ROADWORKS SUMMARY
Carina Drive, WOKINGHAM, RG40 1BF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Carina Drive, RG40 1BF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Carina Drive, WOKINGHAM, RG40 1BF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Carina Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Until
21 Mar 2025
Details
View Map
Share
Follow
Frys Lane

Thames Water are carrying out Utility repair and maintenance works on Frys Lane, Yateley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 08:00 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 10:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
25 Nov 2024 and 21 Mar 2025
Details
View Map
Share
Follow
Doddington Close

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Doddington Close, Earley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Nov 2024 at 14:22.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
25 Nov 2024 and 21 Mar 2025
Details
View Map
Share
Meldreth Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Meldreth Way, Earley.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Nov 2024 at 11:03.

Southern Gas Networks logo
LONG TERM
Between
9 Dec 2024 and 28 Mar 2025
Details
View Map
Share
London Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Oct 2024 at 12:23.

Southern Gas Networks logo
LONG TERM
Until
24 Mar 2025
Details
View Map
Share
Follow
Yorktown Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Yorktown Road, Sandhurst.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 30 January 2025 at 07:30 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Feb 2025 at 12:38.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 2 May 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 22 Oct 2024 at 10:16.

Thames Water logo
LONG TERM
Between
3 Feb and 22 May 2025
Details
View Map
Share
Goddard Way

Thames Water were proposing to carry out Utility asset works on Goddard Way, Warfield, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 22 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jan 2025 at 15:13.

Thames Water logo
LONG TERM
Between
3 Feb and 22 May 2025
Details
View Map
Share
Harvest Ride

Thames Water were proposing to carry out Utility asset works on Harvest Ride, Warfield, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 22 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Jan 2025 at 16:17.

Thames Water logo
LONG TERM
Between
3 Feb and 22 May 2025
Details
View Map
Share
Harvest Ride

Thames Water were proposing to carry out Utility asset works on Harvest Ride, Warfield, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 22 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Jan 2025 at 10:34.

Southern Gas Networks logo
LONG TERM
Between
10 Feb and 19 May 2025
Details
View Map
Share
London Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on London Road, Wokingham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 19 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Jan 2025 at 14:25.

Cadent Gas logo
LONG TERM
Between
12 Feb and 20 Apr 2025
Details
View Map
Share
Follow
Footpath 54 Liscombe To Ringmead

Cadent Gas are proposing to carry out Utility asset works on Footpath 54 Liscombe To Ringmead, Bracknell.

These works are categorised as Major.

The works will start on or after 12 February 2025 and could run through until 20 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Dec 2024 at 09:41.

Cadent Gas logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Footpath 54 Liscombe To Ringmead

Cadent Gas are carrying out Utility asset works on Footpath 54 Liscombe To Ringmead, Bracknell.

These works are categorised as Major.

The works started on 18 February 2025 at 09:33 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Feb 2025 at 09:47.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Bagshot Road

Thames Water were proposing to carry out Utility repair and maintenance works on Bagshot Road, Bracknell.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 13 Feb 2025 at 07:24.

Bracknell Forest Council logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 11:03.

Bracknell Forest Council logo
Until
11 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Bracknell Forest Council are carrying out Highway repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 00:00 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 26 Feb 2025 at 12:22.

Bracknell Forest Council logo
Between
24 Feb and 11 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 12 Dec 2024 at 15:32.

Bracknell Forest Council logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 4 Feb 2025 at 16:18.

Bracknell Forest Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Bracknell Forest Council are carrying out Highway repair and maintenance works on Mill Lane, Bracknell.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 24 February 2025 at 00:00 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 24 Feb 2025 at 16:29.

Southern Gas Networks logo
LONG TERM
Until
3 Jun 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are carrying out Utility repair and maintenance works on London Road, Wokingham.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 February 2025 at 10:40 and could run through until 3 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Feb 2025 at 10:58.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Mar and 26 Apr 2025
Details
View Map
Share
Ringmead

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ringmead, Hanworth, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 26 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Nov 2024 at 10:21.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
1 Mar and 26 Apr 2025
Details
View Map
Share
Ringmead

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Ringmead, Hanworth, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 March 2025 and run through until 26 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Dec 2024 at 12:26.

South East Water logo
Finishing
Thursday
Details
View Map
Share
Follow
Crowthorne Road

South East Water are carrying out Utility repair and maintenance works on Crowthorne Road, Bracknell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 March 2025 at 10:00 and could run through until 6 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 1 Mar 2025 at 11:32.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Lower Wokingham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 10:49.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Lower Wokingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 12:39.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Lower Wokingham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 7 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2025 at 08:37.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 7 Apr 2025
Details
View Map
Share
Follow
Lower Wokingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 31 Jan 2025 at 13:05.

