ROADWORKS SUMMARY
Westmoreland Road, SOUTHPORT, PR8 6NX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Westmoreland Road, PR8 6NX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Westmoreland Road, SOUTHPORT, PR8 6NX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Westmoreland Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Sefton Metropolitan Borough Council logo
LONG TERM
Between
28 Aug 2024 and 4 Jun 2025
Details
View Map
Share
Market Street

Sefton Metropolitan Borough Council were proposing to carry out Highway improvement works on Market Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2024 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Sep 2024 at 09:58.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
28 Aug 2024 and 4 Jun 2025
Details
View Map
Share
Eastbank Street

Sefton Metropolitan Borough Council were proposing to carry out Highway improvement works on Eastbank Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2024 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Sep 2024 at 09:59.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
28 Aug 2024 and 4 Jun 2025
Details
View Map
Share
King Street

Sefton Metropolitan Borough Council were proposing to carry out Highway improvement works on King Street, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 August 2024 and run through until 4 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Sep 2024 at 09:58.

Lancashire County Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Heathy Lane

Lancashire County Council are carrying out Highway repair and maintenance works on Heathy Lane, Downholland.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 October 2024 at 09:00 and could run through until 29 August 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

This roadwork event was last updated by Lancashire County Council on 15 Oct 2024 at 15:26.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Market Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Market Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 24 Oct 2024 at 15:29.

Sefton Metropolitan Borough Council logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Market Street

Sefton Metropolitan Borough Council are carrying out Highway improvement works on Market Street, Southport.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 15:47 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 21 Jan 2025 at 15:47.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
Eastbank Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Eastbank Street, Southport.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 24 Oct 2024 at 15:26.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
6 Jan and 6 Oct 2025
Details
View Map
Share
Follow
King Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on King Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 6 October 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 24 Oct 2024 at 15:27.

Sefton Metropolitan Borough Council logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
King Street

Sefton Metropolitan Borough Council are carrying out Highway improvement works on King Street, Southport.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 15:47 and could run through until 6 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 21 Jan 2025 at 15:47.

Sefton Metropolitan Borough Council logo
LONG TERM
Until
13 Oct 2025
Details
View Map
Share
Follow
Eastbank Street

Sefton Metropolitan Borough Council are carrying out Highway improvement works on Eastbank Street, Southport.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 15:47 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 21 Jan 2025 at 15:48.

ManWeb logo
LONG TERM
Between
27 Jan and 27 Apr 2025
Details
View Map
Share
Follow
Formby Bypass

ManWeb are proposing to carry out Utility repair and maintenance works on Formby Bypass, Formby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ManWeb on 17 Jan 2025 at 13:40.

ManWeb logo
LONG TERM
Between
27 Jan and 12 May 2025
Details
View Map
Share
Follow
Sandbrook Road

ManWeb are proposing to carry out Utility repair and maintenance works on Sandbrook Road, Ainsdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 12 May 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ManWeb on 11 Sep 2024 at 17:02.

ManWeb logo
LONG TERM
Between
27 Jan and 12 May 2025
Details
View Map
Share
Sandbrook Road

ManWeb were proposing to carry out Utility repair and maintenance works on Sandbrook Road, Ainsdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 12 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 16 Oct 2024 at 13:10.

ManWeb logo
LONG TERM
Between
30 Jan and 30 Apr 2025
Details
View Map
Share
Follow
Formby Bypass

ManWeb are proposing to carry out Utility repair and maintenance works on Formby Bypass, Formby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by ManWeb on 20 Jan 2025 at 14:43.

ManWeb logo
LONG TERM
Between
30 Jan and 30 Apr 2025
Details
View Map
Share
Formby Bypass

ManWeb were proposing to carry out Utility repair and maintenance works on Formby Bypass, Formby.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 30 Jan 2025 at 09:55.

