ROADWORKS SUMMARY
Wood Lane, WOKINGHAM, RG41 4TS

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wood Lane, RG41 4TS and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Wood Lane, WOKINGHAM, RG41 4TS

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wood Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

National Highways logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Rose Kiln Lane

National Highways are carrying out Highway improvement works on Rose Kiln Lane, Reading.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 April 2024 at 09:30 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by National Highways on 23 Oct 2024 at 14:03.

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
London Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 12:23.

Wokingham Borough Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
A3290 Bravo

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A3290 Bravo, Earley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wokingham Borough Council on 11 Sep 2024 at 13:54.

Wokingham Borough Council logo
LONG TERM
Finishing
Thursday
Details
View Map
Share
Follow
A3290 Alpha

Wokingham Borough Council are proposing to carry out Highway improvement works on A3290 Alpha, Earley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wokingham Borough Council on 11 Sep 2024 at 13:51.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 2 May 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 10:16.

Wokingham Borough Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
The Devils Highway

Wokingham Borough Council are carrying out Highway repair and maintenance works on The Devils Highway, Riseley.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 February 2025 at 16:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 25 Feb 2025 at 09:52.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 19 May 2025
Details
View Map
Share
London Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 19 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 14:25.

Southern Gas Networks logo
LONG TERM
Between
17 Feb and 7 May 2025
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Earley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 15:24.

Southern Gas Networks logo
LONG TERM
Until
7 May 2025
Details
View Map
Share
Follow
Church Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Church Road, Earley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 08:40 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 08:43.

Southern Gas Networks logo
LONG TERM
Until
3 Jun 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are carrying out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 10:40 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Feb 2025 at 10:58.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Lower Wokingham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 10:49.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Lower Wokingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 12:39.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Lower Wokingham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2025 at 08:37.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Lower Wokingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2025 at 13:05.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
3 Mar and 16 May 2025
Details
View Map
Share
Follow
Cannock Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cannock Way, Earley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 12:10.

Wokingham Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Headley Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wokingham Borough Council on 19 Nov 2024 at 10:13.

Wokingham Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
Barkham Ride

Wokingham Borough Council are carrying out Highway improvement works on Barkham Ride, Finchampstead.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 09:30 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 18 Mar 2025 at 12:56.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Follow
Lower Wokingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 11:51.

Southern Gas Networks logo
Finishing
Thursday
Details
View Map
Share
Lower Wokingham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 March 2025 and run through until 27 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Mar 2025 at 10:21.

Southern Gas Networks logo
LONG TERM
Until
21 Apr 2025
Details
View Map
Share
Follow
Lower Wokingham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 March 2025 at 09:00 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Mar 2025 at 07:50.

Wokingham Borough Council logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Wychwood Crescent

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wychwood Crescent, Earley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 27 Feb 2025 at 10:10.

Wokingham Borough Council logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Wychwood Crescent

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Wychwood Crescent, Earley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 27 Feb 2025 at 16:24.

Southern Gas Networks logo
Between
17 Mar and 11 Apr 2025
Details
View Map
Share
Whiteknights Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Whiteknights Road, Reading.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 11 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 13 Mar 2025 at 13:48.

Cityfibre Metro Networks logo
Until
31 Mar 2025
Details
View Map
Share
Follow
Trowes Lane

Cityfibre Metro Networks are carrying out Statutory Infrastructure Works on Trowes Lane, Swallowfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 March 2025 at 09:43 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 20 Mar 2025 at 09:44.

Wokingham Borough Council logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Finchampstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 10 Feb 2025 at 08:14.

Wokingham Borough Council logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Finchampstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 25 Feb 2025 at 09:51.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Honey Hill

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Honey Hill, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jan 2025 at 09:39.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Honey Hill

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Honey Hill, Crowthorne.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Mar 2025 at 14:28.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Honey Hill

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Honey Hill, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Mar 2025 at 10:34.

Wokingham Borough Council logo
LONG TERM
Between
24 Mar and 16 Jun 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wokingham Borough Council on 5 Mar 2025 at 11:14.