Virgin Media logo
Finishing
Tomorrow
Details
View Map
Share
The Terrace

Virgin Media were proposing to carry out Utility asset works on The Terrace, Wokingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Virgin Media on 27 Dec 2024 at 10:34.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
3 Mar and 16 May 2025
Details
View Map
Share
Follow
Cannock Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cannock Way, Earley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 12:10.

Wokingham Borough Council logo
Between
3 and 28 Mar 2025
Details
View Map
Share
Follow
Headley Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wokingham Borough Council on 19 Nov 2024 at 10:13.

Southern Gas Networks logo
LONG TERM
Until
11 Apr 2025
Details
View Map
Share
Follow
Waltham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Waltham Road, Twyford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 3 March 2025 at 08:00 and could run through until 11 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 08:30.

South East Water logo
Finishing
Friday
Details
View Map
Share
Follow
Finchampstead Road

South East Water are proposing to carry out Utility repair and maintenance works on Finchampstead Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 10 Dec 2024 at 08:53.

South East Water logo
Finishing
Friday
Details
View Map
Share
Follow
Finchampstead Road

South East Water are proposing to carry out Utility repair and maintenance works on Finchampstead Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 23 Jan 2025 at 12:44.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
10 Mar and 30 Apr 2025
Details
View Map
Share
Follow
Old Bracknell Lane West

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Feb 2025 at 09:51.

Bracknell Forest Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Station Roundabout

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Roundabout, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 16:30.

Bracknell Forest Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Station Roundabout

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Roundabout, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Feb 2025 at 16:30.

Bracknell Forest Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Market Street

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Market Street, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 23 Jan 2025 at 09:18.

Bracknell Forest Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Church Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Church Road, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 10:33.

Bracknell Forest Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Church Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Church Road, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 21 Feb 2025 at 16:17.

Bracknell Forest Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Station Way

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Way, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 17 Feb 2025 at 16:12.

Bracknell Forest Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Station Way

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Station Way, Bracknell.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 24 Feb 2025 at 16:30.

Bracknell Forest Council logo
LONG TERM
Between
10 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Harvest Ride

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Harvest Ride, Warfield, Bracknell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 10:38.

Bracknell Forest Council logo
LONG TERM
Between
10 Mar and 16 May 2025
Details
View Map
Share
Follow
Malt Hill

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Malt Hill, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 12 Sep 2024 at 09:14.

Bracknell Forest Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 12 Dec 2024 at 15:33.

Bracknell Forest Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Broad Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Broad Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 5 Feb 2025 at 15:36.

Southern Gas Networks logo
Between
13 and 27 Mar 2025
Details
View Map
Share
Follow
Lower Wokingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 March 2025 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Mar 2025 at 09:15.

Southern Gas Networks logo
LONG TERM
Between
14 Mar and 21 Apr 2025
Details
View Map
Share
Follow
Lower Wokingham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lower Wokingham Road, Crowthorne.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 21 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Feb 2025 at 14:54.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Mar and 16 May 2025
Details
View Map
Share
Follow
Jameston

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Jameston, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Feb 2025 at 12:22.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Mar and 30 Apr 2025
Details
View Map
Share
Old Bracknell Lane West

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 30 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 14:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
17 Mar and 30 Apr 2025
Details
View Map
Share
Follow
Old Bracknell Lane West

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Old Bracknell Lane West, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Dec 2024 at 16:05.

Thames Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Edneys Hill

Thames Water were proposing to carry out Utility repair and maintenance works on Edneys Hill, Barkham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 11:15.

South East Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
Barkham Road

South East Water are proposing to carry out Remedial works on Barkham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by South East Water on 11 Dec 2024 at 12:55.

Wokingham Borough Council logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Finchampstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 10 Feb 2025 at 08:14.

Wokingham Borough Council logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Finchampstead.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 25 Feb 2025 at 09:51.

Scottish Hydro Electric Power Dis logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Honey Hill

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Honey Hill, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jan 2025 at 09:39.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Mill Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Mill Lane, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 09:53.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Wildridings Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Wildridings Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 7 Jan 2025 at 09:51.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Wildridings Road

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Wildridings Road, Bracknell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 14 Feb 2025 at 15:08.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
London Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on London Road, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 19 Dec 2024 at 10:10.

Bracknell Forest Council logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
London Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on London Road, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 30 Dec 2024 at 15:01.

