ROADWORKS SUMMARY
Glenway, BOGNOR REGIS, PO22 8BU

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Glenway, PO22 8BU and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Glenway, BOGNOR REGIS, PO22 8BU

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Glenway are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

West Sussex County Council logo
LONG TERM
Between
6 Nov 2023 and 30 Dec 2024
Details
View Map
Share
Follow
Sefter Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Sefter Road, Pagham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2023 and could run through until 30 December 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 6 Nov 2024 at 08:45.

West Sussex County Council logo
LONG TERM
Between
24 Jun 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Shripney Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.

These works are categorised as Major.

The works will start on or after 24 June 2024 and could run through until 20 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 21 Jun 2024 at 11:15.

West Sussex County Council logo
LONG TERM
Between
24 Jun 2024 and 20 Dec 2025
Details
View Map
Share
Follow
Shripney Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.

These works are categorised as Major.

The works will start on or after 24 June 2024 and could run through until 20 December 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 15:05.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Upper Bognor Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Upper Bognor Road, Bognor Regis.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 08:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 08:33.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Upper Bognor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Bognor Road, Bognor Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 11:18.

Southern Gas Networks logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Bilsham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Bilsham Road, Yapton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 09:00 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 09:19.

Cityfibre Metro Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Flansham Park

Cityfibre Metro Networks are proposing to carry out Utility asset works on Flansham Park, Felpham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Cityfibre Metro Networks on 4 Oct 2024 at 14:38.

Cityfibre Metro Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Flansham Park

Cityfibre Metro Networks were proposing to carry out Utility asset works on Flansham Park, Felpham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Oct 2024 at 11:43.

West Sussex County Council logo
LONG TERM
Between
21 Oct 2024 and 21 Apr 2025
Details
View Map
Share
Follow
Stocker Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Stocker Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 October 2024 and could run through until 21 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by West Sussex County Council on 23 Sep 2024 at 10:49.

Southern Gas Networks logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Limmer Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Limmer Lane, Felpham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 21 October 2024 at 11:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 11:33.

West Sussex County Council logo
LONG TERM
Between
4 Nov 2024 and 30 Apr 2025
Details
View Map
Share
Follow
The Esplanade

West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Esplanade, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 3 Oct 2024 at 15:39.

West Sussex County Council logo
LONG TERM
Between
4 Nov 2024 and 28 Feb 2025
Details
View Map
Share
Follow
The Esplanade

West Sussex County Council are proposing to carry out Highway improvement works on The Esplanade, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 November 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 23 Oct 2024 at 11:17.

West Sussex County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
The Esplanade

West Sussex County Council are carrying out Highway improvement works on The Esplanade, Bognor Regis.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 10:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:00.

Southern Gas Networks logo
LONG TERM
Until
16 Dec 2024
Details
View Map
Share
Follow
Shripney Lane

Southern Gas Networks are carrying out Utility repair and maintenance works on Shripney Lane, Bersted.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 November 2024 at 10:25 and could run through until 16 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:00.

West Sussex County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Pagham Road

West Sussex County Council are proposing to carry out Highway improvement works on Pagham Road, Pagham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 11:06.

Portsmouth Waterworks Company logo
LONG TERM
Between
11 Nov and 20 Dec 2024
Details
View Map
Share
Fish Lane

Portsmouth Waterworks Company were proposing to carry out Utility repair and maintenance works on Fish Lane, Aldwick.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Portsmouth Waterworks Company on 15 Oct 2024 at 08:01.

West Sussex County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Tye Lane

West Sussex County Council are carrying out Highway repair and maintenance works on Tye Lane, Walberton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 November 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:52.

West Sussex County Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Orchard Way

West Sussex County Council are proposing to carry out Highway improvement works on Orchard Way, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 11:37.

West Sussex County Council logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Shripney Road

West Sussex County Council are proposing to carry out Highway improvement works on Shripney Road, Bognor Regis.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by West Sussex County Council on 6 Aug 2024 at 10:42.

Nexfibre Networks Limited logo
Between
18 Nov and 13 Dec 2024
Details
View Map
Share
Follow
Wroxham Way

Nexfibre Networks Limited are proposing to carry out New service connection on Wroxham Way, Felpham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Nexfibre Networks Limited on 25 Sep 2024 at 10:43.

