ROADWORKS SUMMARY
Mayfield Drive, NEWPORT, PO30 2DH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Mayfield Drive, PO30 2DH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Mayfield Drive, NEWPORT, PO30 2DH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Mayfield Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Isle Of Wight Council logo
LONG TERM
Between
6 Jan and 30 Sep 2025
Details
View Map
Share
High Street

Isle Of Wight Council were proposing to carry out Highway repair and maintenance works on High Street, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 30 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 2 Oct 2024 at 11:28.

Southern Gas Networks logo
LONG TERM
Between
6 Jan and 14 Mar 2025
Details
View Map
Share
Briddlesford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Briddlesford Road, Newport.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 20 Nov 2024 at 15:59.

Southern Water logo
LONG TERM
Between
3 Feb and 29 Jul 2025
Details
View Map
Share
Follow
Woodvale Road

Southern Water are proposing to carry out Utility repair and maintenance works on Woodvale Road, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 24 Dec 2024 at 10:56.

Southern Water logo
LONG TERM
Until
29 Jul 2025
Details
View Map
Share
Follow
Woodvale Road

Southern Water are carrying out Utility repair and maintenance works on Woodvale Road, Gurnard.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 17:30 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 4 Feb 2025 at 14:41.

Southern Water logo
LONG TERM
Until
29 Jul 2025
Details
View Map
Share
Follow
Woodvale Road

Southern Water are carrying out Utility repair and maintenance works on Woodvale Road, Gurnard.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 February 2025 at 10:00 and could run through until 29 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 10 Feb 2025 at 09:57.

Southern Gas Networks logo
LONG TERM
Until
11 Apr 2025
Details
View Map
Share
Follow
Briddlesford Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Briddlesford Road, Newport.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 February 2025 at 10:50 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Feb 2025 at 11:01.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
Whiterails Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Whiterails Road, Newport.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 February 2025 at 09:00 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 09:37.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Station Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Station Road, Wootton.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Feb 2025 at 09:33.

Southern Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Greenway

Southern Water were proposing to carry out Utility repair and maintenance works on Greenway, Binstead.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 28 Jan 2025 at 09:27.

Isle Of Wight Council logo
LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Parkhurst Road

Isle Of Wight Council are carrying out Highway repair and maintenance works on Parkhurst Road, Newport.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 February 2025 at 15:02 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Isle Of Wight Council on 20 Feb 2025 at 14:20.

Isle Of Wight Council logo
Finishing
Friday
Details
View Map
Share
Follow
Merstone Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Merstone Lane, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:23.

Isle Of Wight Council logo
Finishing
Friday
Details
View Map
Share
Follow
Main Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Main Road, Alverstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:22.

Isle Of Wight Council logo
Finishing
Friday
Details
View Map
Share
Follow
Hearn Street

Isle Of Wight Council are proposing to carry out Highway improvement works on Hearn Street, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 3 Feb 2025 at 15:52.

Southern Gas Networks logo
LONG TERM
Until
23 May 2025
Details
View Map
Share
Follow
Park Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Park Road, Wootton.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 February 2025 at 15:00 and could run through until 23 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2025 at 15:08.

BT logo
Finishing
Wednesday
Details
View Map
Share
Calbourne Road

BT were proposing to carry out Utility asset works on Calbourne Road, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 5 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 4 Dec 2024 at 14:50.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Calbourne Road

BT are proposing to carry out Utility asset works on Calbourne Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 5 Dec 2024 at 08:17.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Calbourne Road

BT are proposing to carry out Utility asset works on Calbourne Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 16 Jan 2025 at 10:59.

BT logo
Finishing
Wednesday
Details
View Map
Share
Follow
Calbourne Road

BT are proposing to carry out Utility asset works on Calbourne Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 28 Nov 2024 at 09:22.

Southern Water logo
LONG TERM
Between
3 Mar and 14 May 2025
Details
View Map
Share
Follow
Solent View Road

Southern Water are proposing to carry out Utility repair and maintenance works on Solent View Road, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 20 Dec 2024 at 15:07.

Southern Water logo
LONG TERM
Between
3 Mar and 14 May 2025
Details
View Map
Share
Follow
Solent View Road

Southern Water are proposing to carry out Utility repair and maintenance works on Solent View Road, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 22 Jan 2025 at 11:28.