Cadent Gas logo
Between
28 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Ringmead

Cadent Gas are proposing to carry out Utility asset works on Ringmead, Birch Hill, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 10:11.

Cadent Gas logo
Between
28 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Ringmead

Cadent Gas are proposing to carry out Utility asset works on Ringmead, Birch Hill, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Feb 2025 at 11:12.

Bracknell Forest Council logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Nine Mile Ride

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Nine Mile Ride, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 6 Feb 2025 at 10:20.

Cadent Gas logo
Between
31 Mar and 17 Apr 2025
Details
View Map
Share
Bay Drive

Cadent Gas were proposing to carry out Utility asset works on Bay Drive, Bracknell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 17 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 12 Feb 2025 at 09:09.

Cadent Gas logo
Between
31 Mar and 17 Apr 2025
Details
View Map
Share
Follow
Bay Drive

Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 19 Feb 2025 at 17:58.

Cadent Gas logo
Between
31 Mar and 12 Apr 2025
Details
View Map
Share
Follow
Bay Drive

Cadent Gas are proposing to carry out Utility asset works on Bay Drive, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 12 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 28 Feb 2025 at 13:52.

Thames Water logo
LONG TERM
Between
5 Apr and 11 May 2025
Details
View Map
Share
Follow
Harvest Ride

Thames Water are proposing to carry out Utility asset works on Harvest Ride, Warfield, Bracknell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 April 2025 and could run through until 11 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Feb 2025 at 14:37.

Southern Gas Networks logo
Between
7 Apr and 5 May 2025
Details
View Map
Share
Follow
Albion Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Road, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jan 2025 at 10:58.

Southern Gas Networks logo
Between
7 Apr and 5 May 2025
Details
View Map
Share
Follow
Albion Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Albion Road, Sandhurst.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 5 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 09:05.

Thames Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Edneys Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Edneys Hill, Barkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Dec 2024 at 11:49.

Thames Water logo
Between
7 and 9 Apr 2025
Details
View Map
Share
Follow
Edneys Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Edneys Hill, Barkham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 9 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Dec 2024 at 08:51.

Nexfibre Networks Limited logo
Between
7 and 29 Apr 2025
Details
View Map
Share
Follow
Locks Ride

Nexfibre Networks Limited are proposing to carry out Utility asset works on Locks Ride, Ascot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 29 April 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Nexfibre Networks Limited on 7 Jan 2025 at 09:49.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Winkfield Row

Bracknell Forest Council were proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 10 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 16 Dec 2024 at 11:12.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winkfield Row

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 9 Dec 2024 at 15:32.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winkfield Row

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 19 Dec 2024 at 11:35.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winkfield Row

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 14 Jan 2025 at 08:09.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winkfield Row

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 17 Jan 2025 at 16:09.

Bracknell Forest Council logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Winkfield Row

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Row, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 22 Jan 2025 at 12:42.

Bracknell Forest Council logo
Between
7 and 15 Apr 2025
Details
View Map
Share
Follow
Bottle Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bottle Lane, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 12:04.

Bracknell Forest Council logo
Between
7 and 15 Apr 2025
Details
View Map
Share
Follow
Bottle Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bottle Lane, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 18 Feb 2025 at 12:36.

Bracknell Forest Council logo
Between
7 and 15 Apr 2025
Details
View Map
Share
Follow
Bottle Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bottle Lane, Binfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Feb 2025 at 12:27.

Thames Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Swallowfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Swallowfield Road, Arborfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jan 2025 at 09:41.

Thames Water logo
Between
8 and 10 Apr 2025
Details
View Map
Share
Follow
Swallowfield Road

Thames Water are proposing to carry out Utility repair and maintenance works on Swallowfield Road, Arborfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 13:08.

BT logo
Between
10 and 14 Apr 2025
Details
View Map
Share
Follow
Old Wokingham Road

BT are proposing to carry out Utility asset works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 April 2025 and could run through until 14 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Feb 2025 at 09:16.

Wokingham Borough Council logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Wokingham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 10 Feb 2025 at 08:18.

Wokingham Borough Council logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Sindlesham Road

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Sindlesham Road, Arborfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 16 Jan 2025 at 11:02.

South East Water logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Newell Green

South East Water are proposing to carry out New service connection on Newell Green, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 10 Feb 2025 at 16:28.

South East Water logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Newell Green

South East Water are proposing to carry out New service connection on Newell Green, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 19 Feb 2025 at 18:27.

Southern Gas Networks logo
LONG TERM
Between
14 Apr and 7 Jul 2025
Details
View Map
Share
Follow
Colemans Moor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Colemans Moor Road, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 7 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Jan 2025 at 10:56.