Southern Gas Networks logo
LONG TERM
Between
18 Nov and 20 Dec 2024
Details
View Map
Share
Follow
Hazel Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazel Road, Bersted.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 16:22.

BT logo
Finishing
Saturday
Details
View Map
Share
Shripney Road

BT were proposing to carry out Utility asset works on Shripney Road, Bognor Regis.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 December 2024. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 10 Oct 2024 at 12:20.

BT logo
Finishing
Saturday
Details
View Map
Share
Ex A29

BT were proposing to carry out Utility asset works on Ex A29, Bersted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 November 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 10 Oct 2024 at 12:08.

Cityfibre Metro Networks logo
LONG TERM
Between
19 Nov 2024 and 20 Jan 2025
Details
View Map
Share
Follow
Flansham Park

Cityfibre Metro Networks are proposing to carry out Utility asset works on Flansham Park, Felpham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Sep 2024 at 10:55.

West Sussex County Council logo
LONG TERM
Until
20 Feb 2026
Details
View Map
Share
Follow
Clarence Road

West Sussex County Council are carrying out Highway repair and maintenance works on Clarence Road, Bognor Regis.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 November 2024 at 09:00 and could run through until 20 February 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 22 Nov 2024 at 15:27.

Southern Gas Networks logo
Between
27 Nov and 22 Dec 2024
Details
View Map
Share
Hazel Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hazel Road, Bersted.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 November 2024 and run through until 22 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 12:03.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Gossamer Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Gossamer Lane, Aldwick.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 11:26.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Cherry Close

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cherry Close, Aldwick.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 11:28.

West Sussex County Council logo
Between
2 and 18 Dec 2024
Details
View Map
Share
Follow
Queensway

West Sussex County Council are proposing to carry out Highway improvement works on Queensway, Bognor Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 6 Aug 2024 at 11:28.

Southern Gas Networks logo
Between
2 and 20 Dec 2024
Details
View Map
Share
Follow
Den Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Avenue, Bognor Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 12:28.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
North Bersted Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Bersted Street, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 16:05.

Southern Gas Networks logo
Finishing
Tomorrow
Details
View Map
Share
Follow
North Bersted Street

Southern Gas Networks are carrying out Utility repair and maintenance works on North Bersted Street, Bersted.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 December 2024 at 10:20 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:38.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Yapton Road

BT are proposing to carry out Utility asset works on Yapton Road, Middleton-on-sea.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 28 Jun 2024 at 10:29.

BT logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Yapton Road

BT are carrying out Utility asset works on Yapton Road, Middleton-on-sea.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 December 2024 at 19:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 4 Dec 2024 at 07:47.

West Sussex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Yapton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:45.

West Sussex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Yapton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:46.

West Sussex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:16.

West Sussex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:45.

West Sussex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:09.

West Sussex County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:45.

Network Rail logo
Between
7 and 12 Dec 2024
Details
View Map
Share
Lidsey Road

Network Rail were proposing to carry out Works for Rail Purposes on Lidsey Road, Woodgate.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Sep 2024 at 13:30.

Network Rail logo
Between
7 and 12 Dec 2024
Details
View Map
Share
Follow
Lidsey Road

Network Rail are proposing to carry out Works for Rail Purposes on Lidsey Road, Woodgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 4 Oct 2024 at 14:05.

Network Rail logo
Between
7 and 12 Dec 2024
Details
View Map
Share
Follow
Lidsey Road

Network Rail are proposing to carry out Works for Rail Purposes on Lidsey Road, Woodgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 29 Oct 2024 at 10:19.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
9 Dec 2024 and 28 Jan 2025
Details
View Map
Share
West Street

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on West Street, Bognor Regis.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 28 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:57.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
9 Dec 2024 and 28 Jan 2025
Details
View Map
Share
Argyle Road

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Argyle Road, Bognor Regis.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 December 2024 and run through until 28 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:58.

Southern Gas Networks logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Greencourt Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greencourt Drive, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 15:07.

Southern Gas Networks logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Greencourt Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greencourt Drive, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 14:58.

Southern Gas Networks logo
Between
16 and 20 Dec 2024
Details
View Map
Share
Follow
Central Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Drive, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 15:59.