Southern Water logo
LONG TERM
Between
3 Mar and 14 May 2025
Details
View Map
Share
Follow
Solent View Road

Southern Water are proposing to carry out Utility repair and maintenance works on Solent View Road, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 14 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 27 Jan 2025 at 15:53.

Isle Of Wight Council logo
Finishing
Thursday
Details
View Map
Share
Rew Street

Isle Of Wight Council were proposing to carry out Highway repair and maintenance works on Rew Street, Gurnard.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 March 2025 and run through until 6 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 13 Feb 2025 at 12:20.

Isle Of Wight Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Borthwood Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Borthwood Lane, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 15:38.

Isle Of Wight Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Rowridge Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Rowridge Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 12:08.

Isle Of Wight Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Rowridge Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Rowridge Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 13:40.

Isle Of Wight Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Froglands Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Froglands Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 12:07.

Isle Of Wight Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Froglands Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Froglands Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 14:32.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:12.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:12.

Southern Water logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Chapel Street

Southern Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 13 Dec 2024 at 14:45.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
South Street

Isle Of Wight Council are proposing to carry out Highway improvement works on South Street, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 13 Feb 2025 at 12:04.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:12.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:12.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Combley Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Combley Road, Havenstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:10.

Isle Of Wight Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Harvey Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Harvey Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 15:29.

Isle Of Wight Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Harvey Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Harvey Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 16:09.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:11.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Stroud Wood Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Stroud Wood Road, Havenstreet, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:13.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:11.

Isle Of Wight Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Stroud Wood Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Stroud Wood Road, Havenstreet, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 9 Dec 2024 at 14:11.

Murphy Power Distribution logo
Between
10 and 17 Mar 2025
Details
View Map
Share
Parkhurst Road

Murphy Power Distribution were proposing to carry out New service connection on Parkhurst Road, Newport.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 17 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 8 Jan 2025 at 10:29.

Isle Of Wight Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Arctic Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Arctic Road, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 15:27.

Isle Of Wight Council logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Arctic Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Arctic Road, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 16:12.

Isle Of Wight Council logo
Between
10 and 19 Mar 2025
Details
View Map
Share
Follow
Seaview Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Seaview Road, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 25 Feb 2025 at 10:48.

Isle Of Wight Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Betty Haunt Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Betty Haunt Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 15:18.

Isle Of Wight Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Betty Haunt Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Betty Haunt Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 15:40.

Isle Of Wight Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Green Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Green Lane, Brading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 14:47.

Isle Of Wight Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Green Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Green Lane, Brading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 14:54.

Isle Of Wight Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Locks Green Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Locks Green Road, Porchfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 14:46.

Isle Of Wight Council logo
Between
12 and 14 Mar 2025
Details
View Map
Share
Follow
Locks Green Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Locks Green Road, Porchfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Isle Of Wight Council on 17 Feb 2025 at 14:53.

Isle Of Wight Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Whitwell Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitwell Road, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 29 Jan 2025 at 12:30.

Isle Of Wight Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Hollow Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Hollow Lane, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 24 Feb 2025 at 16:30.

Isle Of Wight Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Hollow Lane

Isle Of Wight Council were proposing to carry out Highway repair and maintenance works on Hollow Lane, Godshill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 25 Feb 2025 at 15:09.

Isle Of Wight Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Hollow Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Hollow Lane, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 26 Feb 2025 at 11:53.

Scottish Hydro Electric Power Dis logo
Between
17 and 28 Mar 2025
Details
View Map
Share
West Street

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on West Street, Godshill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 28 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Jan 2025 at 15:21.

Isle Of Wight Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
West Street

Isle Of Wight Council are proposing to carry out Highway improvement works on West Street, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 29 Jan 2025 at 10:14.

Isle Of Wight Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Bobberstone Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Bobberstone Lane, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 25 Feb 2025 at 07:34.

Isle Of Wight Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Bobberstone Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Bobberstone Lane, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 25 Feb 2025 at 10:40.

Southern Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Merstone Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Merstone Lane, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 13 Dec 2024 at 14:54.

Isle Of Wight Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Pellview Close

Isle Of Wight Council are proposing to carry out Highway improvement works on Pellview Close, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 20 Feb 2025 at 11:09.

Isle Of Wight Council logo
Between
17 and 28 Mar 2025
Details
View Map
Share
Follow
Pellview Close

Isle Of Wight Council are proposing to carry out Highway improvement works on Pellview Close, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 20 Feb 2025 at 11:22.

Isle Of Wight Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Follow
Rew Street

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Rew Street, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 25 Feb 2025 at 07:36.