Hampshire County Council logo
Between
28 Apr and 12 May 2025
Details
View Map
Share
Follow
Ives Close

Hampshire County Council are proposing to carry out Highway improvement works on Ives Close, Yateley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Hampshire County Council on 15 Jan 2025 at 15:01.

South East Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Waterloo Road

South East Water are proposing to carry out Utility repair and maintenance works on Waterloo Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the verge only.

This roadwork event was last updated by South East Water on 6 Feb 2025 at 10:22.

Bracknell Forest Council logo
Between
30 Apr and 6 May 2025
Details
View Map
Share
Follow
Winkfield Lane

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Winkfield Lane, Winkfield, Windsor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 April 2025 and could run through until 6 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 13 Feb 2025 at 14:25.

BT logo
Between
5 and 7 May 2025
Details
View Map
Share
Old Wokingham Road

BT were proposing to carry out Utility asset works on Old Wokingham Road, Wokingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 May 2025 and run through until 7 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 21 Jan 2025 at 16:39.

Southern Gas Networks logo
LONG TERM
Between
5 May and 13 Jun 2025
Details
View Map
Share
Follow
Waltham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waltham Road, Twyford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 29 Nov 2024 at 12:41.

Southern Gas Networks logo
LONG TERM
Between
5 May and 13 Jun 2025
Details
View Map
Share
Follow
Waltham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Waltham Road, Twyford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 9 Dec 2024 at 12:03.

Bracknell Forest Council logo
Between
7 and 16 May 2025
Details
View Map
Share
Follow
Old Wokingham Road

Bracknell Forest Council are proposing to carry out Highway improvement works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Feb 2025 at 12:33.

Bracknell Forest Council logo
Between
7 and 16 May 2025
Details
View Map
Share
Follow
Old Wokingham Road

Bracknell Forest Council are proposing to carry out Highway improvement works on Old Wokingham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 27 Feb 2025 at 15:17.

South East Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Newell Green

South East Water are proposing to carry out New service connection on Newell Green, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 20 Feb 2025 at 11:51.

South East Water logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Newell Green

South East Water are proposing to carry out New service connection on Newell Green, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by South East Water on 27 Feb 2025 at 09:21.

Wokingham Borough Council logo
Between
12 and 15 May 2025
Details
View Map
Share
Follow
Finchampstead Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Finchampstead Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 10 Feb 2025 at 15:01.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Bravo

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Bravo, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 08:22.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Bravo

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Bravo, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:51.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Bravo On From Coppid Beech

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Bravo On From Coppid Beech, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 08:22.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Bravo On From Coppid Beech

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Bravo On From Coppid Beech, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:51.

Bracknell Forest Council logo
LONG TERM
Between
12 May and 27 Jun 2025
Details
View Map
Share
Follow
Harvest Ride

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Harvest Ride, Warfield, Bracknell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 28 Feb 2025 at 09:28.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
M4 J10 Leave E

Wokingham Borough Council are proposing to carry out roadworks on M4 J10 Leave E, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 3 Mar 2025 at 16:31.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
M4 J10 Leave W

Wokingham Borough Council are proposing to carry out roadworks on M4 J10 Leave W, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 3 Mar 2025 at 16:31.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Alpha

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Alpha, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:48.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
A329(M) Alpha

Wokingham Borough Council were proposing to carry out Highway repair and maintenance works on A329(M) Alpha, Wokingham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 11:03.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Alpha On From Bader Way

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Alpha On From Bader Way, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 08:23.

Wokingham Borough Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Follow
A329(M) Alpha On From Bader Way

Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A329(M) Alpha On From Bader Way, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wokingham Borough Council on 7 Feb 2025 at 12:51.

Wokingham Borough Council logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Headley Road

Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Wokingham Borough Council on 10 Jan 2025 at 12:08.

Thames Water logo
Between
12 and 23 May 2025
Details
View Map
Share
Church Street

Thames Water were proposing to carry out Utility repair and maintenance works on Church Street, Twyford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 17 Feb 2025 at 11:39.

Bracknell Forest Council logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
New Wokingham Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on New Wokingham Road, Crowthorne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 6 Feb 2025 at 10:19.

Bracknell Forest Council logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Dukes Ride

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Dukes Ride, Crowthorne.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 6 Feb 2025 at 10:16.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
19 May and 27 Jun 2025
Details
View Map
Share
Follow
Shackleton Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Shackleton Way, Woodley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 27 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Feb 2025 at 11:36.

