networks South Eastern logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chanctonbury Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Chanctonbury Way, Southgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 14 Jan 2025 at 12:07.

UK Power Networks South Eastern logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chanctonbury Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Chanctonbury Way, Southgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 20 Jan 2025 at 16:18.

UK Power Networks South Eastern logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chanctonbury Way

UK Power Networks South Eastern are proposing to carry out Utility asset works on Chanctonbury Way, Southgate, Crawley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 5 Feb 2025 at 15:42.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Town Barn Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Barn Road, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 15:30.

Southern Gas Networks logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Town Mead

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Town Mead, West Green, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 15:30.

West Sussex County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Vicarage Walk

West Sussex County Council are proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and footpath.

This roadwork event was last updated by West Sussex County Council on 13 Dec 2024 at 10:39.

West Sussex County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Vicarage Walk

West Sussex County Council are proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the footway and footpath.

This roadwork event was last updated by West Sussex County Council on 20 Dec 2024 at 10:23.

West Sussex County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Vicarage Walk

West Sussex County Council were proposing to carry out Highway improvement works on Vicarage Walk, East Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the footway and footpath.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 16:00.

West Sussex County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Dukes Head Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:04.

West Sussex County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Dukes Head Roundabout

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 14:36.

West Sussex County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Dukes Head Roundabout

West Sussex County Council were proposing to carry out Highway repair and maintenance works on Dukes Head Roundabout, Copthorne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 27 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 27 Nov 2024 at 13:33.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
East Hill Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on East Hill Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Dec 2024 at 09:03.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
East Hill Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out New service connection on East Hill Lane, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 23 Dec 2024 at 08:02.

West Sussex County Council logo
Between
24 and 27 Feb 2025
Details
View Map
Share
Follow
Antlands Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 27 Jan 2025 at 11:17.

Surrey County Council logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Effingham Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Effingham Road, Copthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Feb 2025 at 13:11.

West Sussex County Council logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Nov 2024 at 08:23.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Southbound

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Southbound, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:14.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Napier Way

West Sussex County Council are proposing to carry out Highway improvement works on Napier Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:20.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Hazelwick Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Hazelwick Avenue, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:16.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Northbound

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Northbound, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:15.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Maxwell Way

West Sussex County Council are proposing to carry out Highway improvement works on Maxwell Way, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:12.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Northbound Slip

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Northbound Slip, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:17.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Southbound Slip

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Southbound Slip, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:18.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:13.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Manor Royal

West Sussex County Council are proposing to carry out Highway improvement works on Manor Royal, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:20.

West Sussex County Council logo
Between
26 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Gatwick Road Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Gatwick Road Roundabout, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Oct 2024 at 14:19.

West Sussex County Council logo
Between
27 Feb and 1 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Jan 2025 at 11:52.

UK Power Networks South Eastern logo
Between
1 and 13 Mar 2025
Details
View Map
Share
Hazelwick Avenue Northbound

UK Power Networks South Eastern were proposing to carry out New service connection on Hazelwick Avenue Northbound, Three Bridges, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 15:05.

UK Power Networks South Eastern logo
Between
1 and 13 Mar 2025
Details
View Map
Share
North Road

UK Power Networks South Eastern were proposing to carry out New service connection on North Road, Three Bridges, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 13 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 15:06.

UK Power Networks South Eastern logo
LONG TERM
Between
1 Mar and 8 Apr 2025
Details
View Map
Share
Northgate Roundabout

UK Power Networks South Eastern were proposing to carry out New service connection on Northgate Roundabout, Three Bridges, Crawley.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 8 April 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 15:06.

UK Power Networks South Eastern logo
LONG TERM
Between
1 Mar and 8 Apr 2025
Details
View Map
Share
Crawley Avenue Access Westbound

UK Power Networks South Eastern were proposing to carry out New service connection on Crawley Avenue Access Westbound, Pound Hill, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 8 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 15:06.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Broadbridge Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Broadbridge Lane, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 12 Dec 2024 at 09:08.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Broadbridge Lane

Ses Water (formerly Sutton & East Surrey Water Company) were proposing to carry out Utility asset works on Broadbridge Lane, Smallfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 13 Jan 2025 at 09:31.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Broadbridge Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility asset works on Broadbridge Lane, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Jan 2025 at 09:05.

West Sussex County Council logo
Between
4 and 11 Mar 2025
Details
View Map
Share
Turners Hill Road

West Sussex County Council were proposing to carry out Highway improvement works on Turners Hill Road, East Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 11 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 13 Jan 2025 at 07:37.

West Sussex County Council logo
Between
4 and 11 Mar 2025
Details
View Map
Share
Follow
Beeching Way

West Sussex County Council are proposing to carry out Highway improvement works on Beeching Way, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Dec 2024 at 09:30.

West Sussex County Council logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Hophurst Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hophurst Hill, Crawley Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Jan 2025 at 08:52.

West Sussex County Council logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Felbridge Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felbridge Road, Felbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Jan 2025 at 10:08.

West Sussex County Council logo
Between
6 and 24 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, Langley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 March 2025 and could run through until 24 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Dec 2024 at 12:54.

