ROADWORKS SUMMARY
Lytham Road, SOUTHPORT, PR9 9TZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lytham Road, PR9 9TZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lytham Road, SOUTHPORT, PR9 9TZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lytham Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Between
20 Oct 2023 and 30 Mar 2025
Details
View Map
Share
Follow
East Cliffe

Lancashire County Council are proposing to carry out Highway repair and maintenance works on East Cliffe, Lytham St Annes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2023 and could run through until 30 March 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 21 Jul 2023 at 07:43.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
28 Aug 2024 and 4 Jun 2025
Details
View Map
Share
Market Street

Sefton Metropolitan Borough Council were proposing to carry out Highway improvement works on Market Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2024 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Sep 2024 at 09:58.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
28 Aug 2024 and 4 Jun 2025
Details
View Map
Share
Eastbank Street

Sefton Metropolitan Borough Council were proposing to carry out Highway improvement works on Eastbank Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2024 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Sep 2024 at 09:59.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
28 Aug 2024 and 4 Jun 2025
Details
View Map
Share
King Street

Sefton Metropolitan Borough Council were proposing to carry out Highway improvement works on King Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2024 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Sep 2024 at 09:58.

ManWeb logo
LONG TERM
Between
30 Oct 2024 and 8 Jan 2025
Details
View Map
Share
Town Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Town Lane, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 October 2024 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 1 Aug 2024 at 12:28.

Cadent Gas logo
LONG TERM
Finishing
Monday
Details
View Map
Share
Follow
Norwood Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 11 November 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 20 Aug 2024 at 14:48.

ManWeb logo
LONG TERM
Between
18 Nov 2024 and 4 Feb 2025
Details
View Map
Share
Town Lane Kew

ManWeb were proposing to carry out Utility repair and maintenance works on Town Lane Kew, Southport.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 4 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 16 Oct 2024 at 12:53.

ManWeb logo
LONG TERM
Until
15 Jan 2025
Details
View Map
Share
Follow
Town Lane Kew

ManWeb are carrying out Utility repair and maintenance works on Town Lane Kew, Southport.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:28 and could run through until 15 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 5 Dec 2024 at 13:50.

Sefton Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
North Road

Sefton Metropolitan Borough Council are proposing to carry out Utility asset works on North Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 25 Nov 2024 at 11:48.

Sefton Metropolitan Borough Council logo
Finishing
Friday
Details
View Map
Share
Follow
North Road

Sefton Metropolitan Borough Council are carrying out Utility asset works on North Road, Southport.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 09:00 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Nov 2024 at 11:30.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Poplar Street

Cadent Gas were proposing to carry out Utility asset works on Poplar Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:29.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Hart Street

Cadent Gas were proposing to carry out Utility asset works on Hart Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 23 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 13:21.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Hart Street

Cadent Gas are proposing to carry out Utility asset works on Hart Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Sep 2024 at 12:24.

Sefton Metropolitan Borough Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Gloucester Road

Sefton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Gloucester Road, Birkdale.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 12:58 and could run through until 24 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 16 Dec 2024 at 12:58.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Woodmoss Lane

Lancashire County Council are carrying out Highway repair and maintenance works on Woodmoss Lane, Scarisbrick.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 December 2024 at 11:45 and could run through until 20 December 2024. The works will impact the verge only.

This roadwork event was last updated by Lancashire County Council on 17 Dec 2024 at 13:39.

United Utilities Water (formerly North West Water) logo
Finishing
Friday
Details
View Map
Share
Follow
Mill Lane

United Utilities Water (formerly North West Water) are carrying out Disconnection or alteration of supply on Mill Lane, Southport.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 10:30 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Dec 2024 at 14:50.

Cadent Gas logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Laburnum Grove

Cadent Gas are proposing to carry out Utility asset works on Laburnum Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:37.

Sefton Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Chester Avenue

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Chester Avenue, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:22.

Sefton Metropolitan Borough Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Chester Avenue

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Chester Avenue, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 14 Aug 2024 at 11:21.

Cadent Gas logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Norwood Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:36.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Market Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 22 Nov 2024 at 14:52.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
King Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on King Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 22 Nov 2024 at 14:52.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Market Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 24 Oct 2024 at 15:29.

Cadent Gas logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Shelley Grove

Cadent Gas are proposing to carry out Utility asset works on Shelley Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 13 Dec 2024 at 10:06.

ManWeb logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Benthams Way

ManWeb are proposing to carry out Utility repair and maintenance works on Benthams Way, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 25 Nov 2024 at 15:44.

Cadent Gas logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Cypress Road

Cadent Gas are proposing to carry out Utility asset works on Cypress Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:38.

Cadent Gas logo
Between
6 and 21 Jan 2025
Details
View Map
Share
Follow
Shelley Grove

Cadent Gas are proposing to carry out Utility asset works on Shelley Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 21 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 13:35.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Eastbank Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Eastbank Street, Southport.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 24 Oct 2024 at 15:26.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
King Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on King Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 24 Oct 2024 at 15:27.