Bracknell Forest Council logo
Between
21 and 24 May 2025
Details
View Map
Share
Follow
Lovelace Road

Bracknell Forest Council are proposing to carry out Highway improvement works on Lovelace Road, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 24 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 24 Feb 2025 at 11:18.

South East Water logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Osborne Lane

South East Water are proposing to carry out Utility repair and maintenance works on Osborne Lane, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 14 Jan 2025 at 08:15.

South East Water logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Osborne Lane

South East Water are proposing to carry out Utility repair and maintenance works on Osborne Lane, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 15 Jan 2025 at 08:26.

South East Water logo
Between
21 and 23 May 2025
Details
View Map
Share
Follow
Osborne Lane

South East Water are proposing to carry out Utility repair and maintenance works on Osborne Lane, Warfield, Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by South East Water on 31 Jan 2025 at 15:29.

BT logo
Between
27 and 29 May 2025
Details
View Map
Share
Follow
Park Lane

BT are proposing to carry out Utility asset works on Park Lane, Finchampstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 29 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 19 Feb 2025 at 14:41.

Bracknell Forest Council logo
Between
27 and 31 May 2025
Details
View Map
Share
Follow
Bracknell Road

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Bracknell Road, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 27 Feb 2025 at 14:09.

Bracknell Forest Council logo
Between
27 and 31 May 2025
Details
View Map
Share
Follow
Foresters Way

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Foresters Way, Crowthorne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 24 Feb 2025 at 11:47.

Bracknell Forest Council logo
Between
27 and 31 May 2025
Details
View Map
Share
Follow
Crowthorne Road (A3095)

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Crowthorne Road (A3095), Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 25 Feb 2025 at 12:35.

Bracknell Forest Council logo
Between
27 and 31 May 2025
Details
View Map
Share
Follow
Crowthorne Road (A3095)

Bracknell Forest Council are proposing to carry out Highway repair and maintenance works on Crowthorne Road (A3095), Bracknell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 31 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Bracknell Forest Council on 26 Feb 2025 at 15:22.

Network Rail logo
Between
30 May and 2 Jun 2025
Details
View Map
Share
Follow
Barkham Road

Network Rail are proposing to carry out Works for Rail Purposes on Barkham Road, Wokingham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2025 and could run through until 2 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 3 Mar 2025 at 09:04.


Roadworks Map near to Carina Drive, WOKINGHAM, RG40 1BF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Mar 2025 10:55
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Carina Drive, WOKINGHAM, RG40 1BF (14 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
PLOUGH LANE 
(0.1 miles)
BT
Utility asset works - Footway, Carriageway - Give and take
Planned
Scheduled: 5 Mar 2025 - 7 Mar 2025
0.1
Details
Share
Follow
2
Southern Gas Networks logo
MAJOR
  
BEAN OAK ROAD 
(0.1 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Cancelled
(Scheduled: 17 Feb 2025 - 14 Mar 2025)
0.1
Details
Share
3
Southern Gas Networks logo
MAJOR
  
LONDON ROAD 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 9 Dec 2024 - 28 Mar 2025)
0.2
Details
Share
4
Southern Gas Networks logo
MAJOR
  
LONDON ROAD 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 27 Jan 2025 - 2 May 2025
0.2
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
LONDON ROAD 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Cancelled
(Scheduled: 10 Feb 2025 - 19 May 2025)
0.2
Details
Share
6
Southern Gas Networks logo
MAJOR
  
LONDON ROAD 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 25 Feb 2025 10:40
(Scheduled: 24 Feb 2025 - 3 Jun 2025)
0.2
Details
Share
Follow
7
Nexfibre Networks Limited logo
WHITLOCK AVENUE 
(0.3 miles)
Nexfibre Networks Limited
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 5 Mar 2025 - 7 Mar 2025
0.3
Details
Share
Follow
8
BT logo
WOODROW DRIVE 
(0.3 miles)
BT
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 27 Feb 2025 10:58
(Scheduled: 27 Feb 2025 - 4 Mar 2025)
0.3
Details
Share
Follow
9
Southern Gas Networks logo
MAJOR
  
BINFIELD ROAD 
(0.4 miles)
Southern Gas Networks
Optional permit (no fee) e.g. for traffic management etc - Footway, Carriageway, Verge - No carriageway incursion
In Progress
Since: 9 Oct 2024 08:00
(Scheduled: 7 Oct 2024 - 3 Jun 2025)
0.4
Details
Share
Follow
10
Southern Gas Networks logo
MAJOR
  
BARRETT CRESCENT 
(0.5 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 3 Feb 2025 - 17 Mar 2025
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.