ROADWORKS SUMMARY
Back Lane, CHORLEY, PR6 9HB

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Back Lane, PR6 9HB and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Back Lane, CHORLEY, PR6 9HB

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Back Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Until
31 Dec 2027
Details
View Map
Share
Follow
Bolton Road

Lancashire County Council are carrying out Highway repair and maintenance works on Bolton Road, Withnell.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 28 July 2023 at 13:00 and could run through until 31 December 2027. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 12 May 2026 at 11:35.

Network Rail logo
LONG TERM
Until
1 Nov 2026
Details
View Map
Share
Follow
Friday Street

Network Rail are carrying out Works for Rail Purposes on Friday Street, Chorley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 9 March 2026 at 08:00 and could run through until 1 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 9 Mar 2026 at 08:46.

Lancashire County Council logo
LONG TERM
Between
9 Mar and 1 Nov 2026
Details
View Map
Share
Follow
Friday Street

Lancashire County Council are proposing to carry out Highway improvement works on Friday Street, Chorley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 March 2026 and could run through until 1 November 2026. The works will impact the carriageway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 27 Nov 2025 at 15:13.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Roundmoor Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Roundmoor Road, Standish.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:00 and could run through until 4 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Jul 2026 at 14:10.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
4 Oct 2026
Details
View Map
Share
Follow
Pilgrims Way

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Pilgrims Way, Standish.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:00 and could run through until 4 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Jul 2026 at 14:10.

Wigan Metropolitan Borough Council logo
LONG TERM
Until
14 Oct 2026
Details
View Map
Share
Follow
Wigan Road

Wigan Metropolitan Borough Council are carrying out Highway improvement works on Wigan Road, Standish.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 27 July 2026 at 09:00 and could run through until 14 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 27 Jul 2026 at 14:11.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Chorley Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Chorley Road, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 15:31.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Haigh Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Haigh Road, Aspull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:09.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Pepper Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pepper Lane, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:08.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Pepper Lane

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Pepper Lane, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 16:08.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Preston Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Preston Road, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 15:36.

Wigan Metropolitan Borough Council logo
LONG TERM
Between
3 Aug and 31 Dec 2026
Details
View Map
Share
Follow
Preston Road

Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Preston Road, Standish.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 August 2026 and could run through until 31 December 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wigan Metropolitan Borough Council on 15 Jun 2026 at 15:31.

Electricity North West (NorWeb) logo
Finishing
Today
Details
View Map
Share
Follow
Shepherds Way

Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Shepherds Way, Chorley.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2026 at 10:15 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 14 Sep 2026 at 10:47.

Lancashire County Council logo
Until
2 Oct 2026
Details
View Map
Share
Follow
Chorley Road

Lancashire County Council are carrying out Highway repair and maintenance works on Chorley Road, Adlington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 2 October 2026. The works will impact the footway, carriageway and footpath.

This roadwork event was last updated by Lancashire County Council on 7 Sep 2026 at 09:32.

Electricity North West (NorWeb) logo
Finishing
Wednesday
Details
View Map
Share
Follow
Harpers Lane

Electricity North West (NorWeb) are carrying out Utility repair and maintenance works on Harpers Lane, Chorley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 September 2026 at 12:15 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Sep 2026 at 09:05.

Blackburn With Darwen Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Crookfield Road

Blackburn With Darwen Borough Council are proposing to carry out Highway repair and maintenance works on Crookfield Road, Tockholes, Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 14 Aug 2026 at 13:25.

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
18 Dec 2026
Details
View Map
Share
Follow
Coppull Road

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Coppull Road, Chorley.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 12:10 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Sep 2026 at 13:29.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
Coppull Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Coppull Road, Chorley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2026 at 11:00.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
Coppull Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Coppull Road, Chorley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Sep 2026 at 10:42.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
Coppull Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Coppull Road, Chorley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Aug 2026 at 16:27.

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
18 Dec 2026
Details
View Map
Share
Follow
New Road

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on New Road, Coppull.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 September 2026 at 11:00 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Sep 2026 at 11:12.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
New Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on New Road, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Sep 2026 at 10:57.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
New Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on New Road, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Sep 2026 at 10:42.

