ROADWORKS SUMMARY
Nevelle Close, BRACKNELL, RG42 4AZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Nevelle Close, RG42 4AZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Nevelle Close, BRACKNELL, RG42 4AZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Nevelle Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Western Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2024 at 09:33.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Western Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Aug 2024 at 22:07.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Western Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Aug 2024 at 00:24.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Cain Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Aug 2024 at 08:09.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Cain Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2024 at 09:53.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Western Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Western Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Aug 2024 at 08:09.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Cain Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2024 and run through until 9 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Aug 2024 at 21:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Cain Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cain Road, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2024 and could run through until 9 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Aug 2024 at 00:23.

Southern Gas Networks logo
LONG TERM
Between
16 Sep and 20 Dec 2024
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 14:00.

Southern Gas Networks logo
LONG TERM
Between
23 Sep and 20 Dec 2024
Details
View Map
Share
Follow
Easthampstead Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Easthampstead Road, Wokingham Without, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 14:06.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Robin Hood Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Robin Hood Way, Winnersh.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 11:15.

Southern Gas Networks logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Robin Hood Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Robin Hood Way, Winnersh.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 September 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Sep 2024 at 10:46.

Southern Gas Networks logo
LONG TERM
Between
7 Oct 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Keephatch Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Keephatch Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 12:33.

Southern Gas Networks logo
LONG TERM
Between
7 Oct 2024 and 21 Feb 2025
Details
View Map
Share
Follow
Binfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Binfield Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2024 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 11:32.

Southern Gas Networks logo
LONG TERM
Until
21 Feb 2025
Details
View Map
Share
Follow
Keephatch Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Keephatch Road, Wokingham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 October 2024 at 08:00 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 08:35.

Cadent Gas logo
LONG TERM
Until
18 Dec 2024
Details
View Map
Share
Follow
Warfield Road

Cadent Gas are carrying out Utility asset works on Warfield Road, Bracknell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 October 2024 at 17:30 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Oct 2024 at 10:38.

Southern Gas Networks logo
LONG TERM
Between
25 Oct 2024 and 13 Jan 2025
Details
View Map
Share
Ravenswood Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ravenswood Avenue, Crowthorne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 October 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 12:13.

Bracknell Forest Council logo
LONG TERM
Between
4 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Nine Mile Ride

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Nine Mile Ride, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 17 Oct 2024 at 09:54.

Wokingham Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Nine Mile Ride

Wokingham Borough Council are proposing to carry out Highway improvement works on Nine Mile Ride, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wokingham Borough Council on 2 Jul 2024 at 07:44.

Southern Gas Networks logo
LONG TERM
Until
19 Dec 2024
Details
View Map
Share
Follow
Ravenswood Avenue

Southern Gas Networks are carrying out Utility repair and maintenance works on Ravenswood Avenue, Crowthorne.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 09:15 and could run through until 19 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 14 Nov 2024 at 10:03.

Bracknell Forest Council logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Nine Mile Ride

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Nine Mile Ride, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 31 Oct 2024 at 10:04.

Bracknell Forest Council logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Nine Mile Ride

Bracknell Forest Council are proposing to carry out Highway improvement works on Nine Mile Ride, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 5 Nov 2024 at 14:04.

Bracknell Forest Council logo
Between
25 Nov and 16 Dec 2024
Details
View Map
Share
Nine Mile Ride

Bracknell Forest Council were proposing to carry out Highway improvement works on Nine Mile Ride, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 16 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 4 Nov 2024 at 14:16.

Bracknell Forest Council logo
Between
25 Nov and 13 Dec 2024
Details
View Map
Share
Nine Mile Ride

Bracknell Forest Council were proposing to carry out Highway improvement works on Nine Mile Ride, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 6 Nov 2024 at 12:17.

Cadent Gas logo
Between
28 Nov and 12 Dec 2024
Details
View Map
Share
Follow
Ringmead

Cadent Gas are proposing to carry out Utility asset works on Ringmead, Hanworth, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 November 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 11:30.

Cadent Gas logo
Until
12 Dec 2024
Details
View Map
Share
Follow
Ringmead

Cadent Gas are carrying out Utility asset works on Ringmead, Hanworth, Bracknell.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 November 2024 at 10:06 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Nov 2024 at 10:19.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Prince Albert Drive

Cadent Gas are carrying out Utility repair and maintenance works on Prince Albert Drive, Ascot.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 November 2024 at 17:02 and could run through until 9 December 2024. The works will impact the footway only.

This roadwork event was last updated by Cadent Gas on 4 Dec 2024 at 16:26.

Bracknell Forest Council logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Maxine Close

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Maxine Close, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 21 Nov 2024 at 11:09.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Bay Drive

Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 9 Sep 2024 at 15:56.

Cadent Gas logo
Between
2 and 13 Dec 2024
Details
View Map
Share
Follow
Bay Drive

Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 13 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Oct 2024 at 16:08.