West Sussex County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
The Broadway

West Sussex County Council are proposing to carry out Highway improvement works on The Broadway, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 28 Nov 2024 at 11:13.

West Sussex County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
The Broadway

West Sussex County Council are proposing to carry out Highway improvement works on The Broadway, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:28.

West Sussex County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Antlands Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Antlands Lane, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 24 Jan 2025 at 11:08.

West Sussex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Kelvin Way

West Sussex County Council are proposing to carry out Highway improvement works on Kelvin Way, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 10:56.

West Sussex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Kelvin Lane

West Sussex County Council are proposing to carry out Highway improvement works on Kelvin Lane, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 13:48.

West Sussex County Council logo
Between
13 and 15 Mar 2025
Details
View Map
Share
Follow
Faraday Road

West Sussex County Council are proposing to carry out Highway improvement works on Faraday Road, Northgate, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 09:29.

East Sussex County Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Priory Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Priory Road, Forest Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 17 Dec 2024 at 14:27.

West Sussex County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Hophurst Hill

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Hophurst Hill, Crawley Down.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 14:13.

West Sussex County Council logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Felbridge Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felbridge Road, Felbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 14:16.

West Sussex County Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on London Road, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 13:24.

UK Power Networks South Eastern logo
Between
18 Mar and 9 Apr 2025
Details
View Map
Share
Gatwick Road

UK Power Networks South Eastern were proposing to carry out New service connection on Gatwick Road, Northgate, Crawley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 March 2025 and run through until 9 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 16:06.

Southern Gas Networks logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Crawley Down Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crawley Down Road, Felbridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 07:38.

Surrey County Council logo
Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Cogmans Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cogmans Lane, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 31 Jan 2025 at 14:51.

Surrey County Council logo
Between
24 and 31 Mar 2025
Details
View Map
Share
Follow
Cogmans Lane

Surrey County Council are proposing to carry out Highway repair and maintenance works on Cogmans Lane, Smallfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 5 Feb 2025 at 14:40.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
25 Mar and 8 Apr 2025
Details
View Map
Share
Beeching Way

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on Beeching Way, East Grinstead.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 8 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:48.

Energy Assets Networks (formerly Utility Distribution Networks) logo
Between
25 Mar and 8 Apr 2025
Details
View Map
Share
London Road

Energy Assets Networks (formerly Utility Distribution Networks) were proposing to carry out New service connection on London Road, East Grinstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 8 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Energy Assets Networks (formerly Utility Distribution Networks) on 11 Dec 2024 at 10:48.

East Sussex County Council logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Priory Road

East Sussex County Council are proposing to carry out Highway repair and maintenance works on Priory Road, Forest Row.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by East Sussex County Council on 7 Feb 2025 at 09:44.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
London Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on London Road, Felbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Aug 2024 at 07:58.

Surrey County Council logo
LONG TERM
Between
1 Apr and 1 Oct 2025
Details
View Map
Share
Follow
Copthorne Road

Surrey County Council are proposing to carry out Highway repair and maintenance works on Copthorne Road, Felbridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 1 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Surrey County Council on 22 Aug 2024 at 08:06.

West Sussex County Council logo
LONG TERM
Between
7 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Church Lane

West Sussex County Council are proposing to carry out Highway improvement works on Church Lane, East Grinstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 13 Dec 2024 at 08:13.

West Sussex County Council logo
LONG TERM
Between
7 Apr and 13 Jun 2025
Details
View Map
Share
Follow
De La Warr Road

West Sussex County Council are proposing to carry out Highway improvement works on De La Warr Road, East Grinstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 13 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 13 Dec 2024 at 08:14.

Southern Gas Networks logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
King Street

Southern Gas Networks are proposing to carry out New service connection on King Street, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 14:54.

UK Power Networks South Eastern logo
Between
8 and 29 Apr 2025
Details
View Map
Share
Hazelwick Avenue Northbound

UK Power Networks South Eastern were proposing to carry out New service connection on Hazelwick Avenue Northbound, Three Bridges, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 16:06.

UK Power Networks South Eastern logo
Between
8 and 29 Apr 2025
Details
View Map
Share
North Road

UK Power Networks South Eastern were proposing to carry out New service connection on North Road, Three Bridges, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by UK Power Networks South Eastern on 15 Jan 2025 at 16:05.

West Sussex County Council logo
Between
9 and 15 Apr 2025
Details
View Map
Share
Follow
Imberhorne Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Imberhorne Lane, East Grinstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 15:00.

West Sussex County Council logo
Between
10 and 12 Apr 2025
Details
View Map
Share
Follow
Paddockhurst Road

West Sussex County Council are proposing to carry out Highway improvement works on Paddockhurst Road, Turners Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Jan 2025 at 09:45.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Apr and 23 May 2025
Details
View Map
Share
Follow
Withypitts

UK Power Networks South Eastern are proposing to carry out New service connection on Withypitts, Turners Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Feb 2025 at 14:26.

