ROADWORKS SUMMARY
Kirk Mead, BRACKNELL, RG42 4GZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Kirk Mead, RG42 4GZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Kirk Mead, BRACKNELL, RG42 4GZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Kirk Mead are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
7 Oct 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Binfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Binfield Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 11:32.

Southern Gas Networks logo
LONG TERM
Between
7 Oct 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Keephatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Keephatch Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 12:33.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 28 Mar 2025
Details
View Map
Share
London Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 12:23.

Wokingham Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Easthampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Easthampstead Road, Wokingham Without, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wokingham Borough Council on 11 Nov 2024 at 08:36.

Cadent Gas logo
LONG TERM
Until
7 Apr 2025
Details
View Map
Share
Follow
Hatchet Lane

Cadent Gas are carrying out Utility asset works on Hatchet Lane, Winkfield, Windsor.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 12:29 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 12:44.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Hatchet Lane

Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 09:56.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Apr 2025
Details
View Map
Share
Follow
Hatchet Lane

Cadent Gas are proposing to carry out Utility asset works on Hatchet Lane, Winkfield, Windsor.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 11:18.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Warfield Street

Cadent Gas were proposing to carry out Utility asset works on Warfield Street, Warfield, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 09:50.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Brockenhurst Road

Cadent Gas are carrying out Utility asset works on Brockenhurst Road, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:22 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 08:10.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Brockenhurst Road

Cadent Gas are proposing to carry out Utility asset works on Brockenhurst Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.

Southern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Plough Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Plough Lane, Wokingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 09:10 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Jan 2025 at 09:16.

Cadent Gas logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Great Hollands Road

Cadent Gas are carrying out Utility repair and maintenance works on Great Hollands Road, Bracknell.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 January 2025 at 09:55 and could run through until 20 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 10 Jan 2025 at 12:42.

Cadent Gas logo
Between
13 and 28 Jan 2025
Details
View Map
Share
Follow
St Marys Hill

Cadent Gas are proposing to carry out Utility asset works on St Marys Hill, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Jan 2025 at 15:56.

Cadent Gas logo
Until
28 Jan 2025
Details
View Map
Share
Follow
St Marys Hill

Cadent Gas are carrying out Utility asset works on St Marys Hill, Ascot.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 January 2025 at 11:51 and could run through until 28 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 12:01.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Road

Cadent Gas are proposing to carry out Utility asset works on Brockenhurst Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Jan 2025 at 15:31.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Road

Cadent Gas are proposing to carry out Utility asset works on Brockenhurst Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.

South East Water logo
Finishing
Friday
Details
View Map
Share
Follow
Butchers Lane

South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 18 Nov 2024 at 16:14.

Cadent Gas logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Brockenhurst Road

Cadent Gas are proposing to carry out Utility asset works on Brockenhurst Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Jan 2025 at 12:50.

Wokingham Borough Council logo
Between
20 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Easthampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Easthampstead Road, Wokingham Without, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 1 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wokingham Borough Council on 17 Jan 2025 at 13:14.

South East Water logo
Finishing
Friday
Details
View Map
Share
Follow
Butchers Lane

South East Water are proposing to carry out Utility repair and maintenance works on Butchers Lane, White Waltham, Maidenhead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 17 Oct 2024 at 16:39.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Barkham Road

Network Rail are proposing to carry out Works for Rail Purposes on Barkham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Dec 2024 at 07:54.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Barkham Road

Network Rail are proposing to carry out Works for Rail Purposes on Barkham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Aug 2024 at 08:15.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Oldbury

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Oldbury, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 10 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Jan 2025 at 11:20.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Oldbury

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Oldbury, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Jan 2025 at 08:11.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Oldbury

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Oldbury, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Jan 2025 at 14:17.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 10 Feb 2025
Details
View Map
Share
Oldbury

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Oldbury, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 10 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 14:54.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 2 May 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Jan 2025 at 08:31.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 2 May 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 10:16.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Tilehurst Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Tilehurst Lane, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 10:00.

Thames Water logo
LONG TERM
Between
3 Feb and 22 May 2025
Details
View Map
Share
Follow
Goddard Way

Thames Water are proposing to carry out Utility asset works on Goddard Way, Warfield, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 22 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:36.

Thames Water logo
LONG TERM
Between
3 Feb and 22 May 2025
Details
View Map
Share
Follow
Harvest Ride

Thames Water are proposing to carry out Utility asset works on Harvest Ride, Warfield, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 22 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 15:35.