ManWeb logo
LONG TERM
Between
30 Jan and 12 May 2025
Details
View Map
Share
Sandbrook Road

ManWeb were proposing to carry out Utility repair and maintenance works on Sandbrook Road, Ainsdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 January 2025 and run through until 12 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by ManWeb on 30 Jan 2025 at 09:51.

ManWeb logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Formby Bypass

ManWeb are carrying out Utility repair and maintenance works on Formby Bypass, Formby.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 13:12 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 10 Apr 2025 at 09:38.

ManWeb logo
LONG TERM
Until
12 May 2025
Details
View Map
Share
Follow
Sandbrook Road

ManWeb are carrying out Utility repair and maintenance works on Sandbrook Road, Ainsdale.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 13:12 and could run through until 12 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by ManWeb on 6 Feb 2025 at 13:21.

ManWeb logo
LONG TERM
Between
26 Feb and 24 Apr 2025
Details
View Map
Share
Benthams Way

ManWeb were proposing to carry out Utility repair and maintenance works on Benthams Way, Southport.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 February 2025 and run through until 24 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 16 Oct 2024 at 12:55.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
3 Mar and 5 Aug 2025
Details
View Map
Share
Follow
Sussex Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Sussex Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 7 Feb 2025 at 12:12.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
3 Mar and 5 Aug 2025
Details
View Map
Share
Follow
Sussex Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Sussex Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 6 Mar 2025 at 09:04.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
3 Mar and 5 Aug 2025
Details
View Map
Share
Follow
Peel Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Peel Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 7 Feb 2025 at 12:08.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
3 Mar and 5 Aug 2025
Details
View Map
Share
Follow
Peel Street

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Peel Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 6 Mar 2025 at 09:03.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 7 May 2025
Details
View Map
Share
Follow
Norwood Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Norwood Road, Southport.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 28 Feb 2025 at 15:10.

Sefton Metropolitan Borough Council logo
LONG TERM
Between
10 Mar and 4 Aug 2025
Details
View Map
Share
Follow
Norwood Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Norwood Road, Southport.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 6 Mar 2025 at 09:05.

ManWeb logo
LONG TERM
Between
16 Mar and 25 Apr 2025
Details
View Map
Share
Formby Bypass

ManWeb were proposing to carry out Utility repair and maintenance works on Formby Bypass, Formby.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 March 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Dec 2024 at 14:11.

ManWeb logo
LONG TERM
Between
16 Mar and 25 Apr 2025
Details
View Map
Share
Liverpool Road

ManWeb were proposing to carry out Utility repair and maintenance works on Liverpool Road, Ainsdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 March 2025 and run through until 25 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 10 Oct 2024 at 15:14.

Nexfibre Networks Limited logo
LONG TERM
Between
18 Mar and 30 Apr 2025
Details
View Map
Share
Marshside Road

Nexfibre Networks Limited were proposing to carry out Utility repair and maintenance works on Marshside Road, Southport.

These works were categorised as Major.

The works were originally planned to start 18 March 2025 and run through until 30 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 18 Feb 2025 at 12:01.

Cadent Gas logo
LONG TERM
Between
28 Mar and 1 May 2025
Details
View Map
Share
Follow
Lulworth Road

Cadent Gas are proposing to carry out Utility asset works on Lulworth Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 March 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Mar 2025 at 09:35.

ManWeb logo
LONG TERM
Between
31 Mar and 6 May 2025
Details
View Map
Share
Woodstock Drive

ManWeb were proposing to carry out Utility repair and maintenance works on Woodstock Drive, Birkdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 6 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Mar 2025 at 15:16.

ManWeb logo
LONG TERM
Between
31 Mar and 4 May 2025
Details
View Map
Share
Arundel Road

ManWeb were proposing to carry out Utility repair and maintenance works on Arundel Road, Birkdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 4 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 17 Mar 2025 at 15:18.

Cadent Gas logo
LONG TERM
Between
31 Mar and 5 May 2025
Details
View Map
Share
Follow
Lulworth Road

Cadent Gas are proposing to carry out Utility asset works on Lulworth Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 5 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:01.