Wokingham Borough Council logo
LONG TERM
Between
24 Mar and 16 Jul 2025
Details
View Map
Share
Follow
Molly Millars Lane

Wokingham Borough Council are proposing to carry out Highway improvement works on Molly Millars Lane, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 16 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wokingham Borough Council on 5 Mar 2025 at 11:13.

Reading Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Whitley Wood Lane

Reading Borough Council are proposing to carry out Highway repair and maintenance works on Whitley Wood Lane, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Reading Borough Council on 29 Jan 2025 at 12:53.

Reading Borough Council logo
Finishing
Thursday
Details
View Map
Share
Follow
Whitley Wood Lane

Reading Borough Council are proposing to carry out Highway repair and maintenance works on Whitley Wood Lane, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 27 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Reading Borough Council on 11 Feb 2025 at 12:09.

Bracknell Forest Council logo
Finishing
Friday
Details
View Map
Share
Follow
London Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on London Road, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 19 Dec 2024 at 10:10.

Bracknell Forest Council logo
Finishing
Friday
Details
View Map
Share
Follow
London Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on London Road, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 30 Dec 2024 at 15:01.

Thames Water logo
Finishing
Thursday
Details
View Map
Share
Elm Road

Thames Water were proposing to carry out Utility repair and maintenance works on Elm Road, Earley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 March 2025 and run through until 27 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jan 2025 at 13:36.

Reading Borough Council logo
Between
27 and 29 Mar 2025
Details
View Map
Share
Follow
B3270 Between A33 And A327

Reading Borough Council are proposing to carry out Highway repair and maintenance works on B3270 Between A33 And A327, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Reading Borough Council on 28 Jan 2025 at 16:05.

Reading Borough Council logo
Between
27 and 29 Mar 2025
Details
View Map
Share
Follow
B3270 Between A33 And A327

Reading Borough Council are proposing to carry out Highway repair and maintenance works on B3270 Between A33 And A327, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Reading Borough Council on 11 Feb 2025 at 10:30.

Cityfibre Metro Networks logo
Between
31 Mar and 8 Apr 2025
Details
View Map
Share
The Devils Highway

Cityfibre Metro Networks were proposing to carry out Statutory Infrastructure Works on The Devils Highway, Riseley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 8 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Jan 2025 at 11:54.

Cityfibre Metro Networks logo
Between
31 Mar and 10 Apr 2025
Details
View Map
Share
Follow
The Devils Highway

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on The Devils Highway, Riseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 10 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Jan 2025 at 12:34.

Wokingham Borough Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Langborough Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Langborough Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 10 Mar 2025 at 07:11.

Wokingham Borough Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Langborough Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Langborough Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 19 Mar 2025 at 11:25.

Reading Borough Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Whitley Wood Road

Reading Borough Council are proposing to carry out Highway repair and maintenance works on Whitley Wood Road, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Reading Borough Council on 28 Jan 2025 at 09:43.

Reading Borough Council logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
Follow
Whitley Wood Road

Reading Borough Council are proposing to carry out Highway repair and maintenance works on Whitley Wood Road, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 2 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Reading Borough Council on 10 Feb 2025 at 16:59.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 23 Jun 2025
Details
View Map
Share
Follow
Colemans Moor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colemans Moor Road, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 14:12.

Thames Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Edneys Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Edneys Hill, Barkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 11:49.

Thames Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Edneys Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Edneys Hill, Barkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 08:51.

Southern Gas Networks logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Crescent Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Feb 2025 at 10:00.

Southern Gas Networks logo
Between
7 Apr and 2 May 2025
Details
View Map
Share
Follow
Bulmershe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bulmershe Road, Reading.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Feb 2025 at 12:10.

Southern Gas Networks logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Culver Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culver Lane, Earley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2025 at 09:23.

Southern Gas Networks logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Culver Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culver Lane, Earley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 11:47.

Thames Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Swallowfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Swallowfield Road, Arborfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 09:41.

