ROADWORKS SUMMARY
Buckingham Street, CHORLEY, PR6 0HD
Introduction
View current and future planned roadworks and road closures for Buckingham Street, PR6 0HD and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Buckingham Street, CHORLEY, PR6 0HD
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Buckingham Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Lancashire County Council are carrying out Highway repair and maintenance works on Bolton Road, Withnell.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 July 2023 at 13:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 4 Jul 2024 at 12:16.
14 Oct 2024 and 15 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 15 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 16 Jul 2024 at 07:50.
Tomorrow
Cadent Gas are carrying out Utility asset works on Station Road, Blackrod, Bolton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 29 October 2024 at 07:50 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Oct 2024 at 07:52.
Friday
Bolton Metropolitan Borough Council are carrying out Highway repair and maintenance works on Church Street, Horwich, Bolton.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 30 October 2024 at 08:00 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 30 Oct 2024 at 08:31.
Friday
Bolton Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Church Street, Horwich, Bolton.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 October 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Bolton Metropolitan Borough Council on 22 Oct 2024 at 12:59.
Tomorrow
Cadent Gas are proposing to carry out Utility asset works on Springfield Road, Leyland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 October 2024 and could run through until 28 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Sep 2024 at 10:43.
4 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on Pepper Lane, Standish.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Aug 2024 at 10:53.
9 Dec 2024
Cadent Gas are carrying out Utility asset works on Pepper Lane, Standish.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 09:00 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 4 Nov 2024 at 09:16.
6 Nov 2024 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:03.
Friday
United Utilities Water (formerly North West Water) are carrying out Utility asset works on Green Lane, Standish.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 10:30 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Nov 2024 at 10:35.
11 Nov and 9 Dec 2024
Cadent Gas are proposing to carry out Utility asset works on School Lane, Leyland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 09:51.
Friday
Cadent Gas are proposing to carry out Utility asset works on Chatsworth Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Aug 2024 at 14:08.
7 Feb 2025
Cadent Gas are carrying out Utility asset works on Manchester Road, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 08:00 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 08:51.
13 Dec 2024
Cadent Gas are carrying out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 11:50 and could run through until 13 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Nov 2024 at 11:57.
14 Nov and 18 Dec 2024
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 Sep 2024 at 12:00.
Tomorrow
Electricity North West (NorWeb) were proposing to carry out New service connection on Heald House Road, Leyland.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 November 2024 and run through until 28 November 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 4 Sep 2024 at 11:38.
22 Jan 2025
Cadent Gas are carrying out Utility asset works on Lydiate Lane, Eccleston.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 08:00 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 09:17.
Friday
Electricity North West (NorWeb) are proposing to carry out New service connection on Heald House Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 6 Sep 2024 at 11:12.
2 Dec 2024 and 30 May 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Moor Road, Anglezarke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 8 Nov 2024 at 12:26.
2 and 22 Dec 2024
Cadent Gas were proposing to carry out Utility asset works on Blackrod Footpath 24, Blackrod.
These works were categorised as Major.
The works were originally planned to start 2 December 2024 and run through until 22 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 14:01.
9 and 11 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Chorley Lane, Charnock Richard.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 19 Oct 2024 at 16:25.
9 and 11 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Chorley Lane, Charnock Richard.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Nov 2024 at 11:55.
9 and 11 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Chorley Lane, Charnock Richard.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Oct 2024 at 10:51.
13 Dec 2024 and 21 Jan 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 7 Oct 2024 at 15:04.
16 and 18 Dec 2024
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Chorley Lane, Charnock Richard.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 24 Sep 2024 at 11:10.
19 Dec 2024 and 20 Jan 2025
Electricity North West (NorWeb) are proposing to carry out Utility repair and maintenance works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 2 Oct 2024 at 11:48.
19 Dec 2024 and 13 Jan 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Park Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 7 Oct 2024 at 15:32.
31 Dec 2024 and 4 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 December 2024 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Oct 2024 at 13:14.
31 Dec 2024 and 21 Jan 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Park Road, Chorley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 December 2024 and run through until 21 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Oct 2024 at 11:25.