The Environment Agency logo
LONG TERM
Between
1 Apr and 24 Jun 2025
Details
View Map
Share
Aveling Drive

The Environment Agency were proposing to carry out Section 50 on Aveling Drive, Banks.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 April 2025 and run through until 24 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by The Environment Agency on 28 Jan 2025 at 13:21.

ManWeb logo
LONG TERM
Between
4 Apr and 31 Jul 2025
Details
View Map
Share
Follow
Formby Bypass

ManWeb are proposing to carry out Utility repair and maintenance works on Formby Bypass, Formby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 April 2025 and could run through until 31 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 14 Jan 2025 at 08:00.

ManWeb logo
Between
7 and 28 Apr 2025
Details
View Map
Share
Segars Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Segars Lane, Ainsdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 28 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 8 Apr 2025 at 08:43.

Sefton Metropolitan Borough Council logo
Finishing
Tomorrow
Details
View Map
Share
Waterloo Road

Sefton Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Waterloo Road, Birkdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 18 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 17 Mar 2025 at 15:24.

Sefton Metropolitan Borough Council logo
Until
28 Apr 2025
Details
View Map
Share
Follow
Waterloo Road

Sefton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Waterloo Road, Birkdale.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 07:55 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 17 Apr 2025 at 10:33.

Cadent Gas logo
Between
7 and 29 Apr 2025
Details
View Map
Share
Follow
Mornington Road

Cadent Gas are proposing to carry out Utility asset works on Mornington Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:00.

Cadent Gas logo
Until
29 Apr 2025
Details
View Map
Share
Follow
Mornington Road

Cadent Gas are carrying out Utility asset works on Mornington Road, Southport.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 April 2025 at 08:05 and could run through until 29 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Apr 2025 at 11:24.

ManWeb logo
LONG TERM
Between
8 Apr and 4 Aug 2025
Details
View Map
Share
Follow
Formby Bypass

ManWeb are proposing to carry out Utility repair and maintenance works on Formby Bypass, Formby.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 April 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 15 Jan 2025 at 15:18.

Nexfibre Networks Limited logo
LONG TERM
Between
9 Apr and 23 May 2025
Details
View Map
Share
Garstang Road

Nexfibre Networks Limited were proposing to carry out Utility repair and maintenance works on Garstang Road, Southport.

These works were categorised as Major.

The works were originally planned to start 9 April 2025 and run through until 23 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Nexfibre Networks Limited on 18 Feb 2025 at 11:59.

Cadent Gas logo
Until
4 May 2025
Details
View Map
Share
Follow
Palatine Road

Cadent Gas are carrying out Utility asset works on Palatine Road, Birkdale.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 April 2025 at 10:50 and could run through until 4 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Apr 2025 at 11:33.

Cadent Gas logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
Brompton Road

Cadent Gas are proposing to carry out Utility asset works on Brompton Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:10.

Cadent Gas logo
Between
14 Apr and 2 May 2025
Details
View Map
Share
Follow
Hazel Grove

Cadent Gas are proposing to carry out Utility asset works on Hazel Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:28.

Cadent Gas logo
Until
2 May 2025
Details
View Map
Share
Follow
Hazel Grove

Cadent Gas are carrying out Utility asset works on Hazel Grove, Southport.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 07:50 and could run through until 2 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 14 Apr 2025 at 07:57.

Cadent Gas logo
Between
14 Apr and 14 May 2025
Details
View Map
Share
Follow
Ralphs Wifes Lane

Cadent Gas are proposing to carry out Utility asset works on Ralphs Wifes Lane, Banks.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 15:58.

Cadent Gas logo
Between
14 Apr and 14 May 2025
Details
View Map
Share
Follow
Ralphs Wifes Lane

Cadent Gas are proposing to carry out Utility asset works on Ralphs Wifes Lane, Banks.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 11:05.