Thames Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Swallowfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Swallowfield Road, Arborfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 13:08.

Thames Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Whiteknights Road

Thames Water are proposing to carry out Utility repair and maintenance works on Whiteknights Road, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Feb 2025 at 18:06.

Thames Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Whiteknights Road

Thames Water are proposing to carry out Utility repair and maintenance works on Whiteknights Road, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 16:30.

Cityfibre Metro Networks logo
Between
9 and 23 Apr 2025
Details
View Map
Share
Follow
School Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on School Road, Riseley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 April 2025 and could run through until 23 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Jan 2025 at 11:11.

BT logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Old Wokingham Road

BT are proposing to carry out Utility asset works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Feb 2025 at 09:16.

BT logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Old Wokingham Road

BT are proposing to carry out Utility asset works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Mar 2025 at 09:15.

Electricity Network Company logo
Between
13 Apr and 7 May 2025
Details
View Map
Share
Follow
Hexham Road

Electricity Network Company are proposing to carry out Utility asset works on Hexham Road, Reading.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 16 Jan 2025 at 17:34.

Electricity Network Company logo
Between
13 Apr and 7 May 2025
Details
View Map
Share
Follow
Hexham Road

Electricity Network Company are proposing to carry out Utility asset works on Hexham Road, Reading.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 April 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Electricity Network Company on 13 Feb 2025 at 13:21.

Thames Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Trowes Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Trowes Lane, Swallowfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 09:40.

Thames Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Trowes Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Trowes Lane, Swallowfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 16 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 09:51.

Thames Water logo
Between
14 and 16 Apr 2025
Details
View Map
Share
Follow
Trowes Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Trowes Lane, Swallowfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 16 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Mar 2025 at 11:54.

Wokingham Borough Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 10 Feb 2025 at 08:18.

Wokingham Borough Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Sindlesham Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Sindlesham Road, Arborfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 16 Jan 2025 at 11:02.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 7 Jul 2025
Details
View Map
Share
Follow
Colemans Moor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colemans Moor Road, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 10:56.

Southern Gas Networks logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Culver Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culver Lane, Earley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Mar 2025 at 09:23.

Southern Gas Networks logo
Between
14 and 25 Apr 2025
Details
View Map
Share
Follow
Culver Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Culver Lane, Earley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Mar 2025 at 11:48.

Network Rail logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Western Avenue

Network Rail were proposing to carry out Works for Rail Purposes on Western Avenue, Woodley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Feb 2025 at 14:14.

Network Rail logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Western Avenue

Network Rail were proposing to carry out Works for Rail Purposes on Western Avenue, Woodley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 2 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 13:33.

Wokingham Borough Council logo
Between
18 and 22 Apr 2025
Details
View Map
Share
Follow
Bath Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Bath Road, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 22 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 16 Jan 2025 at 08:40.

Cityfibre Metro Networks logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Trowes Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Trowes Lane, Swallowfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cityfibre Metro Networks on 7 Jan 2025 at 11:12.

West Berkshire Council logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Trowes Lane

West Berkshire Council are proposing to carry out Highway improvement works on Trowes Lane, Beech Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Berkshire Council on 24 Feb 2025 at 14:30.

West Berkshire Council logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Trowes Lane

West Berkshire Council are proposing to carry out Highway improvement works on Trowes Lane, Beech Hill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Berkshire Council on 24 Feb 2025 at 15:53.

Hampshire County Council logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Ives Close

Hampshire County Council are proposing to carry out Highway improvement works on Ives Close, Yateley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Jan 2025 at 15:01.

South East Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Waterloo Road

South East Water are proposing to carry out Utility repair and maintenance works on Waterloo Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 6 Feb 2025 at 10:22.

BT logo
Between
5 and 7 May 2025
Details
View Map
Share
Old Wokingham Road

BT were proposing to carry out Utility asset works on Old Wokingham Road, Wokingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 7 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 21 Jan 2025 at 16:39.