UK Power Networks South Eastern logo
LONG TERM
Between
14 Apr and 23 May 2025
Details
View Map
Share
Follow
Selsfield Road

UK Power Networks South Eastern are proposing to carry out New service connection on Selsfield Road, Turners Hill.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by UK Power Networks South Eastern on 12 Feb 2025 at 14:21.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 7 Jan 2025 at 11:52.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 20 Jan 2025 at 16:24.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road Northbound

West Sussex County Council are proposing to carry out Highway improvement works on London Road Northbound, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 22 Jan 2025 at 13:25.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:02.

West Sussex County Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
London Road

West Sussex County Council are proposing to carry out Highway improvement works on London Road, Langley Green, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:33.

West Sussex County Council logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway improvement works on Balcombe Road, Tinsley Green, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Jan 2025 at 09:45.

Southern Gas Networks logo
LONG TERM
Between
21 Apr and 30 Jun 2025
Details
View Map
Share
The Ridings

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on The Ridings, Pound Hill, Crawley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 30 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 15:35.

Southern Gas Networks logo
LONG TERM
Between
21 Apr and 30 May 2025
Details
View Map
Share
Follow
Radford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Radford Road, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 08:47.

Southern Gas Networks logo
LONG TERM
Between
21 Apr and 30 May 2025
Details
View Map
Share
Follow
Balcombe Road

Southern Gas Networks are proposing to carry out roadworks on Balcombe Road, Pound Hill, Crawley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 13:00.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Brickhouse Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Brickhouse Lane, Newchapel, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the verge only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 30 Jan 2025 at 10:22.

Ses Water (formerly Sutton & East Surrey Water Company) logo
Between
22 and 24 Apr 2025
Details
View Map
Share
Follow
Brickhouse Lane

Ses Water (formerly Sutton & East Surrey Water Company) are proposing to carry out Utility repair and maintenance works on Brickhouse Lane, Newchapel, Lingfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 24 April 2025. The works will impact the verge only.

This roadwork event was last updated by Ses Water (formerly Sutton & East Surrey Water Company) on 31 Jan 2025 at 09:55.

West Sussex County Council logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:04.

West Sussex County Council logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Northgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:26.

West Sussex County Council logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Three Bridges, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:12.

West Sussex County Council logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Three Bridges, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:26.

West Sussex County Council logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Crawley Avenue Access Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue Access Westbound, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Jan 2025 at 12:46.

West Sussex County Council logo
Between
6 and 9 May 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Three Bridges, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Jan 2025 at 12:44.

West Sussex County Council logo
Between
8 and 11 May 2025
Details
View Map
Share
Follow
Balcombe Road

West Sussex County Council are proposing to carry out Highway improvement works on Balcombe Road, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 27 Jan 2025 at 14:58.

West Sussex County Council logo
Between
8 and 11 May 2025
Details
View Map
Share
Follow
Worth Park Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Worth Park Avenue, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 27 Jan 2025 at 14:59.

West Sussex County Council logo
Between
8 and 11 May 2025
Details
View Map
Share
Follow
Copthorne Road

West Sussex County Council are proposing to carry out Highway improvement works on Copthorne Road, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 27 Jan 2025 at 15:01.

West Sussex County Council logo
Between
8 and 11 May 2025
Details
View Map
Share
Worth Park Avenue Roundabout

West Sussex County Council were proposing to carry out Highway improvement works on Worth Park Avenue Roundabout, Pound Hill, Crawley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 May 2025 and run through until 11 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:26.

West Sussex County Council logo
Between
8 and 11 May 2025
Details
View Map
Share
Follow
Worth Park Avenue Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Worth Park Avenue Roundabout, Pound Hill, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 May 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 27 Jan 2025 at 15:00.

West Sussex County Council logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Southgate Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Southgate Roundabout, Southgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:13.

West Sussex County Council logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Southgate Roundabout

West Sussex County Council are proposing to carry out Highway improvement works on Southgate Roundabout, Southgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the verge only.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:25.

West Sussex County Council logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Southgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway, verge and cycleway.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 09:25.

West Sussex County Council logo
Between
12 May and 6 Jun 2025
Details
View Map
Share
Follow
Crawley Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Crawley Avenue, Southgate, Crawley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 6 June 2025. The works will impact the footway, verge and cycleway.

This roadwork event was last updated by West Sussex County Council on 17 Jan 2025 at 10:26.

West Sussex County Council logo
Between
12 and 15 May 2025
Details
View Map
Share
Follow
Radford Road

West Sussex County Council are proposing to carry out Highway improvement works on Radford Road, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Jan 2025 at 12:00.

West Sussex County Council logo
Between
12 and 15 May 2025
Details
View Map
Share
Follow
Radford Road

West Sussex County Council are proposing to carry out Highway improvement works on Radford Road, Crawley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Feb 2025 at 12:52.


Roadworks Map near to Clockfield, CRAWLEY, RH10 4AR (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 13 Feb 2025 03:41
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Clockfield, CRAWLEY, RH10 4AR (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
West Sussex County Council logo
EMERGENCY
  
NORTH STREET 
(0.4 miles)
West Sussex County Council
Highway improvement works - Carriageway - Two-way signals
In Progress
Since: 6 Jan 2025 20:46
(Scheduled: 6 Jan 2025 - 14 Feb 2025)
0.4
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.