31 Dec 2024 and 21 Jan 2025
Electricity North West (NorWeb) were proposing to carry out Diversionary works on Park Road, Chorley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 December 2024 and run through until 21 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 8 Nov 2024 at 08:45.
2 and 30 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Southport Road, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:29.
2 and 21 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on New Lane, Eccleston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:32.
2 and 16 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Leyland Lane, Ulnes Walton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 16 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:29.
2 Jan and 20 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Southport Road, Ulnes Walton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 20 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:27.
5 and 7 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Leyland Lane, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 January 2025 and could run through until 7 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 5 Nov 2024 at 12:42.
6 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:22.
6 Jan and 3 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Southport Road, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 3 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:09.
6 and 23 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on New Lane, Eccleston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Oct 2024 at 14:06.
6 and 20 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Leyland Lane, Ulnes Walton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:11.
6 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:53.
6 Jan and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Southport Road, Ulnes Walton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:04.
6 Jan and 21 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 9 Oct 2024 at 13:48.
6 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Lydiate Lane, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:08.
6 and 8 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Hamilton Road Rear 37 - 57, Chorley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Oct 2024 at 14:05.
6 Jan and 7 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Oct 2024 at 15:07.
8 Jan and 11 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:37.
13 Jan and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Manchester Road, Blackrod, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 13:59.
20 and 27 Jan 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadfield Drive, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 22 Oct 2024 at 16:16.
21 Jan and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Lydiate Lane, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Nov 2024 at 08:46.
22 and 30 Jan 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Greenland Avenue, Standish.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Oct 2024 at 11:46.
22 Jan and 25 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 25 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:34.
22 and 24 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Nov 2024 at 15:32.
22 and 28 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 16:25.
22 and 28 Jan 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Oct 2024 at 10:46.
25 Jan and 25 Jul 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Moor Road, Anglezarke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 January 2025 and could run through until 25 July 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 28 Oct 2024 at 12:56.
27 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 10:23.
27 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Nov 2024 at 12:49.
27 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on James Street, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 30 Sep 2024 at 10:02.
27 Jan and 26 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Crown Lane, Horwich, Bolton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 26 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Aug 2024 at 08:50.
27 Jan and 28 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Towngate, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:15.
1 Feb and 7 Mar 2025
Electricity North West (NorWeb) were proposing to carry out Utility repair and maintenance works on Preston Road, Chorley.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 7 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Oct 2024 at 16:22.
2 and 9 Feb 2025
Wigan Metropolitan Borough Council are proposing to carry out Highway repair and maintenance works on Almond Brook Road, Standish.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 February 2025 and could run through until 9 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wigan Metropolitan Borough Council on 14 Nov 2024 at 13:14.
10 Feb and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Lydiate Lane, Eccleston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 14:36.
13 Feb and 24 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:50.
13 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Withnell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:31.
13 Feb and 24 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:38.
13 and 19 Feb 2025
Lancashire County Council were proposing to carry out Highway improvement works on Denford Avenue, Leyland.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 7 Nov 2024 at 14:25.
17 and 21 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Babylon Lane, Adlington.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 11 Nov 2024 at 08:43.
17 Feb and 7 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 14:07.
17 and 21 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Friday Street, Chorley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Nov 2024 at 10:58.
17 and 20 Feb 2025
Cadent Gas are proposing to carry out New service connection on Pear Tree Lane, Euxton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 20 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:00.
17 and 21 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Friday Street, Chorley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Nov 2024 at 13:27.
17 and 21 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Steeley Lane, Chorley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Nov 2024 at 10:40.
17 and 21 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Steeley Lane, Chorley.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 20 Nov 2024 at 13:26.
18 and 22 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Nov 2024 at 12:02.
18 and 22 Feb 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 22 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Nov 2024 at 14:20.
18 Feb and 10 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Park Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 08:23.
24 Feb and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Springfield Road, Leyland.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 13:23.
Roadworks Map near to Buckingham Street, CHORLEY, PR6 0HD
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Buckingham Street, CHORLEY, PR6 0HD (16 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 Nov 2024 - 29 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.