Isle Of Wight Council logo
Between
17 and 19 Mar 2025
Details
View Map
Share
Rew Street

Isle Of Wight Council were proposing to carry out Highway repair and maintenance works on Rew Street, Gurnard.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 March 2025 and run through until 19 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 25 Feb 2025 at 10:37.

Isle Of Wight Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Mews Lane

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Mews Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 25 Feb 2025 at 07:37.

Isle Of Wight Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Victoria Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Victoria Road, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 15:19.

Isle Of Wight Council logo
Between
19 and 21 Mar 2025
Details
View Map
Share
Follow
Victoria Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Victoria Road, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 16:06.

Isle Of Wight Council logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
High Street

Isle Of Wight Council are proposing to carry out Highway improvement works on High Street, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 4 Oct 2024 at 14:37.

Isle Of Wight Council logo
Between
24 Mar and 11 Apr 2025
Details
View Map
Share
Follow
School Road

Isle Of Wight Council are proposing to carry out Highway improvement works on School Road, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 4 Oct 2024 at 14:38.

Southern Water logo
Between
24 and 28 Mar 2025
Details
View Map
Share
Follow
Chapel Street

Southern Water are proposing to carry out Utility repair and maintenance works on Chapel Street, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Water on 20 Dec 2024 at 12:47.

Isle Of Wight Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Pyle Street

Isle Of Wight Council are proposing to carry out Highway improvement works on Pyle Street, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 13 Feb 2025 at 14:53.

Isle Of Wight Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Hearn Street

Isle Of Wight Council are proposing to carry out Highway improvement works on Hearn Street, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 13 Feb 2025 at 12:09.

Isle Of Wight Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Havenstreet Main Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Havenstreet Main Road, Havenstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 11:24.

Isle Of Wight Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Havenstreet Main Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Havenstreet Main Road, Havenstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 11:37.

Isle Of Wight Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Cycle Track From Newport To Wootton

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Cycle Track From Newport To Wootton, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 15:15.

Isle Of Wight Council logo
Between
24 and 26 Mar 2025
Details
View Map
Share
Follow
Cycle Track From Newport To Wootton

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Cycle Track From Newport To Wootton, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 16:06.

Isle Of Wight Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Maxted Close

Isle Of Wight Council are proposing to carry out Highway improvement works on Maxted Close, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 4 Feb 2025 at 11:22.

Isle Of Wight Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Maxted Close

Isle Of Wight Council are proposing to carry out Highway improvement works on Maxted Close, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 4 Feb 2025 at 13:33.

Isle Of Wight Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Seaview Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Seaview Road, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 4 Feb 2025 at 11:21.

Isle Of Wight Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Bellevue Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Bellevue Road, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 4 Feb 2025 at 11:22.

Isle Of Wight Council logo
Between
24 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Bellevue Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Bellevue Road, Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 4 Feb 2025 at 15:31.

Isle Of Wight Council logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Carisbrooke Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Carisbrooke Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Jan 2025 at 10:38.

Isle Of Wight Council logo
Between
31 Mar and 11 Apr 2025
Details
View Map
Share
Follow
Carisbrooke Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Carisbrooke Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 09:03.

Southern Water logo
Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Merstone Lane

Southern Water are proposing to carry out Utility repair and maintenance works on Merstone Lane, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Water on 20 Dec 2024 at 12:47.

Between
7 and 11 Apr 2025
Details
View Map
Share
Follow
Pondcast Lane

Wightfibre (previously Isle Of Wight Cable And Telephone Co) are proposing to carry out Utility asset works on Pondcast Lane, Havenstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wightfibre (previously Isle Of Wight Cable And Telephone Co) on 6 Jan 2025 at 11:33.

Isle Of Wight Council logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Colemans Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Colemans Lane, Porchfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:37.

Murphy Power Distribution logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Parkhurst Road

Murphy Power Distribution were proposing to carry out New service connection on Parkhurst Road, Newport.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 17 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 8 Jan 2025 at 10:32.

Murphy Power Distribution logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Parkhurst Road

Murphy Power Distribution are proposing to carry out Utility asset works on Parkhurst Road, Newport.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 8 Jan 2025 at 11:04.

Murphy Power Distribution logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Parkhurst Road

Murphy Power Distribution were proposing to carry out New service connection on Parkhurst Road, Newport.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 April 2025 and run through until 17 April 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Murphy Power Distribution on 8 Jan 2025 at 14:12.