Bracknell Forest Council logo
Between
6 and 14 May 2025
Details
View Map
Share
Follow
Old Wokingham Road

Bracknell Forest Council are proposing to carry out Highway improvement works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 13 Mar 2025 at 10:03.

Bracknell Forest Council logo
Between
7 and 16 May 2025
Details
View Map
Share
Follow
Old Wokingham Road

Bracknell Forest Council are proposing to carry out Highway improvement works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Feb 2025 at 12:33.

Wokingham Borough Council logo
Between
12 and 15 May 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 10 Feb 2025 at 15:01.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Bravo

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Bravo, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 08:22.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Bravo

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Bravo, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:51.

South East Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Stanley Road

South East Water are proposing to carry out Utility repair and maintenance works on Stanley Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by South East Water on 11 Mar 2025 at 15:08.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Bravo On From Coppid Beech

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Bravo On From Coppid Beech, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 08:22.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Bravo On From Coppid Beech

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Bravo On From Coppid Beech, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:51.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
M4 J10 Leave E

Wokingham Borough Council are proposing to carry out roadworks on M4 J10 Leave E, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 3 Mar 2025 at 16:31.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
M4 J10 Leave W

Wokingham Borough Council are proposing to carry out roadworks on M4 J10 Leave W, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 3 Mar 2025 at 16:31.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Alpha

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Alpha, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:48.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
A329(M) Alpha

Wokingham Borough Council were proposing to carry out Highway repair and maintenance works on A329(M) Alpha, Wokingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 11:03.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Alpha On From Bader Way

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Alpha On From Bader Way, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 08:23.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Alpha On From Bader Way

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Alpha On From Bader Way, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:51.

Wokingham Borough Council logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Headley Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wokingham Borough Council on 10 Jan 2025 at 12:08.

Wokingham Borough Council logo
Between
12 and 29 May 2025
Details
View Map
Share
Follow
Headley Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 29 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wokingham Borough Council on 21 Mar 2025 at 12:15.

Bracknell Forest Council logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
New Wokingham Road

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on New Wokingham Road, Crowthorne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 11 Mar 2025 at 15:42.

Bracknell Forest Council logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
New Wokingham Road

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on New Wokingham Road, Crowthorne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 18 Mar 2025 at 13:46.

Bracknell Forest Council logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Dukes Ride

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Dukes Ride, Crowthorne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 11 Mar 2025 at 15:42.

Bracknell Forest Council logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Dukes Ride

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Dukes Ride, Crowthorne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 9 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 18 Mar 2025 at 13:45.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
19 May and 27 Jun 2025
Details
View Map
Share
Follow
Shackleton Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Shackleton Way, Woodley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Feb 2025 at 11:36.

Wokingham Borough Council logo
Between
19 and 22 May 2025
Details
View Map
Share
Follow
London Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on London Road, Earley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 22 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 21 Mar 2025 at 13:16.

Bracknell Forest Council logo
Between
21 and 28 May 2025
Details
View Map
Share
Follow
Bracknell Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bracknell Road, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 20 Mar 2025 at 16:07.

Network Rail logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
Western Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Western Avenue, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 6 Mar 2025 at 12:58.

Network Rail logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
Western Avenue

Network Rail are proposing to carry out Works for Rail Purposes on Western Avenue, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 13 Mar 2025 at 08:30.

BT logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility asset works on Park Lane, Finchampstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Feb 2025 at 14:41.

Bracknell Forest Council logo
Between
27 and 31 May 2025
Details
View Map
Share
Follow
Bracknell Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bracknell Road, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 20 Mar 2025 at 15:34.

Thames Water logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Liverpool Road

Thames Water are proposing to carry out Utility repair and maintenance works on Liverpool Road, Reading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2025 at 11:58.

Network Rail logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Follow
Barkham Road

Network Rail are proposing to carry out Works for Rail Purposes on Barkham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Mar 2025 at 09:04.

Wokingham Borough Council logo
Between
30 May and 3 Jun 2025
Details
View Map
Share
Follow
Headley Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wokingham Borough Council on 21 Mar 2025 at 07:13.