West Sussex County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 10:34.

West Sussex County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Yapton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 10:38.

West Sussex County Council logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Lake Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Walberton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 10:35.

West Sussex County Council logo
LONG TERM
Between
19 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
The Esplanade

West Sussex County Council are proposing to carry out Highway improvement works on The Esplanade, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 30 Sep 2024 at 10:35.

West Sussex County Council logo
LONG TERM
Between
19 Dec 2024 and 31 Jan 2025
Details
View Map
Share
Follow
Clarence Road

West Sussex County Council are proposing to carry out Highway improvement works on Clarence Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 30 Sep 2024 at 10:34.

Southern Gas Networks logo
Between
2 and 31 Jan 2025
Details
View Map
Share
Follow
Madeira Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Madeira Avenue, Bognor Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 14:21.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
The Esplanade

West Sussex County Council are proposing to carry out Highway improvement works on The Esplanade, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 4 Oct 2024 at 09:09.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
The Esplanade

West Sussex County Council are proposing to carry out Highway improvement works on The Esplanade, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 13:12.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Clarence Road

West Sussex County Council are proposing to carry out Highway improvement works on Clarence Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 4 Oct 2024 at 09:08.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Clarence Road

West Sussex County Council are proposing to carry out Highway improvement works on Clarence Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 24 Oct 2024 at 13:18.

Portsmouth Waterworks Company logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Aldwick Road

Portsmouth Waterworks Company were proposing to carry out Utility repair and maintenance works on Aldwick Road, Aldwick.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Portsmouth Waterworks Company on 26 Nov 2024 at 15:50.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Upper Bognor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Bognor Road, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 16:44.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hotham Way Eastbound

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Eastbound, Bognor Regis.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 10:53.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hotham Way Eastbound

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Eastbound, Bognor Regis.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 12:57.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 13:53.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:44.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hotham Way Westbound

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Westbound, Bognor Regis.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 10:51.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hotham Way Westbound

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Westbound, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 16:43.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Hotham Way Westbound

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Westbound, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 12:46.

Southern Gas Networks logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Madeira Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Madeira Avenue, Bognor Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 13:33.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Sun Park Close

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sun Park Close, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:53.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Chalcraft Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalcraft Lane, Bersted.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:53.

Southern Gas Networks logo
Between
6 and 24 Jan 2025
Details
View Map
Share
Follow
Worms Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worms Lane, Felpham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:58.

BT logo
Between
6 and 9 Jan 2025
Details
View Map
Share
Follow
Grevatts Lane West

BT are proposing to carry out Utility asset works on Grevatts Lane West, Yapton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 24 May 2024 at 05:48.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Shripney Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:20.

West Sussex County Council logo
LONG TERM
Between
6 Jan and 9 Feb 2025
Details
View Map
Share
Follow
Shripney Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:23.

Southern Gas Networks logo
Between
6 and 25 Jan 2025
Details
View Map
Share
Follow
Lidsey Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidsey Road, Woodgate.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 10:26.

BT logo
Between
12 and 31 Jan 2025
Details
View Map
Share
Shripney Road

BT were proposing to carry out Utility asset works on Shripney Road, Bognor Regis.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Dec 2024 at 17:54.

BT logo
Between
12 and 24 Jan 2025
Details
View Map
Share
Follow
Ex A29

BT are proposing to carry out Utility asset works on Ex A29, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 4 Dec 2024 at 17:54.

BT logo
Between
12 and 31 Jan 2025
Details
View Map
Share
Ex A29

BT were proposing to carry out Utility asset works on Ex A29, Bersted.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 4 Dec 2024 at 17:39.

BT logo
Between
12 and 31 Jan 2025
Details
View Map
Share
Shripney Road

BT were proposing to carry out Utility asset works on Shripney Road, Bognor Regis.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Dec 2024 at 17:58.

BT logo
Between
12 and 24 Jan 2025
Details
View Map
Share
Follow
Lidsey Road

BT are proposing to carry out Utility asset works on Lidsey Road, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 12 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Dec 2024 at 18:03.

BT logo
Between
12 and 31 Jan 2025
Details
View Map
Share
Lidsey Road

BT were proposing to carry out Utility asset works on Lidsey Road, Bognor Regis.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Dec 2024 at 18:01.

