ROADWORKS SUMMARY
Hillhouse Road, PRESTON, PR3 2DG

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Hillhouse Road, PR3 2DG and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Hillhouse Road, PRESTON, PR3 2DG

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Hillhouse Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lancashire County Council logo
LONG TERM
Between
22 Jul 2024 and 29 Aug 2025
Details
View Map
Share
Follow
Preston Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Preston Road, Grimsargh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 29 August 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lancashire County Council on 14 Feb 2024 at 10:47.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ribbleton Avenue

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Ribbleton Avenue, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 19 Sep 2024 at 12:11.

Lancashire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Ribbleton Avenue

Lancashire County Council are carrying out Highway repair and maintenance works on Ribbleton Avenue, Preston.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 10:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Lancashire County Council on 18 Nov 2024 at 13:03.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Preston Road

Cadent Gas were proposing to carry out Utility asset works on Preston Road, Longridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 9 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 09:28.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Preston Road

Cadent Gas are proposing to carry out Utility asset works on Preston Road, Longridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 7 Aug 2024 at 10:17.

Cadent Gas logo
Finishing
Monday
Details
View Map
Share
Follow
Preston Road

Cadent Gas are proposing to carry out Utility asset works on Preston Road, Longridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 9 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2024 at 11:04.

Cadent Gas logo
Between
25 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Mardale Road

Cadent Gas are proposing to carry out Utility asset works on Mardale Road, Longridge.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 28 Aug 2024 at 16:07.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Follow
Chapel Hill

Cadent Gas are proposing to carry out Utility asset works on Chapel Hill, Longridge.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 10 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 4 Aug 2024 at 11:07.

Cadent Gas logo
Finishing
Tuesday
Details
View Map
Share
Chapel Hill

Cadent Gas were proposing to carry out Utility asset works on Chapel Hill, Longridge.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 November 2024 and run through until 10 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 5 Sep 2024 at 09:29.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Inglewhite Road

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Inglewhite Road, Goosnargh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Oct 2024 at 14:08.

United Utilities Water (formerly North West Water) logo
Between
9 and 11 Dec 2024
Details
View Map
Share
Follow
Inglewhite Road

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Inglewhite Road, Goosnargh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 16 Sep 2024 at 09:31.

Electricity North West (NorWeb) logo
Between
9 and 16 Dec 2024
Details
View Map
Share
Follow
Abbott Brow

Electricity North West (NorWeb) are proposing to carry out New service connection on Abbott Brow, Mellor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 December 2024 and could run through until 16 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 28 Sep 2024 at 11:44.

Electricity North West (NorWeb) logo
Between
9 and 13 Dec 2024
Details
View Map
Share
Abbott Brow

Electricity North West (NorWeb) were proposing to carry out New service connection on Abbott Brow, Mellor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 13 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 8 Oct 2024 at 09:45.

Lancashire County Council logo
Between
23 and 31 Dec 2024
Details
View Map
Share
Follow
Sir Tom Finney Way

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Sir Tom Finney Way, Preston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 December 2024 and could run through until 31 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 1 Oct 2024 at 14:50.

Cadent Gas logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Whittingham Lane

Cadent Gas are proposing to carry out Utility asset works on Whittingham Lane, Goosnargh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 13 Nov 2024 at 11:58.

Cadent Gas logo
LONG TERM
Between
6 Jan and 3 Mar 2025
Details
View Map
Share
Follow
Whittingham Lane

Cadent Gas are proposing to carry out Utility asset works on Whittingham Lane, Goosnargh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 15 Oct 2024 at 10:17.

BT logo
LONG TERM
Between
6 Jan and 10 Feb 2025
Details
View Map
Share
Follow
Longridge Road

BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 19 Oct 2024 at 12:41.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Osbaldeston Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Osbaldeston Lane, Osbaldeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 21 Nov 2024 at 09:25.

United Utilities Water (formerly North West Water) logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Osbaldeston Lane

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Osbaldeston Lane, Osbaldeston.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 10 Oct 2024 at 10:40.

LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Longridge Road

Harlaxton Energy Networks are proposing to carry out Utility asset works on Longridge Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Harlaxton Energy Networks on 16 Oct 2024 at 13:18.

United Utilities Water (formerly North West Water) logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Talbot Street

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Talbot Street, Chipping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 14 Oct 2024 at 11:51.

Electricity North West (NorWeb) logo
Between
7 and 15 Jan 2025
Details
View Map
Share
Follow
Access To Tickled Trout

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Access To Tickled Trout, Samlesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 15 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 26 Nov 2024 at 15:09.

Lancashire County Council logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Sir Tom Finney Way

Lancashire County Council were proposing to carry out Highway repair and maintenance works on Sir Tom Finney Way, Preston.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 4 Nov 2024 at 13:28.

Electricity North West (NorWeb) logo
Between
27 Jan and 4 Feb 2025
Details
View Map
Share
Follow
Access To Tickled Trout

Electricity North West (NorWeb) are proposing to carry out Diversionary works on Access To Tickled Trout, Samlesbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 4 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Electricity North West (NorWeb) on 30 Oct 2024 at 14:59.

