ROADWORKS SUMMARY
Moss Close, CHORLEY, PR6 0TU
Introduction
![Image of petrol pumps](https://streetguide.co.uk/assets/intro-image/roadworks/image1.jpg)
View current and future planned roadworks and road closures for Moss Close, PR6 0TU and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Moss Close, CHORLEY, PR6 0TU
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Moss Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Lancashire County Council are carrying out Highway repair and maintenance works on Bolton Road, Withnell.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 July 2023 at 13:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 4 Jul 2024 at 12:16.
30 May 2025
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Moor Road, Anglezarke.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 08:45 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Dec 2024 at 09:09.
2 Jan and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Southport Road, Ulnes Walton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:27.
6 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:53.
6 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:22.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lydiate Lane, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:08.
24 Mar 2025
Cadent Gas are carrying out Utility asset works on Southport Road, Ulnes Walton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 09:00 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Jan 2025 at 15:49.
6 Jan and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Southport Road, Ulnes Walton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:04.
Friday
Cadent Gas are carrying out Utility asset works on Crown Lane, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 January 2025 at 14:30 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 12:23.
21 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lydiate Lane, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 08:46.
22 Jan and 25 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:34.
25 Jan and 25 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Moor Road, Anglezarke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Oct 2024 at 12:56.
27 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 10:23.
27 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:15.
Friday
Cadent Gas are carrying out Utility asset works on James Street, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 January 2025 at 08:40 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 11:27.
1 Feb and 7 Mar 2025
Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Preston Road, Chorley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Oct 2024 at 16:22.
14 Mar 2025
Lancashire County Council are carrying out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 09:00 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 3 Feb 2025 at 10:32.
28 Feb 2025
Lancashire County Council are carrying out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 09:00 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 3 Feb 2025 at 10:33.
14 Mar 2025
Lancashire County Council are carrying out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 09:00 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 3 Feb 2025 at 10:32.
14 Mar 2025
Lancashire County Council are carrying out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 February 2025 at 09:00 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 3 Feb 2025 at 10:31.
24 Feb 2025
Cadent Gas are carrying out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 February 2025 at 08:00 and could run through until 24 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Feb 2025 at 08:40.
10 Feb and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Lydiate Lane, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:36.
Wednesday
Lancashire County Council were proposing to carry out Highway improvement works on Denford Avenue, Leyland.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 7 Nov 2024 at 14:25.
13 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Withnell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:31.
13 Feb and 24 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:38.
24 Apr 2025
Cadent Gas are carrying out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 February 2025 at 08:00 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 13 Feb 2025 at 09:16.
Friday
Network Rail are proposing to carry out Works for Rail Purposes on Friday Street, Chorley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Nov 2024 at 10:58.
Friday
Network Rail were proposing to carry out Works for Rail Purposes on Friday Street, Chorley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Jan 2025 at 10:05.
Friday
Network Rail are proposing to carry out Works for Rail Purposes on Steeley Lane, Chorley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Nov 2024 at 10:40.
Friday
Network Rail were proposing to carry out Works for Rail Purposes on Steeley Lane, Chorley.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Jan 2025 at 10:04.
17 Feb and 12 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 12 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 23 Jan 2025 at 12:28.
17 Feb and 7 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 14:07.
Thursday
Cadent Gas are proposing to carry out New service connection on Pear Tree Lane, Euxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 3 Dec 2024 at 16:24.
Friday
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Babylon Lane, Adlington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 11:07.
Friday
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Babylon Lane, Adlington.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 9 Dec 2024 at 13:40.
Saturday
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Nov 2024 at 12:02.
Saturday
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Feb 2025 at 14:55.
Saturday
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 22 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Nov 2024 at 14:20.
18 Feb and 10 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Park Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 27 Nov 2024 at 14:25.
19 Feb and 11 Mar 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Park Road, Chorley.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 11 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 28 Nov 2024 at 09:18.
24 Feb and 21 Mar 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:02.
24 Feb and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Springfield Road, Leyland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:23.
24 Feb and 4 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:10.
24 Feb and 4 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:51.
24 Feb and 4 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:29.
24 and 26 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Town Lane, Heskin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 11:48.
26 Feb and 4 Mar 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Church Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 5 Dec 2024 at 13:49.
3 and 5 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Town Lane, Whittle-le-woods.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 11:52.
3 and 5 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Town Lane, Whittle-le-woods.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Feb 2025 at 09:18.
3 and 26 Mar 2025
Cadent Gas were proposing to carry out Utility asset works on Vicarage Road, Blackrod, Bolton.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 March 2025 and run through until 26 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Sep 2024 at 12:28.