Southern Gas Networks logo
LONG TERM
Between
2 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Ravenswood Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ravenswood Avenue, Crowthorne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 16 Sep 2024 at 11:31.

Bracknell Forest Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Maxine Close

Bracknell Forest Council are carrying out Highway repair and maintenance works on Maxine Close, Sandhurst.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 2 Dec 2024 at 12:11.

Bracknell Forest Council logo
Until
20 Dec 2024
Details
View Map
Share
Follow
Long Mickle

Bracknell Forest Council are carrying out Highway repair and maintenance works on Long Mickle, Sandhurst.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 00:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 2 Dec 2024 at 12:11.

Bracknell Forest Council logo
Between
5 and 13 Dec 2024
Details
View Map
Share
Follow
Nine Mile Ride

Bracknell Forest Council are proposing to carry out Highway improvement works on Nine Mile Ride, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 21 Nov 2024 at 10:56.

Bracknell Forest Council logo
Between
5 and 13 Dec 2024
Details
View Map
Share
Follow
Nine Mile Ride

Bracknell Forest Council are proposing to carry out Highway improvement works on Nine Mile Ride, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 14 Nov 2024 at 10:00.

Wokingham Borough Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Rectory Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Rectory Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 11 Oct 2024 at 09:28.

T-Mobile (UK) logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Opladen Way

T-Mobile (UK) are proposing to carry out Utility repair and maintenance works on Opladen Way, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 14 Oct 2024 at 14:22.

Wokingham Borough Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Rectory Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Rectory Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 22 Oct 2024 at 14:20.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 28 Mar 2025
Details
View Map
Share
London Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 12:23.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Dukes Ride

BT are proposing to carry out Utility asset works on Dukes Ride, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by BT on 20 Aug 2024 at 12:43.

Wokingham Borough Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Wiltshire Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wiltshire Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 11 Oct 2024 at 09:29.

Wokingham Borough Council logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Follow
Wiltshire Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wiltshire Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 14 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 22 Oct 2024 at 14:21.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Follow
Ravenswood Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Ravenswood Avenue, Crowthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Sep 2024 at 09:35.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 13 Jan 2025
Details
View Map
Share
Ravenswood Avenue

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Ravenswood Avenue, Crowthorne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 13:05.

T-Mobile (UK) logo
Between
9 and 14 Dec 2024
Details
View Map
Share
Opladen Way

T-Mobile (UK) were proposing to carry out Utility repair and maintenance works on Opladen Way, Bracknell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 14 December 2024. The works were due to impact the verge only.

This roadwork event was last updated by T-Mobile (UK) on 25 Nov 2024 at 14:28.

BT logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Tilehurst Lane

BT are proposing to carry out Utility asset works on Tilehurst Lane, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 27 Sep 2024 at 16:27.

Cityfibre Metro Networks logo
Between
19 and 24 Dec 2024
Details
View Map
Share
Follow
Sawpit Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Sawpit Lane, Hurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 24 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 30 Sep 2024 at 09:38.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 21 Feb 2025
Details
View Map
Share
Follow
Plough Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Plough Lane, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 12:58.

Affinity Water logo
Between
6 and 17 Jan 2025
Details
View Map
Share
Follow
Swinley Road

Affinity Water are proposing to carry out Utility asset works on Swinley Road, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Affinity Water on 21 Oct 2024 at 16:06.

Southern Gas Networks logo
Between
6 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Lower Wokingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 08:16.

Wokingham Borough Council logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Easthampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Easthampstead Road, Wokingham Without, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wokingham Borough Council on 11 Nov 2024 at 08:36.

Wokingham Borough Council logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Finchampstead.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wokingham Borough Council on 14 Nov 2024 at 12:32.

Cadent Gas logo
Between
6 and 20 Jan 2025
Details
View Map
Share
Follow
Warfield Street

Cadent Gas are proposing to carry out Utility asset works on Warfield Street, Warfield, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 11:30.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Burleigh Road

BT are proposing to carry out Utility repair and maintenance works on Burleigh Road, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Sep 2024 at 16:28.

BT logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Burleigh Road

BT are proposing to carry out Utility repair and maintenance works on Burleigh Road, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 30 Sep 2024 at 14:44.

BT logo
Between
8 and 10 Jan 2025
Details
View Map
Share
Follow
Burleigh Road

BT are proposing to carry out Utility repair and maintenance works on Burleigh Road, Ascot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Oct 2024 at 09:38.

Bracknell Forest Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Bracknell Road

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Bracknell Road, Warfield, Bracknell.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 4 Nov 2024 at 10:58.

South East Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Dukes Ride

South East Water are proposing to carry out Utility repair and maintenance works on Dukes Ride, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 17 Oct 2024 at 11:59.