Cadent Gas logo
Between
14 Apr and 6 May 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Banks.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 15:55.

Cadent Gas logo
Between
14 Apr and 6 May 2025
Details
View Map
Share
Follow
Church Road

Cadent Gas are proposing to carry out Utility asset works on Church Road, Banks.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 11:07.

Lancashire County Council logo
Between
20 and 27 Apr 2025
Details
View Map
Share
Follow
Southport New Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Southport New Road, Tarleton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 April 2025 and could run through until 27 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 17 Jan 2025 at 14:22.

ManWeb logo
LONG TERM
Between
21 Apr and 25 May 2025
Details
View Map
Share
Follow
Woodstock Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Woodstock Drive, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 22 Jan 2025 at 14:26.

ManWeb logo
LONG TERM
Between
21 Apr and 25 May 2025
Details
View Map
Share
Follow
Arundel Road

ManWeb are proposing to carry out Utility repair and maintenance works on Arundel Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 25 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 22 Jan 2025 at 14:25.

Sefton Metropolitan Borough Council logo
Between
21 Apr and 7 May 2025
Details
View Map
Share
Rotten Row

Sefton Metropolitan Borough Council were proposing to carry out Highway repair and maintenance works on Rotten Row, Southport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 7 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Mar 2025 at 13:43.

Cadent Gas logo
Between
21 Apr and 13 May 2025
Details
View Map
Share
Follow
Palatine Road

Cadent Gas are proposing to carry out Utility asset works on Palatine Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:06.

Cadent Gas logo
Between
21 Apr and 9 May 2025
Details
View Map
Share
Follow
Laburnum Grove

Cadent Gas are proposing to carry out Utility asset works on Laburnum Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:29.

Cadent Gas logo
Between
21 Apr and 9 May 2025
Details
View Map
Share
Follow
Laburnum Grove

Cadent Gas are proposing to carry out Utility asset works on Laburnum Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 9 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Apr 2025 at 07:43.

ManWeb logo
Between
24 Apr and 13 May 2025
Details
View Map
Share
Follow
Segars Lane

ManWeb are proposing to carry out Utility repair and maintenance works on Segars Lane, Ainsdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 13 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 15 Apr 2025 at 13:21.

Lancashire County Council logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Cut Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Cut Lane, Aughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Feb 2025 at 10:43.

Lancashire County Council logo
LONG TERM
Between
28 Apr and 28 May 2025
Details
View Map
Share
Follow
Cut Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Cut Lane, Aughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 28 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 25 Feb 2025 at 15:11.

Lancashire County Council logo
Between
28 Apr and 23 May 2025
Details
View Map
Share
Follow
Cut Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Cut Lane, Aughton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 23 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 25 Feb 2025 at 15:18.

ManWeb logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Segars Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Segars Lane, Ainsdale.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 12 Mar 2025 at 10:06.

ManWeb logo
LONG TERM
Between
28 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Trafalgar Road

ManWeb are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 22 Jan 2025 at 14:28.

ManWeb logo
LONG TERM
Between
28 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Trafalgar Road

ManWeb are proposing to carry out Utility repair and maintenance works on Trafalgar Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 23 Jan 2025 at 11:34.

ManWeb logo
LONG TERM
Between
28 Apr and 1 Jun 2025
Details
View Map
Share
Follow
Grosvenor Road

ManWeb are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 10 Mar 2025 at 11:09.

Cadent Gas logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Cypress Road

Cadent Gas are proposing to carry out Utility asset works on Cypress Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:12.

Cadent Gas logo
Between
28 Apr and 16 May 2025
Details
View Map
Share
Follow
Cypress Road

Cadent Gas are proposing to carry out Utility asset works on Cypress Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 09:51.

Cadent Gas logo
Between
29 Apr and 20 May 2025
Details
View Map
Share
Follow
Scarisbrick Street

Cadent Gas are proposing to carry out Utility asset works on Scarisbrick Street, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 24 Feb 2025 at 18:38.