Lancashire County Council logo
LONG TERM
Between
5 Feb and 13 Mar 2025
Details
View Map
Share
Follow
Preston Road

Lancashire County Council are proposing to carry out Highway repair and maintenance works on Preston Road, Ribchester.

These works are categorised as Major.

The works will start on or after 5 February 2025 and could run through until 13 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 15 Nov 2024 at 12:01.

Lancashire County Council logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Goosnargh Lane

Lancashire County Council are proposing to carry out Section 50 on Goosnargh Lane, Goosnargh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 21 Nov 2024 at 16:23.

Lancashire County Council logo
Between
10 Feb and 2 Mar 2025
Details
View Map
Share
Follow
Goosnargh Lane

Lancashire County Council are proposing to carry out Section 50 on Goosnargh Lane, Goosnargh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Lancashire County Council on 21 Nov 2024 at 16:39.

Cadent Gas logo
LONG TERM
Between
17 Feb and 14 Apr 2025
Details
View Map
Share
Follow
Whittingham Lane

Cadent Gas are proposing to carry out Utility asset works on Whittingham Lane, Goosnargh.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cadent Gas on 27 Nov 2024 at 12:00.

Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Roman Way

Harlaxton Energy Networks are proposing to carry out Utility asset works on Roman Way, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Harlaxton Energy Networks on 16 Oct 2024 at 13:29.

Electricity North West (NorWeb) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Abbott Brow

Electricity North West (NorWeb) are proposing to carry out New service connection on Abbott Brow, Mellor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Electricity North West (NorWeb) on 14 Oct 2024 at 14:58.

United Utilities Water (formerly North West Water) logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Mellor Brow

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Mellor Brow, Mellor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 18 Nov 2024 at 13:00.

BT logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Longridge Road

BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 13:34.

BT logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Longridge Road

BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 15 Nov 2024 at 15:12.

BT logo
LONG TERM
Between
24 Feb and 4 Apr 2025
Details
View Map
Share
Follow
Longridge Road

BT are proposing to carry out Utility repair and maintenance works on Longridge Road, Preston.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 8 Nov 2024 at 12:10.

United Utilities Water (formerly North West Water) logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Horns Lane

United Utilities Water (formerly North West Water) are proposing to carry out Utility repair and maintenance works on Horns Lane, Goosnargh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 26 Nov 2024 at 15:03.

United Utilities Water (formerly North West Water) logo
Between
25 Feb and 2 Mar 2025
Details
View Map
Share
Mersey Street

United Utilities Water (formerly North West Water) were proposing to carry out Utility repair and maintenance works on Mersey Street, Longridge.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 2 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 25 Nov 2024 at 12:23.

United Utilities Water (formerly North West Water) logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Clitheroe Road

United Utilities Water (formerly North West Water) are proposing to carry out New service connection on Clitheroe Road, Dutton, Ribchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by United Utilities Water (formerly North West Water) on 3 Dec 2024 at 12:50.


Roadworks Map near to Hillhouse Road, PRESTON, PR3 2DG

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 4 Dec 2024 09:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Hillhouse Road, PRESTON, PR3 2DG (17 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cadent Gas logo
MAJOR
  
PRESTON ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 18 Nov 2024 - 9 Dec 2024
0.2
Details
Share
Follow
2
Cadent Gas logo
MAJOR
  
PRESTON ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 18 Nov 2024 - 9 Dec 2024)
0.2
Details
Share
3
Cadent Gas logo
MAJOR
  
PRESTON ROAD 
(0.2 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 18 Nov 2024 - 9 Dec 2024
0.2
Details
Share
Follow
4
United Utilities Water (formerly North West Water) logo
HACKING DRIVE 
(0.5 miles)
United Utilities Water (formerly North West Water)
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 5 Dec 2024 - 9 Dec 2024
0.5
Details
Share
Follow
5
Cadent Gas logo
MAJOR
  
CHAPEL HILL 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 25 Nov 2024 - 10 Dec 2024
0.5
Details
Share
Follow
6
Cadent Gas logo
MAJOR
  
CHAPEL HILL 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 25 Nov 2024 - 10 Dec 2024)
0.5
Details
Share
7
Cadent Gas logo
MAJOR
  
CONISTON CLOSE 
(0.5 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 13 Dec 2024
0.5
Details
Share
Follow
8
Cadent Gas logo
CHAPEL HILL 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 25 Nov 2024 - 6 Dec 2024
0.6
Details
Share
Follow
9
Cadent Gas logo
CHAPEL HILL 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Multi-way signals
Cancelled
(Scheduled: 25 Nov 2024 - 6 Dec 2024)
0.6
Details
Share
10
Cadent Gas logo
MAJOR
  
GRASMERE GROVE 
(0.6 miles)
Cadent Gas
Utility asset works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 9 Dec 2024
0.6
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.