ROADWORKS SUMMARY
Friar Street, READING, RG1 1DB
Introduction
View current and future planned roadworks and road closures for Friar Street, RG1 1DB and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Friar Street, READING, RG1 1DB
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Friar Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 May 2025
National Highways are carrying out Highway improvement works on Rose Kiln Lane, Reading.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 1 April 2024 at 09:30 and could run through until 31 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by National Highways on 23 Oct 2024 at 14:03.
Tuesday
Reading Borough Council are proposing to carry out Highway improvement works on Oxford Road, Reading.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 31 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Reading Borough Council on 10 Jul 2024 at 10:50.
1 Sep 2024 and 31 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on A4 Bath Road And M4 Junction 12 Roundabout, Theale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 September 2024 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by National Highways on 3 May 2024 at 11:44.
16 Feb 2025
Thames Water are carrying out Utility asset works on Waingels Road, Charvil.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 16 September 2024 at 10:00 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 11:42.
16 Sep 2024 and 16 Feb 2025
Thames Water are proposing to carry out Utility asset works on Waingels Road, Charvil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 September 2024 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Thames Water on 14 Aug 2024 at 13:35.
21 Oct 2024 and 31 Jan 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on High Street, Theale.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 21 October 2024 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Aug 2024 at 14:32.
27 Jan 2025
Oxfordshire County Council are carrying out roadworks on Orchard Avenue, Sonning Common, Reading.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:30 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 09:05.
25 Nov 2024 and 21 Mar 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Meldreth Way, Earley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 25 November 2024 and run through until 21 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Nov 2024 at 11:03.
25 Nov 2024 and 21 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Doddington Close, Earley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Nov 2024 at 14:22.
12 Feb 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Hamilton Road, Reading.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 November 2024 at 15:00 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 15:19.
2 Dec 2024 and 28 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Chittering Close, Earley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 15 Nov 2024 at 14:24.
9 Dec 2024 and 31 Jan 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Widmore Lane, Sonning Common, Reading.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Dec 2024 at 13:49.
9 Dec 2024 and 31 Jan 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Widmore Lane, Sonning Common, Reading.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Dec 2024 at 13:51.
Tuesday
Network Rail were proposing to carry out Works for Rail Purposes on Burghfield Road, Reading.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 31 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 14 Nov 2024 at 10:48.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway improvement works on A3290 Alpha, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Wokingham Borough Council on 11 Sep 2024 at 13:51.
6 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Theale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 12:21.
6 and 9 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Duffield Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 3 Oct 2024 at 11:23.
6 Jan and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Theale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Sep 2024 at 12:36.
6 and 11 Jan 2025
Network Rail were proposing to carry out Works for Rail Purposes on Burghfield Road, Reading.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 11 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 13 Nov 2024 at 10:50.
6 and 24 Jan 2025
Network Rail were proposing to carry out Works for Rail Purposes on Western Avenue, Woodley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 24 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Dec 2024 at 10:36.
6 Jan and 16 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on A4 Bath Road And M4 Junction 12 Roundabout, Theale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Highways on 17 Sep 2024 at 11:54.
6 and 10 Jan 2025
Cityfibre Metro Networks are proposing to carry out Statutory Infrastructure Works on Northumberland Avenue, Reading.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Cityfibre Metro Networks on 5 Dec 2024 at 14:02.
6 Jan and 16 Mar 2025
National Highways are proposing to carry out Highway repair and maintenance works on A4 Bath Road And M4 Junction 12 Roundabout, Theale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by National Highways on 18 Dec 2024 at 13:45.
6 Jan and 30 May 2025
Southern Gas Networks were proposing to carry out roadworks on Hollins Walk, Reading.
These works were categorised as Major.
The works were not intending to impact the carriageway. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 30 May 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Dec 2024 at 08:17.
6 and 10 Jan 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Widmore Lane, Sonning Common, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 19 Dec 2024 at 10:47.
6 Jan and 12 Feb 2025
Reading Borough Council are proposing to carry out Highway improvement works on Richfield Avenue, Reading.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Reading Borough Council on 2 Dec 2024 at 09:22.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway improvement works on A3290 Alpha, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Wokingham Borough Council on 27 Sep 2024 at 10:06.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A3290 Bravo, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 11 Sep 2024 at 13:54.
6 Jan and 27 Mar 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on A3290 Bravo, Earley.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 27 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 27 Sep 2024 at 10:17.
6 Jan and 12 Feb 2025
Reading Borough Council are proposing to carry out Highway improvement works on Richfield Avenue, Reading.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Reading Borough Council on 22 Nov 2024 at 11:11.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Liebenrood Road, Reading.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 19 Dec 2024 at 11:28.
8 and 10 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Chazey Heath, Mapledurham, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Sep 2024 at 11:47.
8 Jan and 5 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Virginia Way, Reading.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Nov 2024 at 16:40.
8 and 10 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Chazey Heath, Mapledurham, Reading.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 24 Oct 2024 at 08:32.
13 and 30 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Headley Road East, Woodley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 16:51.
13 and 30 Jan 2025
Southern Gas Networks are proposing to carry out New service connection on Headley Road East, Woodley.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 25 Nov 2024 at 11:45.
13 Jan and 3 Mar 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hildens Drive, Tilehurst, Reading.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 3 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 10:05.
13 Jan and 3 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hildens Drive, Tilehurst, Reading.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 3 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 12:25.
13 Jan and 7 Mar 2025
BT were proposing to carry out Utility repair and maintenance works on Oxford Road, Reading.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Dec 2024 at 11:46.
13 Jan and 7 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Oxford Road, Reading.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 12 Dec 2024 at 18:22.
14 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Blounts Court Road, Sonning Common, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 12:57.
