ROADWORKS SUMMARY
Darkwood Lane, PRESTON, PR5 0RH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Darkwood Lane, PR5 0RH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Darkwood Lane, PRESTON, PR5 0RH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Darkwood Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Bolton Road

Lancashire County Council are carrying out Highway repair and maintenance works on Bolton Road, Withnell.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2023 at 13:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Jul 2024 at 12:16.

United Utilities Water (formerly North West Water) logo
LONG TERM
Until
31 May 2025
Details
View Map
Share
Follow
Miller Street

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Miller Street, Preston.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 4 March 2024 at 08:38 and could run through until 31 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Nov 2024 at 16:30.

Lancashire County Council logo
LONG TERM
Between
22 Jul 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Preston Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Preston Road, Grimsargh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Feb 2024 at 10:47.

Cadent Gas logo
LONG TERM
Between
6 Nov 2024 and 17 Jan 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:03.

Lancashire County Council logo
LONG TERM
Until
10 Jan 2025
Details
View Map
Share
Follow
Mount Street

Lancashire County Council are carrying out Highway repair and maintenance works on Mount Street, Preston.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 09:00 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 16 Dec 2024 at 10:03.

Cadent Gas logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Redlam

Cadent Gas are carrying out Utility repair and maintenance works on Redlam, Blackburn.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:10.

Cadent Gas logo
LONG TERM
Until
17 Feb 2025
Details
View Map
Share
Follow
St James's Road

Cadent Gas are carrying out Utility asset works on St James's Road, Blackburn.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 09:00 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 18 Nov 2024 at 09:02.

Cadent Gas logo
Finishing
Today
Details
View Map
Share
Follow
Church Lane

Cadent Gas are carrying out Utility asset works on Church Lane, Farington Moss, Farington.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 November 2024 at 08:45 and could run through until 18 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 08:47.

Cadent Gas logo
Finishing
Friday
Details
View Map
Share
Follow
Mardale Road

Cadent Gas are proposing to carry out Utility asset works on Mardale Road, Longridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 16:07.

Cadent Gas logo
LONG TERM
Between
26 Nov 2024 and 25 Feb 2025
Details
View Map
Share
Follow
St James's Road

Cadent Gas are proposing to carry out Utility asset works on St James's Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 November 2024 and could run through until 25 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 3 Oct 2024 at 16:00.

Lancashire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
North Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on North Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 3 Oct 2024 at 11:47.

Cadent Gas logo
Until
27 Dec 2024
Details
View Map
Share
Follow
King Street

Cadent Gas are carrying out Utility repair and maintenance works on King Street, Blackburn.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 12 December 2024 at 11:16 and could run through until 27 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:10.

United Utilities Water (formerly North West Water) logo
Finishing
Today
Details
View Map
Share
Follow
Spring Lane

United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Spring Lane, Samlesbury.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 December 2024 at 14:02 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Dec 2024 at 10:12.

Lancashire County Council logo
Between
23 and 31 Dec 2024
Details
View Map
Share
Follow
Sir Tom Finney Way

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Sir Tom Finney Way, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 1 Oct 2024 at 14:50.

Cadent Gas logo
LONG TERM
Between
2 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Farington Moss, Farington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 15:50.

Lancashire County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
North Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on North Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 13 Nov 2024 at 09:37.

Cadent Gas logo
Between
6 and 23 Jan 2025
Details
View Map
Share
Follow
Conway Avenue

Cadent Gas are proposing to carry out Utility asset works on Conway Avenue, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 23 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Oct 2024 at 09:43.

Lancashire County Council logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
North Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on North Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 25 Oct 2024 at 11:50.

LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Longridge Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Longridge Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Harlaxton Energy Networks on 16 Oct 2024 at 13:18.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Osbaldeston Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Osbaldeston Lane, Osbaldeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Oct 2024 at 10:40.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:22.

Cadent Gas logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:53.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Osbaldeston Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Osbaldeston Lane, Osbaldeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 09:25.

BT logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Longridge Road

BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Oct 2024 at 12:41.

Electricity North West (NorWeb) logo
Between
7 and 15 Jan 2025
Details
View Map
Share
Follow
Access To Tickled Trout

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Access To Tickled Trout, Samlesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 15:09.

United Utilities Water (formerly North West Water) logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Birchin Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Dec 2024 at 13:16.

Cadent Gas logo
Between
20 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Pleckgate Road

Cadent Gas are proposing to carry out Utility asset works on Pleckgate Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 15:27.

Cadent Gas logo
Between
21 Jan and 12 Feb 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Farington Moss, Farington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:53.

United Utilities Water (formerly North West Water) logo
Between
22 and 28 Jan 2025
Details
View Map
Share
Birchin Lane

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Oct 2024 at 10:46.

United Utilities Water (formerly North West Water) logo
Between
22 and 28 Jan 2025
Details
View Map
Share
Follow
Birchin Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 16:25.