Cadent Gas logo
Between
29 Apr and 20 May 2025
Details
View Map
Share
Follow
Scarisbrick Street

Cadent Gas are proposing to carry out Utility asset works on Scarisbrick Street, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 20 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 10:50.

Lancashire County Council logo
Between
5 and 14 May 2025
Details
View Map
Share
Follow
Gorsuch Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Gorsuch Lane, Scarisbrick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 14 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Feb 2025 at 11:19.

Cadent Gas logo
LONG TERM
Between
5 May and 6 Jun 2025
Details
View Map
Share
Follow
Kew Road

Cadent Gas are proposing to carry out Utility asset works on Kew Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:07.

Cadent Gas logo
LONG TERM
Between
5 May and 24 Jun 2025
Details
View Map
Share
Follow
Kew Road

Cadent Gas are proposing to carry out Utility asset works on Kew Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 14:45.

Cadent Gas logo
Between
5 and 30 May 2025
Details
View Map
Share
Follow
Hawkshead Street

Cadent Gas are proposing to carry out Utility asset works on Hawkshead Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:14.

Cadent Gas logo
Between
5 and 30 May 2025
Details
View Map
Share
Follow
Hawkshead Street

Cadent Gas are proposing to carry out Utility asset works on Hawkshead Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 14:16.

Cadent Gas logo
LONG TERM
Between
5 May and 6 Jun 2025
Details
View Map
Share
Follow
Manning Road

Cadent Gas are proposing to carry out Utility asset works on Manning Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:31.

Cadent Gas logo
LONG TERM
Between
5 May and 6 Jun 2025
Details
View Map
Share
Follow
Manning Road

Cadent Gas are proposing to carry out Utility asset works on Manning Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 14:19.

ManWeb logo
Between
6 May and 2 Jun 2025
Details
View Map
Share
Meadow Lane

ManWeb were proposing to carry out Utility repair and maintenance works on Meadow Lane, Ainsdale.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 2 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 6 Dec 2024 at 08:51.

BT logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Victoria Bridge Road

BT are proposing to carry out Utility asset works on Victoria Bridge Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by BT on 27 Feb 2025 at 17:25.

BT logo
Between
7 and 9 May 2025
Details
View Map
Share
Follow
Victoria Bridge Road

BT are proposing to carry out Utility asset works on Victoria Bridge Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 9 May 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by BT on 17 Apr 2025 at 10:31.

ManWeb logo
Between
12 May and 1 Jun 2025
Details
View Map
Share
Follow
Grosvenor Road

ManWeb are proposing to carry out Utility repair and maintenance works on Grosvenor Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 1 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 22 Jan 2025 at 14:30.

Cadent Gas logo
Between
12 and 30 May 2025
Details
View Map
Share
Follow
Lansdowne Road

Cadent Gas are proposing to carry out Utility asset works on Lansdowne Road, Southport.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:30.

Lancashire County Council logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Wanishar Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Wanishar Lane, Downholland.

These works are categorised as Major.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 8 Apr 2025 at 11:42.

Lancashire County Council logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Southport Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Southport Road, Downholland.

These works are categorised as Major.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 11 Apr 2025 at 15:54.

Lancashire County Council logo
Between
19 May and 9 Jun 2025
Details
View Map
Share
Follow
Halsall Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Halsall Road, Halsall.

These works are categorised as Major.

The works will start on or after 19 May 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 7 Apr 2025 at 10:57.

Lancashire County Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Gorsuch Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Gorsuch Lane, Scarisbrick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 14 Mar 2025 at 09:48.

Cadent Gas logo
LONG TERM
Between
19 May and 23 Jun 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 10:24.

Cadent Gas logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
Eastbourne Road

Cadent Gas are proposing to carry out Utility asset works on Eastbourne Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Dec 2024 at 14:08.

Cadent Gas logo
Between
26 May and 23 Jun 2025
Details
View Map
Share
Follow
Banks Road

Cadent Gas are proposing to carry out Utility asset works on Banks Road, Banks.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 10:54.