United Utilities Water (formerly North West Water) logo
LONG TERM
Between
14 Sep and 18 Dec 2026
Details
View Map
Share
Follow
New Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on New Road, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 September 2026 and could run through until 18 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Aug 2026 at 16:26.

Blackburn With Darwen Borough Council logo
Finishing
Today
Details
View Map
Share
Follow
Tockholes Road

Blackburn With Darwen Borough Council are proposing to carry out Highway repair and maintenance works on Tockholes Road, Tockholes, Darwen.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 18 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 14 Aug 2026 at 13:26.

Lancashire County Council logo
LONG TERM
Between
15 Sep 2026 and 15 Mar 2027
Details
View Map
Share
Follow
Avondale Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Avondale Road, Chorley.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2026 and could run through until 15 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 15 Sep 2026 at 12:54.

Lancashire County Council logo
LONG TERM
Until
15 Mar 2027
Details
View Map
Share
Follow
Avondale Road

Lancashire County Council are carrying out Highway repair and maintenance works on Avondale Road, Chorley.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 12:55 and could run through until 15 March 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 15 Sep 2026 at 12:55.

Bolton Metropolitan Borough Council logo
Until
1 Oct 2026
Details
View Map
Share
Follow
Vicarage Road West

Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Vicarage Road West, Blackrod, Bolton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 08:00 and could run through until 1 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Bolton Metropolitan Borough Council on 16 Sep 2026 at 08:11.

United Utilities Water (formerly North West Water) logo
Finishing
Tuesday
Details
View Map
Share
Follow
Withnell Fold

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Withnell Fold, Withnell.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 02:09 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Sep 2026 at 10:48.

Lancashire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Sheep House Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Sheep House Lane, Rivington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 September 2026 and could run through until 23 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 8 Sep 2026 at 11:40.

Lancashire County Council logo
Between
21 and 25 Sep 2026
Details
View Map
Share
Follow
Sheep House Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Sheep House Lane, Rivington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 25 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 7 Jul 2026 at 11:02.

United Utilities Water (formerly North West Water) logo
Between
21 Sep and 9 Oct 2026
Details
View Map
Share
Follow
Dickens Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Dickens Road, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 9 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Sep 2026 at 09:14.

Lancashire County Council logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Long Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Long Lane, Heath Charnock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 9 Jul 2026 at 09:20.

Lancashire County Council logo
Between
24 and 28 Sep 2026
Details
View Map
Share
Follow
Weavers Brow

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Weavers Brow, Heath Charnock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2026 and could run through until 28 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 9 Jul 2026 at 09:21.

Lancashire County Council logo
Between
29 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Southport Road

Lancashire County Council are proposing to carry out Highway improvement works on Southport Road, Euxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Aug 2026 at 12:48.

Lancashire County Council logo
Between
29 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Southport Road

Lancashire County Council are proposing to carry out Highway improvement works on Southport Road, Chorley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Aug 2026 at 12:44.

Cadent Gas logo
Between
5 and 25 Oct 2026
Details
View Map
Share
Follow
Spendmore Lane

Cadent Gas are proposing to carry out Utility asset works on Spendmore Lane, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 25 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 09:33.

Lancashire County Council logo
LONG TERM
Between
5 Oct and 11 Dec 2026
Details
View Map
Share
Follow
Pear Tree Lane

Lancashire County Council are proposing to carry out Section 50 on Pear Tree Lane, Euxton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 11 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 15 Jul 2026 at 11:19.

United Utilities Water (formerly North West Water) logo
Between
19 Oct and 6 Nov 2026
Details
View Map
Share
Follow
Regent Street

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Regent Street, Coppull.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 30 Jul 2026 at 13:14.

United Utilities Water (formerly North West Water) logo
Between
26 Oct and 20 Nov 2026
Details
View Map
Share
Follow
Mill Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Mill Lane, Heskin, Charnock Richard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 May 2026 at 12:41.