Isle Of Wight Council logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Hillrise Avenue

Isle Of Wight Council are proposing to carry out Highway improvement works on Hillrise Avenue, Binstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 13 Feb 2025 at 09:14.

Isle Of Wight Council logo
Between
7 and 17 Apr 2025
Details
View Map
Share
Follow
Hillrise Avenue

Isle Of Wight Council are proposing to carry out Highway improvement works on Hillrise Avenue, Binstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 13 Feb 2025 at 10:33.

Isle Of Wight Council logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Alverstone Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Alverstone Road, East Cowes.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:41.

Isle Of Wight Council logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Brocks Copse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Brocks Copse Road, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:45.

Isle Of Wight Council logo
Between
7 and 18 Apr 2025
Details
View Map
Share
Follow
Brocks Copse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Brocks Copse Road, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:45.

Isle Of Wight Council logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
Follow
High Street

Isle Of Wight Council are proposing to carry out Highway improvement works on High Street, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 22 Nov 2024 at 15:20.

Isle Of Wight Council logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
High Street

Isle Of Wight Council were proposing to carry out Highway improvement works on High Street, Godshill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 20 Feb 2025 at 11:27.

Isle Of Wight Council logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
Follow
High Street

Isle Of Wight Council are proposing to carry out Highway improvement works on High Street, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 22 Nov 2024 at 15:21.

Isle Of Wight Council logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
High Street

Isle Of Wight Council were proposing to carry out Highway improvement works on High Street, Godshill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 20 Feb 2025 at 11:25.

Isle Of Wight Council logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
Follow
High Street

Isle Of Wight Council are proposing to carry out Highway improvement works on High Street, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 22 Nov 2024 at 15:20.

Isle Of Wight Council logo
Between
21 Apr and 16 May 2025
Details
View Map
Share
High Street

Isle Of Wight Council were proposing to carry out Highway improvement works on High Street, Godshill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 20 Feb 2025 at 11:26.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Princelett Shute

Isle Of Wight Council are proposing to carry out Highway improvement works on Princelett Shute, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 14:40.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Princelett Shute

Isle Of Wight Council are proposing to carry out Highway improvement works on Princelett Shute, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 14:41.

Isle Of Wight Council logo
Between
21 Apr and 1 May 2025
Details
View Map
Share
Follow
Niton Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Niton Road, Rookley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:11.

Isle Of Wight Council logo
Between
21 Apr and 1 May 2025
Details
View Map
Share
Follow
Niton Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Niton Road, Rookley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:51.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Watery Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Watery Lane, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 14:42.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Harbors Lake Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Harbors Lake Lane, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 14:42.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Sandown Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Sandown Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:32.

Isle Of Wight Council logo
Between
21 Apr and 1 May 2025
Details
View Map
Share
Follow
Sandown Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Sandown Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 08:29.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Knighton Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Knighton Lane, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 14:43.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Arreton Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Arreton Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:32.

Isle Of Wight Council logo
Between
21 Apr and 1 May 2025
Details
View Map
Share
Follow
Arreton Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Arreton Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 10 Feb 2025 at 08:06.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Knighton Shute

Isle Of Wight Council are proposing to carry out Highway improvement works on Knighton Shute, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 14:44.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Knighton Shute

Isle Of Wight Council are proposing to carry out Highway improvement works on Knighton Shute, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 14:43.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Downend Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Downend Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:24.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Downend Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Downend Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:35.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Downs Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Downs Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:46.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Downs Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Downs Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:50.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Downs Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Downs Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:44.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Downs Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Downs Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:49.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Mersley Downs Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Mersley Downs Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:13.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Mersley Downs Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Mersley Downs Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:29.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Mersley Downs Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Mersley Downs Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:55.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Mersley Downs Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Mersley Downs Road, Arreton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:29.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Brading Down Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Brading Down Road, Brading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:28.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Brading Down Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Brading Down Road, Brading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:45.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Brading Down Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Brading Down Road, Brading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:31.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Brading Down Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Brading Down Road, Brading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:46.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Long Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Long Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:24.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Long Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Long Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:51.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
East Ashey Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on East Ashey Lane, Brading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:44.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Green Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Green Lane, Brading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:44.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Long Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Long Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:24.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Long Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Long Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:52.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Green Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Green Lane, Brading.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:45.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Long Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Long Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 10:32.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Long Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Long Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 15:34.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:24.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:32.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Deacons Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Deacons Lane, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:42.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Carters Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Carters Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:42.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Carters Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Carters Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:43.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Carters Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Carters Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 11:44.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:23.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:31.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:23.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:29.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Whiterails Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whiterails Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:45.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Whiterails Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whiterails Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:23.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Whiterails Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whiterails Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:58.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Whiterails Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whiterails Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:19.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:59.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:26.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:33.