14 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Blounts Court Road, Sonning Common, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 15 Nov 2024 at 11:47.
15 and 17 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Blounts Court Road, Sonning Common, Reading.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 January 2025 and run through until 17 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 5 Dec 2024 at 10:05.
20 and 24 Jan 2025
Thames Water were proposing to carry out Remedial works on Pond Head Lane, Earley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Oct 2024 at 07:30.
20 and 24 Jan 2025
Thames Water are proposing to carry out Remedial works on Pond Head Lane, Earley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 2 Oct 2024 at 16:03.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Earley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 13:18.
20 Jan and 27 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Parkside Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 27 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Dec 2024 at 16:30.
20 Jan and 14 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Whitley Wood Lane, Reading.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Oct 2024 at 11:31.
21 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Sulham Hill, Sulham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:49.
21 and 24 Jan 2025
Thames Water are proposing to carry out New service connection on Sulham Hill, Sulham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 29 Oct 2024 at 13:27.
22 and 25 Jan 2025
Thames Water are proposing to carry out New service connection on Pincents Kiln, Calcot, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 14:20.
22 and 25 Jan 2025
Thames Water are proposing to carry out New service connection on Pincents Kiln, Calcot, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 4 Nov 2024 at 09:20.
27 and 29 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Brunswick Street, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 1 Nov 2024 at 12:54.
27 Jan and 22 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Theale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 10:51.
27 Jan and 21 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Liebenrood Road, Reading.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 20 Dec 2024 at 14:47.
27 Jan and 22 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Theale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 22 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 26 Nov 2024 at 11:45.
3 and 5 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Sulham Hill, Tilehurst, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 13:44.
3 Feb and 28 Mar 2025
BT are proposing to carry out Utility repair and maintenance works on Oxford Road, Reading.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 18 Dec 2024 at 11:50.
3 and 11 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Park Lane, Tilehurst, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Oct 2024 at 14:40.
10 and 25 Feb 2025
BT were proposing to carry out Utility asset works on Reading Road, Cane End, Reading.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 25 February 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 3 Dec 2024 at 11:11.
11 and 13 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Short, Purley On Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 14 Nov 2024 at 11:17.
11 and 13 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on The Short, Purley On Thames.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Dec 2024 at 16:30.
14 and 23 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Crescent Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 23 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 12:18.
17 and 21 Feb 2025
BT are proposing to carry out Utility asset works on Odell Close, Earley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 5 Dec 2024 at 13:41.
17 and 21 Feb 2025
BT are proposing to carry out Utility asset works on Odell Close, Earley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 13 Dec 2024 at 10:36.
17 and 20 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Park Lane, Charvil.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 17 Sep 2024 at 16:47.
17 Feb and 7 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Church Road, Earley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 6 Nov 2024 at 15:24.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Oxford Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 3 Dec 2024 at 13:30.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Whiteknights Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 26 Nov 2024 at 16:35.
26 and 28 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Church Hill, Hurst.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 18 Dec 2024 at 09:41.
26 and 28 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Hill, Hurst.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 4 Dec 2024 at 09:08.
26 and 28 Feb 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Church Hill, Hurst.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 26 February 2025 and run through until 28 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 24 Dec 2024 at 10:55.
3 and 21 Mar 2025
Electricity Network Company are proposing to carry out Utility asset works on Hexham Road, Reading.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Electricity Network Company on 27 Nov 2024 at 11:21.
3 and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hollins Walk, Reading.
These works are categorised as Major.
The works are not expected to impact the carriageway.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Oct 2024 at 17:16.
3 Mar and 16 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Cannock Way, Earley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 12:10.
3 and 28 Mar 2025
Wokingham Borough Council are proposing to carry out Highway improvement works on Headley Road, Woodley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wokingham Borough Council on 19 Nov 2024 at 10:13.
3 Mar and 23 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Coronation Square, Reading.
These works are categorised as Major.
The works will start on or after 3 March 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Dec 2024 at 16:31.
4 and 6 Mar 2025
Thames Water were proposing to carry out Utility repair and maintenance works on New Road, Henley-on-thames.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 10 Dec 2024 at 13:46.
6 and 15 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Peppard Road, Emmer Green, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 March 2025 and could run through until 15 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 19 Dec 2024 at 14:42.
6 and 15 Mar 2025
Oxfordshire County Council were proposing to carry out Highway improvement works on Peppard Road, Emmer Green, Reading.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 March 2025 and run through until 15 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 19 Dec 2024 at 14:39.
10 and 15 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Christchurch Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 6 Dec 2024 at 10:06.
10 and 12 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Blounts Court Road, Sonning Common, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 12:18.
10 and 12 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Swansea Road, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 11:16.
11 and 15 Mar 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Whitley Wood Lane, Shinfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 23 Dec 2024 at 12:37.
11 and 15 Mar 2025
Wokingham Borough Council are proposing to carry out Highway repair and maintenance works on Whitley Wood Lane, Shinfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 15 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wokingham Borough Council on 5 Dec 2024 at 13:44.
11 and 17 Mar 2025
BT are proposing to carry out Utility asset works on Duke Street, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 9 Dec 2024 at 16:33.
17 Mar and 23 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Virginia Way, Reading.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Dec 2024 at 16:30.
17 and 19 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Peppard Road, Emmer Green, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Dec 2024 at 08:38.
17 and 19 Mar 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Horsepond Road, Gallowstree Common, Reading.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 13 Dec 2024 at 12:23.
Roadworks Map near to Friar Street, READING, RG1 1DB
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Friar Street, READING, RG1 1DB (1 Events)
(Scheduled Dates)
(miles)
(Scheduled: 1 Apr 2024 - 31 May 2025)
Contains public sector information licensed under the Open Government Licence v3.0.