ROADWORKS SUMMARY
Hoghton Lane, PRESTON, PR5 0JH
Introduction
View current and future planned roadworks and road closures for Hoghton Lane, PR5 0JH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Hoghton Lane, PRESTON, PR5 0JH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hoghton Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Lancashire County Council are carrying out Highway repair and maintenance works on Bolton Road, Withnell.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 July 2023 at 13:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 4 Jul 2024 at 12:16.
31 May 2025
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Miller Street, Preston.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 4 March 2024 at 08:38 and could run through until 31 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Nov 2024 at 16:30.
22 Jul 2024 and 29 Aug 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Preston Road, Grimsargh.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 July 2024 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Lancashire County Council on 14 Feb 2024 at 10:47.
6 Nov 2024 and 17 Jan 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 17 January 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cadent Gas on 3 Sep 2024 at 09:03.
10 Jan 2025
Lancashire County Council are carrying out Highway repair and maintenance works on Mount Street, Preston.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 09:00 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 16 Dec 2024 at 10:03.
Tuesday
Cadent Gas are carrying out Utility repair and maintenance works on Redlam, Blackburn.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2024 at 08:00 and could run through until 24 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Dec 2024 at 11:10.
Today
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 November 2024 and could run through until 18 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Electricity North West (NorWeb) on 19 Sep 2024 at 12:00.
Today
Cadent Gas are carrying out Utility asset works on Church Lane, Farington Moss, Farington.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 November 2024 at 08:45 and could run through until 18 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Nov 2024 at 08:47.
Monday
Lancashire County Council are proposing to carry out Highway repair and maintenance works on North Road, Preston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 3 Oct 2024 at 11:47.
13 Dec 2024 and 21 Jan 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 December 2024 and could run through until 21 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 7 Oct 2024 at 15:04.
Today
United Utilities Water (formerly North West Water) are carrying out Utility repair and maintenance works on Spring Lane, Samlesbury.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 December 2024 at 14:02 and could run through until 18 December 2024. The works will impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Dec 2024 at 10:12.
23 and 31 Dec 2024
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Sir Tom Finney Way, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 1 Oct 2024 at 14:50.
31 Dec 2024 and 4 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 31 December 2024 and could run through until 4 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 9 Oct 2024 at 13:14.
2 Jan and 5 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Farington Moss, Farington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 15:50.
6 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Oct 2024 at 11:53.
6 Jan and 14 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 8 Oct 2024 at 16:22.
6 Jan and 28 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on North Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 25 Oct 2024 at 11:50.
6 Jan and 28 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on North Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 13 Nov 2024 at 09:37.
6 Jan and 14 Feb 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Longridge Road, Preston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Harlaxton Energy Networks on 16 Oct 2024 at 13:18.
6 and 8 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Osbaldeston Lane, Osbaldeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Oct 2024 at 10:40.
6 and 8 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Osbaldeston Lane, Osbaldeston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 09:25.
6 Jan and 10 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 19 Oct 2024 at 12:41.
7 and 15 Jan 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Access To Tickled Trout, Samlesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 15:09.
8 Jan and 11 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 11 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 13 Nov 2024 at 09:37.
13 and 21 Jan 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mellor Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 12 Dec 2024 at 16:05.
13 and 21 Jan 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Western Drive, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 12 Dec 2024 at 16:06.
20 and 24 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 2 Dec 2024 at 13:16.
20 and 27 Jan 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadfield Drive, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 22 Oct 2024 at 16:16.
21 and 29 Jan 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Western Drive, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 31 Oct 2024 at 09:38.
21 Jan and 12 Feb 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Farington Moss, Farington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 12 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Nov 2024 at 09:53.
22 and 28 Jan 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 28 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 27 Oct 2024 at 10:46.
22 and 28 Jan 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 29 Oct 2024 at 16:25.
22 and 30 Jan 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mellor Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 30 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 31 Oct 2024 at 09:36.
27 and 29 Jan 2025
Lancashire County Council were proposing to carry out Highway repair and maintenance works on Sir Tom Finney Way, Preston.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 4 Nov 2024 at 13:28.
27 Jan and 4 Feb 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Access To Tickled Trout, Samlesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Electricity North West (NorWeb) on 30 Oct 2024 at 14:59.
29 Jan and 6 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Western Drive, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 6 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 7 Nov 2024 at 09:53.
31 Jan and 21 Feb 2025
Lancashire County Council were proposing to carry out Highway repair and maintenance works on New Hall Lane, Fishwick, Preston.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 31 January 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 28 Nov 2024 at 13:54.
3 and 5 Feb 2025
BT are proposing to carry out Utility repair and maintenance works on Meadow Street, Lancashire, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 7 Nov 2024 at 16:16.
3 Feb and 14 Mar 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:13.
3 and 28 Feb 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:06.
3 Feb and 14 Mar 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:53.
5 and 7 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Broadgate, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 15:21.
5 and 7 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Chester Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 10:27.
6 and 14 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Mellor Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 7 Nov 2024 at 10:22.