West Sussex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Limmer Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Limmer Lane, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 23 Aug 2024 at 11:25.

West Sussex County Council logo
Between
13 and 15 Jan 2025
Details
View Map
Share
Follow
Limmer Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Limmer Lane, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Sep 2024 at 13:32.

West Sussex County Council logo
LONG TERM
Between
13 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Felpham Way

West Sussex County Council are proposing to carry out Highway improvement works on Felpham Way, Felpham.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 16:08.

Southern Gas Networks logo
Between
13 and 31 Jan 2025
Details
View Map
Share
Follow
Stroud Green Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stroud Green Drive, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:01.

Cityfibre Metro Networks logo
Between
14 and 27 Jan 2025
Details
View Map
Share
Follow
Little High Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Little High Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Oct 2024 at 11:24.

Cityfibre Metro Networks logo
Between
14 and 27 Jan 2025
Details
View Map
Share
Follow
Little High Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Little High Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Nov 2024 at 11:14.

Cityfibre Metro Networks logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Norfolk Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Norfolk Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Oct 2024 at 11:23.

Cityfibre Metro Networks logo
Between
16 and 28 Jan 2025
Details
View Map
Share
Follow
Norfolk Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Norfolk Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 28 Nov 2024 at 11:15.

West Sussex County Council logo
Between
17 and 19 Jan 2025
Details
View Map
Share
Follow
Cathedral Way Eastbound

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cathedral Way Eastbound, Chichester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Nov 2024 at 12:25.

Southern Gas Networks logo
Between
20 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Willowhale Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willowhale Avenue, Aldwick.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:29.

Southern Gas Networks logo
Between
20 Jan and 7 Feb 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 09:06.

Southern Gas Networks logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
London Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 11:21.

Southern Gas Networks logo
Between
20 and 31 Jan 2025
Details
View Map
Share
Follow
North Bersted Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Bersted Street, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:26.

Portsmouth Waterworks Company logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Shripney Lane

Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Shripney Lane, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Portsmouth Waterworks Company on 27 Nov 2024 at 15:05.

Portsmouth Waterworks Company logo
Between
20 and 24 Jan 2025
Details
View Map
Share
Follow
Shripney Lane

Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Shripney Lane, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Portsmouth Waterworks Company on 2 Dec 2024 at 11:56.

Cityfibre Metro Networks logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Follow
Sussex Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sussex Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 6 Nov 2024 at 09:37.

Cityfibre Metro Networks logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Follow
Sussex Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sussex Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 10:16.

Cityfibre Metro Networks logo
Between
22 and 27 Jan 2025
Details
View Map
Share
Sussex Street

Cityfibre Metro Networks were proposing to carry out Utility asset works on Sussex Street, Bognor Regis.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 31 Oct 2024 at 10:58.

West Sussex County Council logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Blondell Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Blondell Drive, Aldwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Oct 2024 at 13:54.

West Sussex County Council logo
Between
24 and 28 Jan 2025
Details
View Map
Share
Follow
Blondell Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Blondell Drive, Aldwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 12:36.

Portsmouth Waterworks Company logo
LONG TERM
Between
27 Jan and 7 Mar 2025
Details
View Map
Share
Follow
Church Way

Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Church Way, Pagham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Portsmouth Waterworks Company on 16 Oct 2024 at 15:09.

Southern Gas Networks logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Upper Bognor Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Bognor Road, Bognor Regis.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 09:23.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Mead Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Lane, Bognor Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:13.

Southern Gas Networks logo
LONG TERM
Between
27 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Mead Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Lane, Bognor Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 13:42.

Southern Gas Networks logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Merrion Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Merrion Avenue, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 10:57.

Southern Gas Networks logo
Between
27 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Merrion Avenue

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Merrion Avenue, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:27.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Oct 2024 at 13:39.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Church Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Lane, Barnham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Oct 2024 at 10:19.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mill Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Mill Road, Slindon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Nov 2024 at 10:04.

Scottish Hydro Electric Power Dis logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Mill Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Mill Road, Slindon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Nov 2024 at 15:26.

West Sussex County Council logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Felpham Gardens

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Gardens, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Nov 2024 at 12:54.

West Sussex County Council logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Felpham Gardens

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Gardens, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 13 Nov 2024 at 12:34.