Scottish Hydro Electric Power Dis logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Willoughby Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Willoughby Road, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Jan 2025 at 08:11.

Scottish Hydro Electric Power Dis logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Willoughby Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Willoughby Road, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Jan 2025 at 14:11.

Scottish Hydro Electric Power Dis logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Willoughby Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Willoughby Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 17 February 2025. The works were due to impact the footway, carriageway and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 16:02.

Cornerstone Telecommunications Infrastructure logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Harmans Water Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 21 May 2024 at 08:15.

Cornerstone Telecommunications Infrastructure logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Harmans Water Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 17 Jan 2025 at 13:29.

T-Mobile (UK) logo
Between
10 and 15 Feb 2025
Details
View Map
Share
Follow
Opladen Way

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Opladen Way, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 15 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by T-Mobile (UK) on 2 Jan 2025 at 12:38.

Cadent Gas logo
LONG TERM
Between
12 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Footpath 54 Liscombe To Ringmead

Cadent Gas are proposing to carry out Utility asset works on Footpath 54 Liscombe To Ringmead, Bracknell.

These works are categorised as Major.

The works will start on or after 12 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:41.

Cadent Gas logo
LONG TERM
Between
12 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Footpath 54 Liscombe To Ringmead

Cadent Gas are proposing to carry out Utility asset works on Footpath 54 Liscombe To Ringmead, Bracknell.

These works are categorised as Major.

The works will start on or after 12 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Jan 2025 at 09:03.

Wokingham Borough Council logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Milton Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Milton Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wokingham Borough Council on 16 Jan 2025 at 04:20.

Thames Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bagshot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bagshot Road, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:25.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Brockenhurst Road

Cadent Gas are proposing to carry out Utility asset works on Brockenhurst Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.

Cornerstone Telecommunications Infrastructure logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Harmans Water Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 21 May 2024 at 08:15.

Bracknell Forest Council logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Birch Hill Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Birch Hill Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 19 Dec 2024 at 10:42.

Bracknell Forest Council logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Birch Hill Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Birch Hill Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 30 Dec 2024 at 15:00.

National Highways logo
Between
21 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Bracknell Road

National Highways are proposing to carry out Highway repair and maintenance works on Bracknell Road, Bagshot.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 3 Jan 2025 at 09:18.

Bracknell Forest Council logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 10 Jan 2025 at 09:52.

Affinity Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Buckhurst Road

Affinity Water are proposing to carry out Utility repair and maintenance works on Buckhurst Road, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Affinity Water on 12 Nov 2024 at 16:34.

Bracknell Forest Council logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 12 Dec 2024 at 15:32.

Bracknell Forest Council logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 11:03.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Church Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Church Hill, Hurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 10:55.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Church Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Church Hill, Hurst.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 09:41.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Church Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Church Hill, Hurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:08.

BT logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Old Wokingham Road

BT are proposing to carry out Utility asset works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Dec 2024 at 12:39.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Mar and 26 Apr 2025
Details
View Map
Share
Ringmead

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ringmead, Hanworth, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 26 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2024 at 10:21.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Mar and 26 Apr 2025
Details
View Map
Share
Ringmead

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ringmead, Hanworth, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 26 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 12:26.

Virgin Media logo
Between
3 and 5 Mar 2025
Details
View Map
Share
The Terrace

Virgin Media were proposing to carry out Utility asset works on The Terrace, Wokingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 Dec 2024 at 10:34.

Bracknell Forest Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Station Roundabout

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Roundabout, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 17 Jan 2025 at 14:28.

Bracknell Forest Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Market Street

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Market Street, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 17 Jan 2025 at 14:34.

Bracknell Forest Council logo
LONG TERM
Between
10 Mar and 16 May 2025
Details
View Map
Share
Follow
Malt Hill

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Malt Hill, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 20 Sep 2024 at 09:11.

Bracknell Forest Council logo
LONG TERM
Between
10 Mar and 16 May 2025
Details
View Map
Share
Follow
Malt Hill

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Malt Hill, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 12 Sep 2024 at 09:14.

Bracknell Forest Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 12 Dec 2024 at 15:33.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Mar and 30 Apr 2025
Details
View Map
Share
Follow
Old Bracknell Lane West

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jan 2025 at 12:36.

Cadent Gas logo
LONG TERM
Between
17 Mar and 9 May 2025
Details
View Map
Share
Follow
Station Hill

Cadent Gas are proposing to carry out Utility asset works on Station Hill, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Mar and 30 Apr 2025
Details
View Map
Share
Follow
Old Bracknell Lane West

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Dec 2024 at 16:05.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Mar and 30 Apr 2025
Details
View Map
Share
Old Bracknell Lane West

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 14:51.