Electricity North West (NorWeb) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Access To Tickled Trout

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Access To Tickled Trout, Samlesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 30 Oct 2024 at 14:59.

Lancashire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Sir Tom Finney Way

Lancashire County Council were proposing to carry out Highway repair and maintenance works on Sir Tom Finney Way, Preston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Nov 2024 at 13:28.

Cadent Gas logo
LONG TERM
Between
27 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Rhodes Avenue

Cadent Gas are proposing to carry out Utility asset works on Rhodes Avenue, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 31 Oct 2024 at 15:29.

Lancashire County Council logo
Between
31 Jan and 21 Feb 2025
Details
View Map
Share
New Hall Lane

Lancashire County Council were proposing to carry out Highway repair and maintenance works on New Hall Lane, Fishwick, Preston.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 28 Nov 2024 at 13:54.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Meadow Street

BT are proposing to carry out Utility repair and maintenance works on Meadow Street, Lancashire, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 7 Nov 2024 at 16:16.

Lancashire County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Nell Lane

Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:13.

Cadent Gas logo
Between
3 and 20 Feb 2025
Details
View Map
Share
Follow
Conway Avenue

Cadent Gas are proposing to carry out Utility asset works on Conway Avenue, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 20 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 10 Dec 2024 at 16:05.

Cadent Gas logo
Between
3 and 24 Feb 2025
Details
View Map
Share
Follow
Pleckgate Road

Cadent Gas are proposing to carry out Utility asset works on Pleckgate Road, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 24 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 16:20.

Lancashire County Council logo
Between
3 and 28 Feb 2025
Details
View Map
Share
Follow
Nell Lane

Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:06.

Lancashire County Council logo
LONG TERM
Between
3 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Nell Lane

Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:53.

Blackburn With Darwen Borough Council logo
Between
3 and 17 Feb 2025
Details
View Map
Share
Follow
Great Bolton Street

Blackburn With Darwen Borough Council are proposing to carry out Works for road purposes on Great Bolton Street, Blackburn.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 17 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Blackburn With Darwen Borough Council on 4 Nov 2024 at 15:45.

Lancashire County Council logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Chester Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Chester Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 10:27.

Lancashire County Council logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
Broadgate

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadgate, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 15:21.

Cadent Gas logo
LONG TERM
Between
10 Feb and 31 Mar 2025
Details
View Map
Share
Follow
Rhodes Avenue

Cadent Gas are proposing to carry out Utility asset works on Rhodes Avenue, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 13:01.

Lancashire County Council logo
LONG TERM
Between
10 Feb and 4 Apr 2025
Details
View Map
Share
Follow
North Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on North Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 13:07.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Poynter Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Poynter Street, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 13:03.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Sellers Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Sellers Street, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:47.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Dodgson Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Dodgson Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:24.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Ansdell Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Ansdell Street, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:53.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Collinson Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Collinson Street, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 13:12.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Fletcher Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Fletcher Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:08.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Andrew Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Andrew Street, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 11:26.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Landseer Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Landseer Street, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 13:16.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Holman Street

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holman Street, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 13:19.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Dodgson Place

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Dodgson Place, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:38.

Lancashire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Winckley Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Winckley Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 15:30.

Cadent Gas logo
Between
13 Feb and 5 Mar 2025
Details
View Map
Share
Follow
Chorley Road

Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Withnell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:31.

Cadent Gas logo
LONG TERM
Between
13 Feb and 24 Apr 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:38.

Cadent Gas logo
LONG TERM
Between
13 Feb and 24 Apr 2025
Details
View Map
Share
Follow
Bury Lane

Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:50.

United Utilities Water (formerly North West Water) logo
Between
14 and 18 Feb 2025
Details
View Map
Share
Follow
Manchester Road

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Manchester Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Nov 2024 at 16:10.

Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Roman Way

Harlaxton Energy Networks are proposing to carry out Utility asset works on Roman Way, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Harlaxton Energy Networks on 16 Oct 2024 at 13:29.

Cadent Gas logo
Between
17 Feb and 10 Mar 2025
Details
View Map
Share
Follow
St Georges Road

Cadent Gas are proposing to carry out Utility asset works on St Georges Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:36.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Mellor Brow

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Mellor Brow, Mellor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Nov 2024 at 13:00.

Electricity North West (NorWeb) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Abbott Brow

Electricity North West (NorWeb) are proposing to carry out New service connection on Abbott Brow, Mellor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 14 Oct 2024 at 14:58.

Electricity North West (NorWeb) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Abbott Brow

Electricity North West (NorWeb) are proposing to carry out New service connection on Abbott Brow, Mellor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 12:20.

United Utilities Water (formerly North West Water) logo
Between
18 and 22 Feb 2025
Details
View Map
Share
Birchin Lane

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 February 2025 and run through until 22 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Nov 2024 at 14:20.