Cadent Gas logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Southbank Road

Cadent Gas are proposing to carry out New service connection on Southbank Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Feb 2025 at 16:35.

Cadent Gas logo
Between
27 and 30 May 2025
Details
View Map
Share
Follow
Southbank Road

Cadent Gas are proposing to carry out New service connection on Southbank Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Mar 2025 at 11:18.

ManWeb logo
LONG TERM
Between
5 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Woodstock Drive

ManWeb are proposing to carry out Utility repair and maintenance works on Woodstock Drive, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 21 Mar 2025 at 12:19.

ManWeb logo
LONG TERM
Between
5 Jun and 8 Jul 2025
Details
View Map
Share
Follow
Arundel Road

ManWeb are proposing to carry out Utility repair and maintenance works on Arundel Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 8 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by ManWeb on 21 Mar 2025 at 12:19.

BT logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Castle Walk

BT are proposing to carry out Utility asset works on Castle Walk, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Mar 2025 at 16:36.

Sefton Metropolitan Borough Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Claremont Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Claremont Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 9 Mar 2025 at 13:43.

Sefton Metropolitan Borough Council logo
Between
23 and 27 Jun 2025
Details
View Map
Share
Follow
Preston Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Preston Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 11 Mar 2025 at 10:53.

Sefton Metropolitan Borough Council logo
Between
25 Jun and 1 Jul 2025
Details
View Map
Share
Follow
St Peters Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on St Peters Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 1 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 6 Mar 2025 at 16:02.

Lancashire County Council logo
Between
27 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Charnleys Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Charnleys Lane, Banks.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 31 Mar 2025 at 14:48.

Cadent Gas logo
Between
30 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Shaws Road

Cadent Gas are proposing to carry out Utility asset works on Shaws Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 14:53.

Cadent Gas logo
Between
30 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Shaws Road

Cadent Gas are proposing to carry out Utility asset works on Shaws Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 14 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 14:21.

Cadent Gas logo
Between
30 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Shaftesbury Road

Cadent Gas are proposing to carry out Utility asset works on Shaftesbury Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Mar 2025 at 14:50.

Cadent Gas logo
Between
30 Jun and 28 Jul 2025
Details
View Map
Share
Follow
Shaftesbury Road

Cadent Gas are proposing to carry out Utility asset works on Shaftesbury Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 14:22.

Sefton Metropolitan Borough Council logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Claremont Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Claremont Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 11 Mar 2025 at 10:36.

Sefton Metropolitan Borough Council logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Rotten Row

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Rotten Row, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 27 Mar 2025 at 16:29.

Sefton Metropolitan Borough Council logo
Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Rotten Row

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Rotten Row, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 31 Mar 2025 at 14:21.

Sefton Metropolitan Borough Council logo
Between
2 and 8 Jul 2025
Details
View Map
Share
Follow
St Peters Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on St Peters Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 11 Mar 2025 at 10:57.

United Utilities Water (formerly North West Water) logo
Between
2 and 4 Jul 2025
Details
View Map
Share
Follow
Palm Grove

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Palm Grove, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 4 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Apr 2025 at 15:24.

Sefton Metropolitan Borough Council logo
Between
2 and 8 Jul 2025
Details
View Map
Share
Follow
Preston Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Preston Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 July 2025 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 6 Mar 2025 at 15:41.

Cadent Gas logo
Between
7 and 22 Jul 2025
Details
View Map
Share
Follow
Grantham Road

Cadent Gas are proposing to carry out Utility asset works on Grantham Road, Birkdale.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 22 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Apr 2025 at 14:23.

Sefton Metropolitan Borough Council logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Cypress Road

Sefton Metropolitan Borough Council are proposing to carry out Highway improvement works on Cypress Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Sefton Metropolitan Borough Council on 7 Mar 2025 at 09:54.