South East Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Dukes Ride

South East Water are proposing to carry out Utility repair and maintenance works on Dukes Ride, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 18 Nov 2024 at 13:44.

Network Rail logo
Between
25 and 27 Jan 2025
Details
View Map
Share
Follow
Barkham Road

Network Rail are proposing to carry out Works for Rail Purposes on Barkham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 30 Aug 2024 at 08:15.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Tilehurst Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Tilehurst Lane, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Nov 2024 at 10:00.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 2 May 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 10:16.

South East Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Summit Close

South East Water are proposing to carry out Utility repair and maintenance works on Summit Close, Finchampstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 29 Nov 2024 at 15:28.

South East Water logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Summit Close

South East Water are proposing to carry out Utility repair and maintenance works on Summit Close, Finchampstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 29 Oct 2024 at 15:37.

Cornerstone Telecommunications Infrastructure logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Harmans Water Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 21 May 2024 at 08:15.

Cadent Gas logo
LONG TERM
Between
12 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Footpath 54 Liscombe To Ringmead

Cadent Gas are proposing to carry out Utility asset works on Footpath 54 Liscombe To Ringmead, Bracknell.

These works are categorised as Major.

The works will start on or after 12 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Nov 2024 at 12:00.

Thames Water logo
Between
17 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Bagshot Road

Thames Water are proposing to carry out Utility repair and maintenance works on Bagshot Road, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 09:25.

Cornerstone Telecommunications Infrastructure logo
Between
17 and 20 Feb 2025
Details
View Map
Share
Follow
Harmans Water Road

Cornerstone Telecommunications Infrastructure are proposing to carry out Utility asset works on Harmans Water Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the verge only.

This roadwork event was last updated by Cornerstone Telecommunications Infrastructure on 21 May 2024 at 08:15.

Cadent Gas logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Brockenhurst Road

Cadent Gas are proposing to carry out Utility asset works on Brockenhurst Road, Ascot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Sep 2024 at 14:40.

South East Water logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Follow
Finchampstead Road

South East Water are proposing to carry out Utility repair and maintenance works on Finchampstead Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 26 Nov 2024 at 08:02.

BT logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Old Wokingham Road

BT are proposing to carry out Utility asset works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 21 Nov 2024 at 16:28.

Thames Water logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
Church Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Church Hill, Hurst.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:08.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Mar and 26 Apr 2025
Details
View Map
Share
Ringmead

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ringmead, Hanworth, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 26 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2024 at 10:21.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Mar and 3 May 2025
Details
View Map
Share
Follow
Jameston

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Jameston, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 3 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Nov 2024 at 11:49.

Virgin Media logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
The Terrace

Virgin Media are proposing to carry out Utility asset works on The Terrace, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Virgin Media on 3 Dec 2024 at 12:56.


Roadworks Map near to Nevelle Close, BRACKNELL, RG42 4AZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Dec 2024 01:36
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Nevelle Close, BRACKNELL, RG42 4AZ (19 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Bracknell Forest Council logo
ST MARKS ROAD, BINFIELD 
(0.2 miles)
Bracknell Forest Council
Highway repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 5 Dec 2024 - 9 Dec 2024
0.2
Details
Share
Follow
2
Bracknell Forest Council logo
POPESWOOD ROAD, BINFIELD 
(0.2 miles)
Bracknell Forest Council
Highway repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 6 Dec 2024 - 10 Dec 2024
0.2
Details
Share
Follow
3
Scottish Hydro Electric Power Dis logo
MAJOR
  
CAIN ROAD 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 2 Sep 2024 - 9 Dec 2024)
0.4
Details
Share
4
Scottish Hydro Electric Power Dis logo
MAJOR
  
CAIN ROAD 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 2 Sep 2024 - 9 Dec 2024)
0.4
Details
Share
5
Scottish Hydro Electric Power Dis logo
MAJOR
  
CAIN ROAD 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 2 Sep 2024 - 9 Dec 2024
0.4
Details
Share
Follow
6
Scottish Hydro Electric Power Dis logo
MAJOR
  
CAIN ROAD 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 2 Sep 2024 - 9 Dec 2024)
0.4
Details
Share
7
Scottish Hydro Electric Power Dis logo
MAJOR
  
WESTERN ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 2 Sep 2024 - 9 Dec 2024)
0.5
Details
Share
8
Scottish Hydro Electric Power Dis logo
MAJOR
  
WESTERN ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 2 Sep 2024 - 9 Dec 2024)
0.5
Details
Share
9
Scottish Hydro Electric Power Dis logo
MAJOR
  
WESTERN ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 2 Sep 2024 - 9 Dec 2024
0.5
Details
Share
Follow
10
Scottish Hydro Electric Power Dis logo
MAJOR
  
WESTERN ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 2 Sep 2024 - 9 Dec 2024)
0.5
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.