10 and 14 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Washington Lane, Euxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Dec 2024 at 12:50.
10 and 14 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Pear Tree Lane, Euxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Dec 2024 at 12:49.
17 Mar and 23 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:17.
17 Mar and 23 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:36.
17 Mar and 23 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:33.
17 Mar and 23 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:20.
31 Mar and 25 Apr 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Castle Crescent, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Feb 2025 at 09:10.
31 Mar and 25 Apr 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Singleton Avenue, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Feb 2025 at 11:26.
31 Mar and 25 Apr 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Castle Crescent, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Feb 2025 at 11:25.
31 Mar and 25 Apr 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ormston Avenue, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Feb 2025 at 11:26.
31 Mar and 25 Apr 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Ormston Avenue, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Feb 2025 at 09:11.
31 Mar and 25 Apr 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Singleton Avenue, Horwich, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 13 Feb 2025 at 09:11.
4 Apr and 2 Sep 2025
Wigan Metropolitan Borough Council are proposing to carry out Section 50 on Rectory Lane, Standish.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 April 2025 and could run through until 2 September 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 4 Feb 2025 at 11:34.
7 Apr and 6 May 2025
Cadent Gas are proposing to carry out Utility asset works on Chorley Old Road, Whittle-le-woods.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 6 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 21 Jan 2025 at 09:22.
7 Apr and 16 May 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on New Street, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Aug 2024 at 14:27.
7 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 12:42.
7 Apr and 16 May 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Aug 2024 at 14:25.
7 Apr and 16 May 2025
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Blackhorse Street, Blackrod, Bolton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Aug 2024 at 14:25.
7 Apr and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Lydiate Lane, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Jan 2025 at 08:30.
7 Apr and 2 May 2025
Cadent Gas are proposing to carry out Utility asset works on Lydiate Lane, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 2 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Jan 2025 at 12:32.
7 and 25 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 April 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Jan 2025 at 10:20.
9 and 15 Apr 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadfield Drive, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 15 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 31 Jan 2025 at 12:57.
14 Apr and 12 May 2025
Cadent Gas are proposing to carry out Utility asset works on Vicarage Road, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 12 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Jan 2025 at 10:32.
15 and 23 Apr 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Town Lane, Whittle-le-woods.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2025 and could run through until 23 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 5 Feb 2025 at 11:13.
16 Apr and 7 May 2025
Cadent Gas are proposing to carry out Utility asset works on Waterhouse Green, Whittle-le-woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 April 2025 and could run through until 7 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Jan 2025 at 10:37.
21 Apr and 27 May 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Park Hall Road, Charnock Richard.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 27 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 11 Feb 2025 at 12:29.
21 Apr and 27 May 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Park Hall Road, Charnock Richard.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 27 May 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Feb 2025 at 11:02.
29 Apr and 12 May 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on German Lane, Charnock Richard.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2025 and could run through until 12 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 7 Feb 2025 at 15:52.
2 and 9 May 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadfield Drive, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 May 2025 and could run through until 9 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 11 Feb 2025 at 11:45.
4 and 16 May 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mellor Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 4 Feb 2025 at 12:11.
4 and 16 May 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Western Drive, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 5 Feb 2025 at 11:59.
4 and 16 May 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Hoghton Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 4 Feb 2025 at 15:15.
5 and 13 May 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Preston Road, Chorley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 13 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 4 Feb 2025 at 11:05.
5 and 21 May 2025
Cadent Gas are proposing to carry out Utility asset works on Wigan Road, Euxton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 12:32.
5 and 19 May 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Grange Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 5 Feb 2025 at 10:34.
5 and 19 May 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Fairhaven Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 19 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 5 Feb 2025 at 10:01.
5 and 21 May 2025
Cadent Gas are proposing to carry out Utility asset works on Park Avenue, Euxton.
These works are categorised as Major.
The works will start on or after 5 May 2025 and could run through until 21 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 6 Feb 2025 at 11:00.
5 May and 11 Jun 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Kirkham Close, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 11 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 5 Feb 2025 at 09:00.
5 May and 18 Jun 2025
Cadent Gas are proposing to carry out Utility asset works on Balshaw Lane, Euxton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 5 May 2025 and could run through until 18 June 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 10 Feb 2025 at 12:33.
13 and 20 May 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Willow Tree Crescent, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2025 and could run through until 20 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 17 Feb 2025 at 09:15.
Roadworks Map near to Moss Close, CHORLEY, PR6 0TU
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Moss Close, CHORLEY, PR6 0TU (24 Events)