United Utilities Water (formerly North West Water) logo
Between
18 and 22 Feb 2025
Details
View Map
Share
Follow
Birchin Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Nov 2024 at 12:02.

United Utilities Water (formerly North West Water) logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Lower Bank Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Lower Bank Road, Fulwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 10:21.

BT logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Longridge Road

BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 8 Nov 2024 at 12:10.

BT logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Longridge Road

BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Nov 2024 at 15:12.

BT logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Longridge Road

BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Dec 2024 at 08:44.

BT logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Longridge Road

BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 17 Dec 2024 at 15:05.

Cadent Gas logo
Between
24 Feb and 17 Mar 2025
Details
View Map
Share
Follow
St Georges Road

Cadent Gas are proposing to carry out Utility asset works on St Georges Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 15:49.

Lancashire County Council logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nell Lane

Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:10.

Cadent Gas logo
Between
24 Feb and 24 Mar 2025
Details
View Map
Share
Follow
Croston Road

Cadent Gas are proposing to carry out Utility asset works on Croston Road, Farington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 15:44.

Lancashire County Council logo
Between
24 Feb and 25 Mar 2025
Details
View Map
Share
Follow
New Hall Lane

Lancashire County Council are proposing to carry out Highway repair and maintenance works on New Hall Lane, Fishwick, Preston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 25 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Dec 2024 at 11:02.

Lancashire County Council logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nell Lane

Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:31.

United Utilities Water (formerly North West Water) logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Spring Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Spring Lane, Samlesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 11:13.

Lancashire County Council logo
Between
24 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Nell Lane

Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:02.

Lancashire County Council logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nell Lane

Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:51.

Lancashire County Council logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Nell Lane

Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:29.

Electricity North West (NorWeb) logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Canterbury Street

Electricity North West (NorWeb) are proposing to carry out New service connection on Canterbury Street, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity North West (NorWeb) on 4 Dec 2024 at 15:08.

Cadent Gas logo
LONG TERM
Between
25 Feb and 1 Apr 2025
Details
View Map
Share
Follow
Royshaw Avenue

Cadent Gas are proposing to carry out Utility asset works on Royshaw Avenue, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 1 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Dec 2024 at 11:30.

United Utilities Water (formerly North West Water) logo
Between
26 and 28 Feb 2025
Details
View Map
Share
Follow
West View

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on West View, Bamber Bridge.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Dec 2024 at 10:36.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Fowler Lane

Cadent Gas are proposing to carry out Utility asset works on Fowler Lane, Farington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 15:41.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Doodstone Nook

Cadent Gas are proposing to carry out Utility asset works on Doodstone Nook, Lostock Hall.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 1 Dec 2024 at 09:08.

Cadent Gas logo
Between
3 and 21 Mar 2025
Details
View Map
Share
Follow
Cadshaw Close

Cadent Gas are proposing to carry out Utility asset works on Cadshaw Close, Blackburn.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 11 Dec 2024 at 09:30.

United Utilities Water (formerly North West Water) logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Town Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Town Lane, Whittle-le-woods.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 11:52.

Lancashire County Council logo
LONG TERM
Between
3 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Ring Way

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Ring Way, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 4 Dec 2024 at 08:50.

United Utilities Water (formerly North West Water) logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Walton Green

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Walton Green, Walton-le-dale.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Dec 2024 at 09:39.

United Utilities Water (formerly North West Water) logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Back Wolseley Road

United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Wolseley Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 12:57.

Cadent Gas logo
Between
10 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Church Lane

Cadent Gas are proposing to carry out Utility asset works on Church Lane, Farington Moss, Farington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 12:52.

Lancashire County Council logo
LONG TERM
Between
17 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Wigan Road

Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:36.

Lancashire County Council logo
LONG TERM
Between
17 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Wigan Road

Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:33.

Lancashire County Council logo
LONG TERM
Between
17 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Wigan Road

Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:20.

Lancashire County Council logo
LONG TERM
Between
17 Mar and 23 Apr 2025
Details
View Map
Share
Follow
Wigan Road

Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:17.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Dukes Brow

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Dukes Brow, Blackburn.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 11:35.

Cadent Gas logo
Between
17 Mar and 3 Apr 2025
Details
View Map
Share
Follow
St Georges Road

Cadent Gas are proposing to carry out Utility asset works on St Georges Road, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 11:04.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Dukes Brow

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Dukes Brow, Blackburn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 11:35.


Roadworks Map near to Darkwood Lane, PRESTON, PR5 0RH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Darkwood Lane, PRESTON, PR5 0RH (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
United Utilities Water (formerly North West Water) logo
URGENT
  
SPRING LANE 
(0.8 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Verge - Road closure
In Progress
Since: 13 Dec 2024 14:02
(Scheduled: 13 Dec 2024 - 18 Dec 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.