Sefton Metropolitan Borough Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Griffiths Drive

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Griffiths Drive, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 14 Aug 2024 at 11:24.

Sefton Metropolitan Borough Council logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Griffiths Drive

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Griffiths Drive, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:11.

Sefton Metropolitan Borough Council logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Stretton Drive

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Stretton Drive, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 30 May 2024 at 07:36.

Sefton Metropolitan Borough Council logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Follow
Grosvenor Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Grosvenor Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 14 Aug 2024 at 10:45.

Sefton Metropolitan Borough Council logo
Between
20 and 29 Jan 2025
Details
View Map
Share
Follow
Grosvenor Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Grosvenor Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 20 May 2024 at 12:45.

United Utilities Water (formerly North West Water) logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Banks Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Banks Road, Banks.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 10:59.

United Utilities Water (formerly North West Water) logo
Between
22 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Banks Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility asset works on Banks Road, Banks.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 12:10.

Sefton Metropolitan Borough Council logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Westcliffe Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Westcliffe Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 20 May 2024 at 12:38.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

BT are proposing to carry out Utility asset works on Wellington Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 14 Nov 2024 at 11:45.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

BT are proposing to carry out Utility asset works on Wellington Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Nov 2024 at 16:36.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

BT are proposing to carry out Utility asset works on Wellington Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 22 Nov 2024 at 14:22.

BT logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Wellington Street

BT are proposing to carry out Utility asset works on Wellington Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 6 Nov 2024 at 14:21.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Sussex Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Sussex Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 15 Dec 2024 at 17:31.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Peel Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Peel Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 15 Dec 2024 at 17:30.

Sefton Metropolitan Borough Council logo
Between
27 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Westcliffe Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Westcliffe Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 11 Dec 2024 at 13:54.

The Environment Agency logo
LONG TERM
Between
27 Jan and 2 May 2025
Details
View Map
Share
Follow
Aveling Drive

The Environment Agency are proposing to carry out Section 50 on Aveling Drive, Banks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by The Environment Agency on 19 Jun 2024 at 10:49.

Sefton Metropolitan Borough Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Parklands

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Parklands, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:15.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Shore Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Shore Road, Hesketh Bank.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 12:02.

Sefton Metropolitan Borough Council logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Hawkshead Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Hawkshead Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:18.

Sefton Metropolitan Borough Council logo
Between
6 and 11 Feb 2025
Details
View Map
Share
Follow
Hawkshead Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Hawkshead Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 February 2025 and could run through until 11 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 12 Dec 2024 at 13:49.

Sefton Metropolitan Borough Council logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Hall Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Hall Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 3 Jun 2024 at 08:19.

Sefton Metropolitan Borough Council logo
Between
10 and 17 Feb 2025
Details
View Map
Share
Follow
Hall Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Hall Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 12 Dec 2024 at 13:47.

National Highways logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Heathey Lane

National Highways are proposing to carry out Works for Rail Purposes on Heathey Lane, Halsall.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 5 Nov 2024 at 11:37.

Cadent Gas logo
LONG TERM
Between
17 Feb and 6 Apr 2025
Details
View Map
Share
Kew Road

Cadent Gas were proposing to carry out Utility asset works on Kew Road, Birkdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:44.

Cadent Gas logo
Between
17 Feb and 4 Mar 2025
Details
View Map
Share
Bedford Road

Cadent Gas were proposing to carry out Utility asset works on Bedford Road, Birkdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 4 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:43.

ManWeb logo
Between
21 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Guildford Road

ManWeb are proposing to carry out Utility repair and maintenance works on Guildford Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 22 Nov 2024 at 14:20.

ManWeb logo
Between
21 Feb and 17 Mar 2025
Details
View Map
Share
Follow
Guildford Road

ManWeb are proposing to carry out Utility repair and maintenance works on Guildford Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 February 2025 and could run through until 17 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 2 Dec 2024 at 11:07.

Cadent Gas logo
Between
24 Feb and 16 Mar 2025
Details
View Map
Share
Compton Road

Cadent Gas were proposing to carry out Utility asset works on Compton Road, Birkdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 16 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:45.

BT logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Fish Lane

BT are proposing to carry out Utility asset works on Fish Lane, Burscough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Dec 2024 at 13:46.

BT logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Berry House Road

BT are proposing to carry out Utility asset works on Berry House Road, Scarisbrick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 2 Dec 2024 at 13:49.

Network Rail logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Bescar Lane

Network Rail were proposing to carry out Works for Rail Purposes on Bescar Lane, Scarisbrick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 13:38.

Network Rail logo
Between
25 and 28 Feb 2025
Details
View Map
Share
Pool Hey Lane

Network Rail were proposing to carry out Works for Rail Purposes on Pool Hey Lane, Scarisbrick.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 28 Nov 2024 at 13:33.