South East Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Barkham Road

South East Water are proposing to carry out Remedial works on Barkham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 11 Dec 2024 at 12:55.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Bagshot Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 8 Jan 2025 at 10:26.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Bagshot Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bagshot Road, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 09:51.

Scottish Hydro Electric Power Dis logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Honey Hill

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Honey Hill, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jan 2025 at 09:39.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
London Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on London Road, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 30 Dec 2024 at 15:01.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 09:53.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 15 Jan 2025 at 16:30.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Wildridings Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Wildridings Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 15 Jan 2025 at 16:30.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Wildridings Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Wildridings Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 09:51.

Cadent Gas logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Bay Drive

Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Oct 2024 at 16:56.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
London Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on London Road, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 19 Dec 2024 at 10:10.

Cadent Gas logo
Between
28 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Ringmead

Cadent Gas are proposing to carry out Utility asset works on Ringmead, Birch Hill, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 08:30.

Cadent Gas logo
Between
5 and 17 Apr 2025
Details
View Map
Share
Follow
Bagshot Road

Cadent Gas are proposing to carry out Utility asset works on Bagshot Road, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.

Nexfibre Networks Limited logo
Between
7 and 29 Apr 2025
Details
View Map
Share
Follow
Locks Ride

Nexfibre Networks Limited are proposing to carry out Utility asset works on Locks Ride, Ascot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 29 April 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 7 Jan 2025 at 09:49.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winkfield Row

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 17 Jan 2025 at 16:09.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winkfield Row

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 14 Jan 2025 at 08:09.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winkfield Row

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 19 Dec 2024 at 11:35.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winkfield Row

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 9 Dec 2024 at 15:32.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Winkfield Row

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 10 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 16 Dec 2024 at 11:12.

BT logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Old Wokingham Road

BT are proposing to carry out Utility asset works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 9 Jan 2025 at 09:10.

South East Water logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Newell Green

South East Water are proposing to carry out New service connection on Newell Green, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 13 Jan 2025 at 10:42.


Roadworks Map near to Kirk Mead, BRACKNELL, RG42 4GZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 19 Jan 2025 06:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Kirk Mead, BRACKNELL, RG42 4GZ (8 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
WARFIELD STREET, WARFIELD 
(0.3 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 6 Jan 2025 - 20 Jan 2025)
0.3
Details
Share
2
BT logo
ANNEFORDE PLACE 
(0.6 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Complete
16 Jan 2025 12:00 - 17 Jan 2025 08:00
0.6
Details
Share
3
BT logo
BENEDICT GREEN, WARFIELD 
(0.8 miles)
BT
Utility asset works - Footway, Verge - Some carriageway incursion
In Progress
Since: 17 Jan 2025 16:23
(Scheduled: 17 Jan 2025 - 21 Jan 2025)
0.8
Details
Share
Follow
4
Virgin Media logo
BARLEY MEAD, WARFIELD 
(0.9 miles)
Virgin Media
Utility asset works - Verge - Some carriageway incursion
Complete
17 Jan 2025 09:25 - 13:35
0.9
Details
Share
5
South East Water logo
URGENT
  
MATTHEWS CHASE, BINFIELD 
(0.9 miles)
South East Water
Utility repair and maintenance works - Verge - Some carriageway incursion
In Progress
Since: 16 Jan 2025 18:05
(Scheduled: 16 Jan 2025 - 21 Jan 2025)
0.9
Details
Share
Follow
6
Bracknell Forest Council logo
WOKINGHAM ROAD 
(0.9 miles)
Bracknell Forest Council
Highway repair and maintenance works - Carriageway - Lane closure
Planned
Scheduled: 16 Jan 2025 - 20 Jan 2025
0.9
Details
Share
Follow
7
Bracknell Forest Council logo
PRIESTWOOD COURT ROAD 
(0.9 miles)
Bracknell Forest Council
Highway repair and maintenance works - Carriageway - Some carriageway incursion
Planned
Scheduled: 20 Jan 2025 - 22 Jan 2025
0.9
Details
Share
Follow
8
Cityfibre Metro Networks logo
FOOTPATH 06 HIGH STREET TO BULL LANE 
(1.0 miles)
Cityfibre Metro Networks
Remedial works - Footway, Verge - No carriageway incursion
Cancelled
(Scheduled: 16 Jan 2025 - 20 Jan 2025)
1.0
Details
Share