10 Feb and 4 Apr 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on North Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 13:07.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Dodgson Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:24.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Dodgson Place, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:38.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Winckley Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 12 Nov 2024 at 15:30.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Holman Street, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 13:19.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Landseer Street, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 13:16.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Sellers Street, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:47.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Ansdell Street, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:53.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Andrew Street, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 11:26.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Fletcher Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 12:08.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Collinson Street, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 13:12.
11 and 13 Feb 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Poynter Street, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 29 Nov 2024 at 13:03.
13 and 19 Feb 2025
Lancashire County Council were proposing to carry out Highway improvement works on Denford Avenue, Leyland.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 February 2025 and run through until 19 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 7 Nov 2024 at 14:25.
13 Feb and 5 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Chorley Road, Withnell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 10:31.
13 Feb and 24 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 20 Nov 2024 at 15:38.
13 Feb and 24 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Bury Lane, Withnell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 February 2025 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 22 Nov 2024 at 11:50.
14 and 18 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Manchester Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 18 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Nov 2024 at 16:10.
17 Feb and 7 Mar 2025
Electricity North West (NorWeb) are proposing to carry out Diversionary works on Preston Road, Chorley.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity North West (NorWeb) on 25 Nov 2024 at 14:07.
17 Feb and 10 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on St Georges Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 10:36.
17 and 21 Feb 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Mellor Brow, Mellor.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Nov 2024 at 13:00.
17 and 21 Feb 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Abbott Brow, Mellor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 14 Oct 2024 at 14:58.
17 and 21 Feb 2025
Electricity North West (NorWeb) are proposing to carry out New service connection on Abbott Brow, Mellor.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Electricity North West (NorWeb) on 10 Dec 2024 at 12:20.
17 Feb and 14 Mar 2025
Harlaxton Energy Networks are proposing to carry out Utility asset works on Roman Way, Preston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Harlaxton Energy Networks on 16 Oct 2024 at 13:29.
18 and 22 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 February 2025 and could run through until 22 February 2025. The works will impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 22 Nov 2024 at 12:02.
18 and 22 Feb 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Birchin Lane, Brindle.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 February 2025 and run through until 22 February 2025. The works were due to impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 15 Nov 2024 at 14:20.
19 and 21 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Lower Bank Road, Fulwood.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 10:21.
24 Feb and 4 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 8 Nov 2024 at 12:10.
24 Feb and 4 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:10.
24 Feb and 4 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 15 Nov 2024 at 15:12.
24 Feb and 4 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 15 Dec 2024 at 08:44.
24 Feb and 4 Apr 2025
BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by BT on 17 Dec 2024 at 15:05.
24 Feb and 4 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:51.
24 Feb and 17 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on St Georges Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 17 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 25 Nov 2024 at 15:49.
24 Feb and 21 Mar 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 15:02.
24 Feb and 4 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:29.
24 Feb and 4 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Nell Lane, Cuerden.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:31.
24 and 28 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Spring Lane, Samlesbury.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 20 Nov 2024 at 11:13.
24 Feb and 25 Mar 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on New Hall Lane, Fishwick, Preston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 25 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 4 Dec 2024 at 11:02.
24 Feb and 24 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Croston Road, Farington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 24 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 15:44.
26 Feb and 4 Mar 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Church Road, Leyland.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 4 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 5 Dec 2024 at 13:49.
26 and 28 Feb 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on West View, Bamber Bridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 6 Dec 2024 at 10:36.
3 and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Doodstone Nook, Lostock Hall.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 1 Dec 2024 at 09:08.
3 Mar and 25 Apr 2025
Lancashire County Council are proposing to carry out Highway repair and maintenance works on Ring Way, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Lancashire County Council on 4 Dec 2024 at 08:50.
3 and 21 Mar 2025
Cadent Gas are proposing to carry out Utility asset works on Fowler Lane, Farington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 21 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 7 Oct 2024 at 15:41.
3 and 5 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Town Lane, Whittle-le-woods.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 11:52.
10 Mar and 4 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on Church Lane, Farington Moss, Farington.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 29 Nov 2024 at 12:52.
10 and 14 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Walton Green, Walton-le-dale.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 17 Dec 2024 at 09:39.
10 and 12 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out Disconnection or alteration of supply on Back Wolseley Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 12:57.
17 Mar and 23 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:36.
17 Mar and 23 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:33.
17 Mar and 23 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:20.
17 Mar and 23 Apr 2025
Lancashire County Council are proposing to carry out Section 50 on Wigan Road, Clayton-le-woods.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 23 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Lancashire County Council on 2 Dec 2024 at 16:17.
17 and 21 Mar 2025
United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Dukes Brow, Blackburn.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 11:35.
17 and 21 Mar 2025
United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Dukes Brow, Blackburn.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Dec 2024 at 11:35.
17 Mar and 3 Apr 2025
Cadent Gas are proposing to carry out Utility asset works on St Georges Road, Preston.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 3 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 2 Dec 2024 at 11:04.
Roadworks Map near to Hoghton Lane, PRESTON, PR5 0JH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Hoghton Lane, PRESTON, PR5 0JH (4 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.