Cadent Gas logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Marshside Road

Cadent Gas are proposing to carry out Utility asset works on Marshside Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:00.

Cadent Gas logo
Between
7 and 18 Jul 2025
Details
View Map
Share
Follow
Fylde Road

Cadent Gas are proposing to carry out Utility asset works on Fylde Road, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 18 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 3 Apr 2025 at 10:30.

Cadent Gas logo
Between
14 and 28 Jul 2025
Details
View Map
Share
Follow
Shaws Road

Cadent Gas are proposing to carry out Utility asset works on Shaws Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 28 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 09:11.

Cadent Gas logo
Between
14 Jul and 11 Aug 2025
Details
View Map
Share
Follow
Shaftesbury Road

Cadent Gas are proposing to carry out Utility asset works on Shaftesbury Road, Birkdale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 11 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 09:12.

Cadent Gas logo
Between
14 Jul and 4 Aug 2025
Details
View Map
Share
Follow
Ash Street

Cadent Gas are proposing to carry out Utility asset works on Ash Street, Southport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 4 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Apr 2025 at 08:30.


Roadworks Map near to Westmoreland Road, SOUTHPORT, PR8 6NX (100 Events)

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Apr 2025 10:35
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Westmoreland Road, SOUTHPORT, PR8 6NX (100 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Sefton Metropolitan Borough Council logo
PORTLAND STREET 
(0.2 miles)
Sefton Metropolitan Borough Council
Works for road purposes - Footway - Some carriageway incursion
In Progress
Since: 16 Apr 2025 13:00
(Scheduled: 16 Apr 2025 - 22 Apr 2025)
0.2
Details
Share
Follow
2
ManWeb logo
EVERARD ROAD 
(0.2 miles)
ManWeb
Utility repair and maintenance works - Footway, Carriageway - Priority working
Cancelled
(Scheduled: 16 Apr 2025 - 22 Apr 2025)
0.2
Details
Share
3
BT logo
SEFTON STREET 
(0.3 miles)
BT
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 17 Apr 2025 09:40
(Scheduled: 17 Apr 2025 - 23 Apr 2025)
0.3
Details
Share
Follow
4
BT logo
TOWN LANE 
(0.3 miles)
BT
Utility repair and maintenance works - Footway - Multi-way signals
Planned
Scheduled: 17 Apr 2025 - 22 Apr 2025
0.3
Details
Share
Follow
5
Sefton Metropolitan Borough Council logo
VIRGINIA STREET 
(0.3 miles)
Sefton Metropolitan Borough Council
Highway repair and maintenance works - Carriageway - Multi-way signals
In Progress
Since: 17 Apr 2025 06:59
(Scheduled: 17 Apr 2025)
0.3
Details
Share
Follow
6
United Utilities Water (formerly North West Water) logo
EVERARD ROAD 
(0.3 miles)
United Utilities Water (formerly North West Water)
Disconnection or alteration of supply - Footway - Some carriageway incursion
Planned
Scheduled: 17 Apr 2025 - 23 Apr 2025
0.3
Details
Share
Follow
7
United Utilities Water (formerly North West Water) logo
EVERARD ROAD 
(0.3 miles)
United Utilities Water (formerly North West Water)
Disconnection or alteration of supply - Footway - Some carriageway incursion
Planned
Scheduled: 17 Apr 2025 - 23 Apr 2025
0.3
Details
Share
Follow
8
BT logo
CEMETERY ROAD 
(0.4 miles)
BT
Utility asset works - Footway - Two-way signals
Cancelled
(Scheduled: 15 Apr 2025 - 17 Apr 2025)
0.4
Details
Share
9
BT logo
JANES BROOK ROAD 
(0.4 miles)
BT
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 17 Apr 2025 - 22 Apr 2025
0.4
Details
Share
Follow
10
ManWeb logo
HAIG AVENUE 
(0.4 miles)
ManWeb
Utility repair and maintenance works - Footway, Carriageway - Priority working