Cityfibre Metro Networks logo
Between
30 Jan and 5 Feb 2025
Details
View Map
Share
Follow
Sussex Street

Cityfibre Metro Networks are proposing to carry out Utility asset works on Sussex Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cityfibre Metro Networks on 25 Nov 2024 at 14:03.

West Sussex County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Felpham Gardens

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Gardens, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 11:44.

West Sussex County Council logo
Between
30 Jan and 3 Feb 2025
Details
View Map
Share
Follow
Felpham Way

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Way, Felpham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 24 Oct 2024 at 21:13.

BT logo
Between
1 and 8 Feb 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Walberton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 24 Sep 2024 at 10:54.

BT logo
Between
1 and 8 Feb 2025
Details
View Map
Share
Tye Lane

BT were proposing to carry out Utility asset works on Tye Lane, Walberton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 24 Sep 2024 at 10:53.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Fernhurst Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fernhurst Gardens, Aldwick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:42.

Southern Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
High Street

Southern Water are proposing to carry out Utility repair and maintenance works on High Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 4 Nov 2024 at 11:16.

Southern Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
High Street

Southern Water are proposing to carry out Utility repair and maintenance works on High Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Water on 28 Nov 2024 at 07:36.

Southern Gas Networks logo
Between
3 and 14 Feb 2025
Details
View Map
Share
Follow
Essex Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Essex Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 10:13.

Southern Gas Networks logo
Between
3 and 16 Feb 2025
Details
View Map
Share
Follow
Sherwood Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:27.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
The Street

BT were proposing to carry out Utility asset works on The Street, Walberton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 23 Sep 2024 at 15:28.

BT logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Tye Lane

BT were proposing to carry out Utility asset works on Tye Lane, Walberton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by BT on 23 Sep 2024 at 15:28.

Network Rail logo
Between
8 and 10 Feb 2025
Details
View Map
Share
Follow
Drayton Lane

Network Rail are proposing to carry out Works for Rail Purposes on Drayton Lane, Oving.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Jul 2024 at 08:10.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Greencourt Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greencourt Drive, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:04.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Greencourt Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greencourt Drive, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 15:26.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Central Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Drive, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:04.

Southern Gas Networks logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Central Drive

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Drive, Bersted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 12:36.

West Sussex County Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Shripney Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Nov 2024 at 16:12.

West Sussex County Council logo
Between
10 and 13 Feb 2025
Details
View Map
Share
Follow
Shripney Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Nov 2024 at 16:12.

West Sussex County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Colworth Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Colworth Lane, Oving.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 1 Nov 2024 at 15:42.

West Sussex County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Colworth Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Colworth Lane, Oving.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 13:24.

West Sussex County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Colworth Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Colworth Lane, Oving.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:17.

West Sussex County Council logo
Between
14 and 17 Feb 2025
Details
View Map
Share
Follow
Belmont Street

West Sussex County Council are proposing to carry out Highway improvement works on Belmont Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 09:00.

West Sussex County Council logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Queensway

West Sussex County Council are proposing to carry out Highway improvement works on Queensway, Bognor Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 09:58.

West Sussex County Council logo
Between
24 Feb and 12 Mar 2025
Details
View Map
Share
Follow
Queensway

West Sussex County Council are proposing to carry out Highway improvement works on Queensway, Bognor Regis.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 11:08.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Pinewood Gardens

West Sussex County Council are proposing to carry out Highway improvement works on Pinewood Gardens, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:49.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Nyewood Lane

West Sussex County Council are proposing to carry out Highway improvement works on Nyewood Lane, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:45.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Pevensey Road

West Sussex County Council are proposing to carry out Highway improvement works on Pevensey Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:47.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Marshall Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Marshall Avenue, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:52.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Gravits Lane

West Sussex County Council are proposing to carry out Highway improvement works on Gravits Lane, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:51.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Highland Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Highland Avenue, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:54.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Linden Road

West Sussex County Council are proposing to carry out Highway improvement works on Linden Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:45.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Mons Avenue

West Sussex County Council are proposing to carry out Highway improvement works on Mons Avenue, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:50.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Fletcher Way

West Sussex County Council are proposing to carry out Highway improvement works on Fletcher Way, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:54.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Essex Road

West Sussex County Council are proposing to carry out Highway improvement works on Essex Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:52.