ManWeb logo
LONG TERM
Between
26 Feb and 24 Apr 2025
Details
View Map
Share
Benthams Way

ManWeb were proposing to carry out Utility repair and maintenance works on Benthams Way, Southport.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 24 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 16 Oct 2024 at 12:55.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Laburnum Grove

Cadent Gas are proposing to carry out Utility asset works on Laburnum Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:37.

Cadent Gas logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Eastbourne Road

Cadent Gas were proposing to carry out Utility asset works on Eastbourne Road, Birkdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:46.

Cadent Gas logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Claremont Road

Cadent Gas were proposing to carry out Utility asset works on Claremont Road, Birkdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 6 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 14:45.

United Utilities Water (formerly North West Water) logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Portland Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Portland Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 17:44.

United Utilities Water (formerly North West Water) logo
Between
3 and 11 Mar 2025
Details
View Map
Share
Follow
Portland Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Portland Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Dec 2024 at 17:39.

Cadent Gas logo
LONG TERM
Between
3 Mar and 6 Apr 2025
Details
View Map
Share
Follow
Norwood Road

Cadent Gas are proposing to carry out Utility asset works on Norwood Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 6 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:27.

Cadent Gas logo
Between
3 and 24 Mar 2025
Details
View Map
Share
Follow
Peel Street

Cadent Gas are proposing to carry out Utility asset works on Peel Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:29.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Cobden Road

Cadent Gas are proposing to carry out Utility asset works on Cobden Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:44.

Cadent Gas logo
Between
3 and 19 Mar 2025
Details
View Map
Share
Follow
Clifton Road

Cadent Gas are proposing to carry out Utility asset works on Clifton Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 19 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:31.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Cypress Road

Cadent Gas are proposing to carry out Utility asset works on Cypress Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:40.

Cadent Gas logo
Between
3 and 18 Mar 2025
Details
View Map
Share
Follow
Shelley Grove

Cadent Gas are proposing to carry out Utility asset works on Shelley Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 18 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 14:22.

Lancashire County Council logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Ansdell Road South

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Ansdell Road South, Lytham St Annes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 9 Dec 2024 at 12:23.

Lancashire County Council logo
Between
5 and 11 Mar 2025
Details
View Map
Share
Follow
Windsor Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Windsor Road, Ansdell, Lytham St Annes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 11 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 5 Dec 2024 at 12:11.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Fish Lane

BT are proposing to carry out Utility asset works on Fish Lane, Burscough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Dec 2024 at 09:54.

BT logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Berry House Road

BT are proposing to carry out Utility asset works on Berry House Road, Scarisbrick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 12 Dec 2024 at 09:52.

Lancashire County Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Windsor Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Windsor Road, Ansdell, Lytham St Annes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 9 Dec 2024 at 11:54.


Roadworks Map near to Lytham Road, SOUTHPORT, PR9 9TZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 03:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lytham Road, SOUTHPORT, PR9 9TZ (39 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Nexfibre Networks Limited logo
SHELLFIELD ROAD 
(0.1 miles)
Nexfibre Networks Limited
Permanent reinstatement - Footway - Some carriageway incursion
In Progress
Since: 16 Dec 2024 09:30
(Scheduled: 13 Dec 2024 - 18 Dec 2024)
0.1
Details
Share
Follow
2
Nexfibre Networks Limited logo
HORNBY ROAD 
(0.2 miles)
Nexfibre Networks Limited
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.2
Details
Share
Follow
3
Nexfibre Networks Limited logo
MARSHSIDE ROAD 
(0.2 miles)
Nexfibre Networks Limited
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 16 Dec 2024 13:30
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
0.2
Details
Share
Follow
4
BT logo
LYTHAM ROAD 
(0.2 miles)
BT
Utility repair and maintenance works - Footway, Carriageway - Give and take
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.2
Details
Share
Follow
5
Nexfibre Networks Limited logo
GARSTANG ROAD 
(0.2 miles)
Nexfibre Networks Limited
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.2
Details
Share
Follow
6
Nexfibre Networks Limited logo
COYFORD DRIVE 
(0.2 miles)
Nexfibre Networks Limited
Remedial works - Footway - Some carriageway incursion
Planned
Scheduled: 19 Dec 2024 - 20 Dec 2024
0.2
Details
Share
Follow
7
Nexfibre Networks Limited logo
GARSTANG ROAD 
(0.3 miles)
Nexfibre Networks Limited
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 10 Dec 2024 10:00
(Scheduled: 10 Dec 2024 - 23 Dec 2024)
0.3
Details
Share
Follow
8
BT logo
TOTNES DRIVE 
(0.3 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 18 Dec 2024 - 20 Dec 2024
0.3
Details
Share
Follow
9
BT logo
TOTNES DRIVE 
(0.3 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Cancelled
(Scheduled: 17 Dec 2024 - 19 Dec 2024)
0.3
Details
Share
10
BT logo
PRESTON NEW ROAD 
(0.3 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 17 Dec 2024 - 19 Dec 2024
0.3
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.