Isle Of Wight Council logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Briddlesford Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Briddlesford Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:28.

Isle Of Wight Council logo
Between
22 Apr and 1 May 2025
Details
View Map
Share
Follow
Merstone Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Merstone Lane, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 13:52.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Alverstone Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Alverstone Road, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 13:47.

Isle Of Wight Council logo
Between
22 Apr and 1 May 2025
Details
View Map
Share
Follow
Alverstone Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Alverstone Road, Newchurch.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 1 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 13:45.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Main Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Main Road, Alverstone.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 13:54.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:04.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:02.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 13:59.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:00.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 13:58.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Stroud Wood Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Stroud Wood Road, Havenstreet, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:06.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Ashey Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Ashey Road, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 13:55.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Stroud Wood Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Stroud Wood Road, Havenstreet, Ryde.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 14:09.

Murphy Power Distribution logo
Between
22 Apr and 4 May 2025
Details
View Map
Share
Follow
Parkhurst Road

Murphy Power Distribution are proposing to carry out New service connection on Parkhurst Road, Newport.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 9 Jan 2025 at 09:05.

Murphy Power Distribution logo
Between
22 Apr and 4 May 2025
Details
View Map
Share
Follow
Parkhurst Road

Murphy Power Distribution are proposing to carry out New service connection on Parkhurst Road, Newport.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 4 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Murphy Power Distribution on 15 Jan 2025 at 08:38.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Binstead Lodge Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Binstead Lodge Road, Binstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 13 Feb 2025 at 09:13.

Isle Of Wight Council logo
Between
22 Apr and 2 May 2025
Details
View Map
Share
Follow
Binstead Lodge Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Binstead Lodge Road, Binstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 24 Feb 2025 at 11:33.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Furrlongs

BT are proposing to carry out Utility asset works on Furrlongs, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 23 Jan 2025 at 10:05.

BT logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Follow
Furrlongs

BT are proposing to carry out Utility asset works on Furrlongs, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 10 Feb 2025 at 13:22.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 6 Jun 2025
Details
View Map
Share
Follow
Nodes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nodes Road, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 26 Feb 2025 at 10:32.

Southern Gas Networks logo
LONG TERM
Between
28 Apr and 6 Jun 2025
Details
View Map
Share
Follow
Nodes Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Nodes Road, Northwood.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Feb 2025 at 14:04.

Isle Of Wight Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Highwood Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Highwood Lane, Rookley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:49.

Isle Of Wight Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Blacklands Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Blacklands Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:40.

Isle Of Wight Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Locks Green Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Locks Green Road, Porchfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:51.

Isle Of Wight Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Locks Green Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Locks Green Road, Porchfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 10:52.

Isle Of Wight Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Firestone Copse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Firestone Copse Road, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:05.

Isle Of Wight Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Locks Green Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Locks Green Road, Porchfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:41.

Isle Of Wight Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Newnham Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Newnham Lane, Binstead.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:00.

Isle Of Wight Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Firestone Copse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Firestone Copse Road, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:11.

Isle Of Wight Council logo
Between
5 and 16 May 2025
Details
View Map
Share
Follow
Firestone Copse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Firestone Copse Road, Wootton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:23.

Scottish Hydro Electric Power Dis logo
Between
6 and 16 May 2025
Details
View Map
Share
Follow
West Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on West Street, Godshill.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 26 Feb 2025 at 10:39.

Isle Of Wight Council logo
Between
12 and 23 May 2025
Details
View Map
Share
Little London

Isle Of Wight Council were proposing to carry out Highway repair and maintenance works on Little London, Newport.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 23 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 5 Feb 2025 at 09:24.

BT logo
Between
12 and 15 May 2025
Details
View Map
Share
Follow
Rew Street

BT are proposing to carry out Utility asset works on Rew Street, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 28 Feb 2025 at 14:45.

Scottish Hydro Electric Power Dis logo
Between
19 and 30 May 2025
Details
View Map
Share
West Street

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on West Street, Godshill.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 19 May 2025 and run through until 30 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Feb 2025 at 11:19.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Billingham Shute

Isle Of Wight Council are proposing to carry out Highway improvement works on Billingham Shute, Shorwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:27.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Berry Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Berry Lane, Chillerton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:28.