West Sussex County Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Hawthorn Road

West Sussex County Council are proposing to carry out Highway improvement works on Hawthorn Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:44.

West Sussex County Council logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Orchard Way

West Sussex County Council are proposing to carry out Highway improvement works on Orchard Way, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by West Sussex County Council on 29 Aug 2024 at 10:24.

West Sussex County Council logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Shripney Road

West Sussex County Council are proposing to carry out Highway improvement works on Shripney Road, Bognor Regis.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 10:37.

West Sussex County Council logo
LONG TERM
Between
24 Feb and 28 Mar 2025
Details
View Map
Share
Follow
Shripney Road

West Sussex County Council are proposing to carry out Highway improvement works on Shripney Road, Bognor Regis.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and cycleway.

This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:41.

Southern Gas Networks logo
LONG TERM
Between
1 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Woodlands Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bersted.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 14:15.

Southern Gas Networks logo
LONG TERM
Between
1 Mar and 1 Jul 2025
Details
View Map
Share
Follow
Woodlands Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bersted.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 March 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 11:12.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 11 Apr 2025
Details
View Map
Share
Follow
High Street

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 13:57.

BT logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Binsted Lane

BT are proposing to carry out Utility repair and maintenance works on Binsted Lane, West Sussex, Binsted.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 28 Nov 2024 at 11:05.


Roadworks Map near to Glenway, BOGNOR REGIS, PO22 8BU

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 5 Dec 2024 01:36
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Glenway, BOGNOR REGIS, PO22 8BU (67 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Southern Gas Networks logo
MAJOR
  
UPPER BOGNOR ROAD 
(0.1 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 23 Sep 2024 - 6 Dec 2024
0.1
Details
Share
Follow
2
Southern Gas Networks logo
MAJOR
  
UPPER BOGNOR ROAD 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
In Progress
Since: 23 Sep 2024 08:30
(Scheduled: 23 Sep 2024 - 20 Dec 2024)
0.2
Details
Share
Follow
3
West Sussex County Council logo
MAJOR
  
HIGHCROFT CRESCENT 
(0.2 miles)
West Sussex County Council
Highway repair and maintenance works - Footway - Road closure
Planned
Scheduled: 4 Nov 2024 - 4 May 2025
0.2
Details
Share
Follow
4
West Sussex County Council logo
MAJOR
  
HIGHCROFT CLOSE 
(0.2 miles)
West Sussex County Council
Highway repair and maintenance works - Footway - Road closure
Planned
Scheduled: 4 Nov 2024 - 4 May 2025
0.2
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
GORDON AVENUE WEST 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 2 Dec 2024 - 20 Dec 2024
0.2
Details
Share
Follow
6
Southern Gas Networks logo
MAJOR
  
GORDON AVENUE WEST 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Give and take
Cancelled
(Scheduled: 2 Dec 2024 - 20 Dec 2024)
0.2
Details
Share
7
West Sussex County Council logo
MAJOR
  
STRATTON COURT 
(0.2 miles)
West Sussex County Council
Highway repair and maintenance works - Footway - Road closure
Planned
Scheduled: 4 Nov 2024 - 4 May 2025
0.2
Details
Share
Follow
8
West Sussex County Council logo
MAJOR
  
BROOKS LANE ROAD 
(0.2 miles)
West Sussex County Council
Highway repair and maintenance works - Footway - Road closure
Planned
Scheduled: 4 Nov 2024 - 4 May 2025
0.2
Details
Share
Follow
9
West Sussex County Council logo
MAJOR
  
SHRIPNEY ROAD 
(0.2 miles)
West Sussex County Council
Highway improvement works - Footway, Verge, Cycleway - Some carriageway incursion
Planned
Scheduled: 18 Nov 2024 - 20 Dec 2024
0.2
Details
Share
Follow
10
West Sussex County Council logo
MAJOR
  
HIGHFIELD ROAD 
(0.3 miles)
West Sussex County Council
Highway improvement works - Footway, Cycleway - Some carriageway incursion
Planned
Scheduled: 18 Nov 2024 - 20 Dec 2024
0.3
Details
Share
Follow
  • ...

Contains public sector information licensed under the Open Government Licence v3.0.