Cadent Gas logo
LONG TERM
Between
13 Nov 2026 and 10 Feb 2027
Details
View Map
Share
Follow
Preston Road

Cadent Gas are proposing to carry out Utility asset works on Preston Road, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 November 2026 and could run through until 10 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 21 Aug 2026 at 13:39.

Cadent Gas logo
LONG TERM
Between
16 Nov 2026 and 11 Feb 2027
Details
View Map
Share
Follow
Preston Road

Cadent Gas are proposing to carry out Utility asset works on Preston Road, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 November 2026 and could run through until 11 February 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2026 at 09:33.

Electricity North West (NorWeb) logo
Between
23 and 30 Nov 2026
Details
View Map
Share
Deerfold

Electricity North West (NorWeb) were proposing to carry out Utility asset works on Deerfold, Astley Village.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 November 2026 and run through until 30 November 2026. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 9 Sep 2026 at 15:54.

Electricity North West (NorWeb) logo
Between
23 and 30 Nov 2026
Details
View Map
Share
Follow
Deerfold

Electricity North West (NorWeb) are proposing to carry out Utility asset works on Deerfold, Astley Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Sep 2026 at 12:47.

Electricity North West (NorWeb) logo
Between
23 and 30 Nov 2026
Details
View Map
Share
Follow
Deerfold

Electricity North West (NorWeb) are proposing to carry out Utility asset works on Deerfold, Astley Village.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 30 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 18 Sep 2026 at 14:58.

United Utilities Water (formerly North West Water) logo
Between
23 and 25 Nov 2026
Details
View Map
Share
Follow
Georges Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Georges Lane, Horwich, Bolton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 25 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Aug 2026 at 08:38.

Cadent Gas logo
Between
23 Nov and 16 Dec 2026
Details
View Map
Share
Follow
Spendmore Lane

Cadent Gas are proposing to carry out Utility asset works on Spendmore Lane, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 16 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Aug 2026 at 15:46.

Cadent Gas logo
Between
30 Nov and 18 Dec 2026
Details
View Map
Share
Follow
Princess Way

Cadent Gas are proposing to carry out Utility asset works on Princess Way, Euxton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 18 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 23 Jul 2026 at 11:09.

Cadent Gas logo
LONG TERM
Between
2 Dec 2026 and 22 Jan 2027
Details
View Map
Share
Follow
Spendmore Lane

Cadent Gas are proposing to carry out Utility asset works on Spendmore Lane, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 08:46.

Cadent Gas logo
Between
2 and 22 Dec 2026
Details
View Map
Share
Follow
Chapel Street

Cadent Gas are proposing to carry out Utility asset works on Chapel Street, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2026 and could run through until 22 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 08:47.

Cadent Gas logo
LONG TERM
Between
3 Dec 2026 and 25 Jan 2027
Details
View Map
Share
Follow
Spendmore Lane

Cadent Gas are proposing to carry out Utility asset works on Spendmore Lane, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 25 January 2027. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 11:00.

Cadent Gas logo
Between
3 and 23 Dec 2026
Details
View Map
Share
Follow
Chapel Street

Cadent Gas are proposing to carry out Utility asset works on Chapel Street, Coppull.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2026 and could run through until 23 December 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Sep 2026 at 11:00.


Roadworks Map near to Back Lane, CHORLEY, PR6 9HB

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Sep 2026 23:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Back Lane, CHORLEY, PR6 9HB (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Lancashire County Council logo
MAJOR
  
LONG LANE 
(0.6 miles)
Lancashire County Council
Works for road purposes - Verge - Some carriageway incursion
Planned
Scheduled: 1 Jan 2026 - 1 Jan 2027
0.6
Details
Share
Follow
2
Lancashire County Council logo
MAJOR
  
SHEEP HOUSE LANE 
(1.0 miles)
Lancashire County Council
Highway repair and maintenance works - Carriageway - Road closure
Planned
Scheduled: 18 Sep 2026 - 23 Sep 2026
1.0
Details
Share
Follow