BT logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Sandy Lane

BT are proposing to carry out Utility asset works on Sandy Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 13 Feb 2025 at 13:04.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitcombe Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitcombe Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:31.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitcombe Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitcombe Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:32.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitcombe Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitcombe Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:32.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitcombe Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitcombe Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:17.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Calbourne Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Calbourne Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:06.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Burnt House Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Burnt House Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:24.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Burnt House Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Burnt House Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:26.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Burnt House Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Burnt House Lane, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:14.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitcombe Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitcombe Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:22.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitcombe Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitcombe Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:30.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Calbourne Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Calbourne Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:08.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Calbourne Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Calbourne Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:11.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitcombe Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitcombe Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:19.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitcombe Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitcombe Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:21.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Combley Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Combley Road, Havenstreet.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:38.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Yarmouth Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Yarmouth Road, Calbourne.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 10:33.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitehouse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitehouse Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:33.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitehouse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitehouse Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:37.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitehouse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitehouse Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:35.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitehouse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitehouse Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 11:35.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Whitehouse Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Whitehouse Road, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:02.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Noke Common

Isle Of Wight Council are proposing to carry out Highway improvement works on Noke Common, Newport.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:34.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Hillis Gate Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Hillis Gate Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:47.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Pallance Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Pallance Lane, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:41.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Hillis Gate Road

Isle Of Wight Council are proposing to carry out Highway improvement works on Hillis Gate Road, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:36.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Pallance Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Pallance Lane, Northwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:39.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Cockleton Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Cockleton Lane, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:43.

Isle Of Wight Council logo
Between
19 and 30 May 2025
Details
View Map
Share
Follow
Cockleton Lane

Isle Of Wight Council are proposing to carry out Highway improvement works on Cockleton Lane, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 30 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 7 Feb 2025 at 09:43.

Isle Of Wight Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Worsley Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Worsley Road, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 18 Feb 2025 at 11:07.

Isle Of Wight Council logo
Between
19 and 21 May 2025
Details
View Map
Share
Follow
Worsley Road

Isle Of Wight Council are proposing to carry out Highway repair and maintenance works on Worsley Road, Gurnard.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2025 and could run through until 21 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Isle Of Wight Council on 18 Feb 2025 at 13:01.

Southern Gas Networks logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
Tuttons Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tuttons Hill, Gurnard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 23 Jan 2025 at 10:44.

Southern Gas Networks logo
Between
26 May and 13 Jun 2025
Details
View Map
Share
Follow
Tuttons Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Tuttons Hill, Gurnard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 10:44.

Southern Gas Networks logo
LONG TERM
Between
26 May and 25 Jul 2025
Details
View Map
Share
Follow
Worsley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worsley Road, Gurnard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 23 Jan 2025 at 10:51.

Southern Gas Networks logo
LONG TERM
Between
26 May and 25 Jul 2025
Details
View Map
Share
Follow
Worsley Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worsley Road, Gurnard.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 25 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 17 Feb 2025 at 14:54.


Roadworks Map near to Mayfield Drive, NEWPORT, PO30 2DH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 2 Mar 2025 19:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Mayfield Drive, NEWPORT, PO30 2DH (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
GODRIC ROAD 
(0.2 miles)
BT
Utility asset works - Verge - Some carriageway incursion
Complete
27 Feb 2025 09:54 - 15:56
0.2
Details
Share
2
Southern Water logo
URGENT
  
EAST STREET 
(0.6 miles)
Southern Water
Utility repair and maintenance works - Carriageway - Lane closure
In Progress
Since: 28 Feb 2025 10:00
(Scheduled: 28 Feb 2025 - 4 Mar 2025)
0.6
Details
Share
Follow
3
Isle Of Wight Council logo
MAJOR
  
HIGH STREET 
(0.7 miles)
Isle Of Wight Council
Highway repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 6 Jan 2025 - 30 Sep 2025)
0.7
Details
Share
4
Scottish Hydro Electric Power Dis logo
URGENT
  
RIVERWAY 
(0.8 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 27 Feb 2025 09:38
(Scheduled: 27 Feb 2025 - 5 Mar 2025)
0.8
Details
Share
Follow
5
Isle Of Wight Council logo
MAJOR
  
HEARN STREET 
(1.0 miles)
Isle Of Wight Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 24 Feb 2025 - 7 Mar 2025