Scottish Hydro Electric Power Dis logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Footpath Between Cannock Way And Gipsy Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Footpath Between Cannock Way And Gipsy Lane, Earley.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jan 2025 at 10:44.

Wokingham Borough Council logo
LONG TERM
Between
2 Jun and 28 Aug 2025
Details
View Map
Share
Follow
A3290 Bravo

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A3290 Bravo, Earley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 28 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 19 Feb 2025 at 09:01.

Wokingham Borough Council logo
LONG TERM
Between
2 Jun and 28 Aug 2025
Details
View Map
Share
Follow
A3290 Alpha

Wokingham Borough Council are proposing to carry out Highway improvement works on A3290 Alpha, Earley.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 28 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by Wokingham Borough Council on 19 Feb 2025 at 09:02.

Scottish Hydro Electric Power Dis logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Gipsy Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Gipsy Lane, Earley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 12:12.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
9 Jun and 15 Aug 2025
Details
View Map
Share
Shackleton Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Shackleton Way, Woodley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 15 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Feb 2025 at 16:04.

Thames Water logo
Between
9 and 11 Jun 2025
Details
View Map
Share
Liverpool Road

Thames Water were proposing to carry out Utility repair and maintenance works on Liverpool Road, Reading.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 11 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Mar 2025 at 11:54.

Bracknell Forest Council logo
Between
10 and 16 Jun 2025
Details
View Map
Share
Follow
Dukes Ride

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Dukes Ride, Crowthorne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 16 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 4 Feb 2025 at 16:26.

Bracknell Forest Council logo
Between
10 and 16 Jun 2025
Details
View Map
Share
Dukes Ride

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Dukes Ride, Crowthorne.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 16 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 18 Mar 2025 at 13:44.

Cityfibre Metro Networks logo
Between
10 and 23 Jun 2025
Details
View Map
Share
Follow
Landsend Lane

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Landsend Lane, Charvil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Mar 2025 at 08:21.

Cityfibre Metro Networks logo
Between
10 and 23 Jun 2025
Details
View Map
Share
Follow
Beggars Hill Road

Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Beggars Hill Road, Charvil.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 19 Mar 2025 at 08:19.

Scottish Hydro Electric Power Dis logo
Between
16 Jun and 9 Jul 2025
Details
View Map
Share
Follow
Nine Mile Ride

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Nine Mile Ride, Finchampstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Mar 2025 at 08:31.

West Berkshire Council logo
Between
16 and 20 Jun 2025
Details
View Map
Share
Follow
Pingewood Road South

West Berkshire Council are proposing to carry out Highway improvement works on Pingewood Road South, Burghfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Berkshire Council on 11 Mar 2025 at 12:12.

BT logo
Between
17 and 19 Jun 2025
Details
View Map
Share
Follow
White House Lane

BT are proposing to carry out Utility asset works on White House Lane, Spencers Wood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2025 and could run through until 19 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 14 Mar 2025 at 10:16.


Roadworks Map near to Wood Lane, WOKINGHAM, RG41 4TS

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 22 Mar 2025 06:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wood Lane, WOKINGHAM, RG41 4TS (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Gigaclear logo
BARKHAM STREET 
(0.8 miles)
Gigaclear
Utility asset works - Footway - Two-way signals
Planned
Scheduled: 21 Mar 2025 - 25 Mar 2025
0.8
Details
Share
Follow
2
Thames Water logo
BIGGS LANE 
(0.8 miles)
Thames Water
New service connection - Carriageway, Verge - Multi-way signals
In Progress
Since: 17 Mar 2025 11:15
(Scheduled: 17 Mar 2025 - 25 Mar 2025)
0.8
Details
Share
Follow
3
Electricity Network Company logo
BIGGS LANE 
(0.8 miles)
Electricity Network Company
Utility asset works - Verge - No carriageway incursion
In Progress
Since: 17 Mar 2025 11:40
(Scheduled: 17 Mar 2025 - 28 Mar 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.