ROADWORKS SUMMARY
Stroud Green Drive, BOGNOR REGIS, PO21 5TJ
Introduction
View current and future planned roadworks and road closures for Stroud Green Drive, PO21 5TJ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Stroud Green Drive, BOGNOR REGIS, PO21 5TJ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Stroud Green Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Nov 2023 and 30 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Sefter Road, Pagham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2023 and could run through until 30 December 2024. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 6 Nov 2024 at 08:45.
2 Jun 2024 and 30 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Westgate Roundabout, Chichester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 30 January 2025. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 15 May 2024 at 06:25.
24 Jun 2024 and 20 Dec 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.
These works are categorised as Major.
The works will start on or after 24 June 2024 and could run through until 20 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 21 Jun 2024 at 11:15.
24 Jun 2024 and 20 Dec 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.
These works are categorised as Major.
The works will start on or after 24 June 2024 and could run through until 20 December 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 15:05.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Upper Bognor Road, Bognor Regis.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 08:30 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 08:33.
Tomorrow
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Bognor Road, Bognor Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 13 Sep 2024 at 11:18.
4 Apr 2025
Southern Gas Networks are carrying out Utility repair and maintenance works on Bilsham Road, Yapton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 09:00 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 23 Sep 2024 at 09:19.
4 Oct 2024 and 4 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Royal Close, Chichester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 October 2024 and could run through until 4 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 19 Aug 2024 at 13:21.
Tomorrow
Cityfibre Metro Networks are proposing to carry out Utility asset works on Flansham Park, Felpham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Cityfibre Metro Networks on 4 Oct 2024 at 14:38.
Tomorrow
Cityfibre Metro Networks were proposing to carry out Utility asset works on Flansham Park, Felpham.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 October 2024 and run through until 6 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 31 Oct 2024 at 11:43.
21 Oct 2024 and 21 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Stocker Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 October 2024 and could run through until 21 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 23 Sep 2024 at 10:49.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Limmer Lane, Felpham.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 11:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 11:33.
28 Oct 2024 and 28 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Taverner Place, Chichester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 28 April 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 25 Sep 2024 at 14:09.
1 Nov 2024 and 1 May 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Mumford Place, Chichester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 November 2024 and could run through until 1 May 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by West Sussex County Council on 25 Sep 2024 at 14:01.
4 Nov 2024 and 30 Apr 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on The Esplanade, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 3 Oct 2024 at 15:39.
4 Nov 2024 and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on The Esplanade, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 23 Oct 2024 at 11:17.
28 Feb 2025
West Sussex County Council are carrying out Highway improvement works on The Esplanade, Bognor Regis.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 10:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:00.
4 Nov and 20 Dec 2024
West Sussex County Council are proposing to carry out Highway improvement works on Selsey Road, Hunston.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 9 May 2024 at 10:05.
20 Dec 2024
West Sussex County Council are carrying out Highway improvement works on Selsey Road, Hunston.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 09:10.
16 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Shripney Lane, Bersted.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 5 November 2024 at 10:25 and could run through until 16 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 12:00.
Tomorrow
West Sussex County Council are proposing to carry out Highway improvement works on Pagham Road, Pagham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 11:06.
11 Nov and 20 Dec 2024
Portsmouth Waterworks Company were proposing to carry out Utility repair and maintenance works on Fish Lane, Aldwick.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 11 November 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 15 Oct 2024 at 08:01.
20 Dec 2024
West Sussex County Council are carrying out Highway repair and maintenance works on Tye Lane, Walberton.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 14:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:52.
18 Nov and 20 Dec 2024
West Sussex County Council are proposing to carry out Highway improvement works on Orchard Way, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 11:37.
18 Nov and 20 Dec 2024
West Sussex County Council are proposing to carry out Highway improvement works on Shripney Road, Bognor Regis.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by West Sussex County Council on 6 Aug 2024 at 10:42.
18 Nov and 13 Dec 2024
Nexfibre Networks Limited are proposing to carry out New service connection on Wroxham Way, Felpham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 13 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Nexfibre Networks Limited on 25 Sep 2024 at 10:43.
18 Nov and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hazel Road, Bersted.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 16:22.
Saturday
BT were proposing to carry out Utility asset works on Shripney Road, Bognor Regis.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 7 December 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 10 Oct 2024 at 12:20.
Saturday
BT were proposing to carry out Utility asset works on Ex A29, Bersted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 18 November 2024 and run through until 7 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 10 Oct 2024 at 12:08.
19 Nov 2024 and 20 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Flansham Park, Felpham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 November 2024 and could run through until 20 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 6 Sep 2024 at 10:55.
20 Feb 2026
West Sussex County Council are carrying out Highway repair and maintenance works on Clarence Road, Bognor Regis.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 25 November 2024 at 09:00 and could run through until 20 February 2026. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 22 Nov 2024 at 15:27.
27 Nov and 22 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Hazel Road, Bersted.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 November 2024 and run through until 22 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 1 Aug 2024 at 12:03.
2 and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Gossamer Lane, Aldwick.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 11:26.
2 and 20 Dec 2024
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Cherry Close, Aldwick.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 20 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 13 Nov 2024 at 11:28.
2 and 18 Dec 2024
West Sussex County Council are proposing to carry out Highway improvement works on Queensway, Bognor Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 18 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 6 Aug 2024 at 11:28.
2 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Den Avenue, Bognor Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 29 Oct 2024 at 12:28.
Tomorrow
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Bersted Street, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 16:05.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on North Bersted Street, Bersted.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 2 December 2024 at 10:20 and could run through until 6 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 2 Dec 2024 at 10:38.
Tomorrow
BT are proposing to carry out Utility asset works on Yapton Road, Middleton-on-sea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 28 Jun 2024 at 10:29.
Tomorrow
BT are carrying out Utility asset works on Yapton Road, Middleton-on-sea.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 December 2024 at 19:00 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Dec 2024 at 07:47.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Yapton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:45.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Yapton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:46.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Walberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:16.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Walberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:45.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Barnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:09.
Tuesday
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Barnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 December 2024 and could run through until 10 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 09:45.
7 and 12 Dec 2024
Network Rail were proposing to carry out Works for Rail Purposes on Lidsey Road, Woodgate.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 7 December 2024 and run through until 12 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 10 Sep 2024 at 13:30.
7 and 12 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Lidsey Road, Woodgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 4 Oct 2024 at 14:05.
7 and 12 Dec 2024
Network Rail are proposing to carry out Works for Rail Purposes on Lidsey Road, Woodgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 December 2024 and could run through until 12 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 29 Oct 2024 at 10:19.
9 Dec 2024 and 28 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on West Street, Bognor Regis.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 28 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:57.
9 Dec 2024 and 28 Jan 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Argyle Road, Bognor Regis.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 28 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Sep 2024 at 13:58.
16 and 20 Dec 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Ham Road, Sidlesham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 25 Oct 2024 at 11:32.
16 and 20 Dec 2024
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Ham Road, Sidlesham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 2 Dec 2024 at 11:56.
16 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greencourt Drive, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Nov 2024 at 15:07.
16 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greencourt Drive, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Nov 2024 at 14:58.
16 and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Drive, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 15:59.
16 and 18 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Barnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 10:34.
16 and 18 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Yapton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 10:38.
16 and 18 Dec 2024
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Lake Lane, Walberton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 14 Oct 2024 at 10:35.
19 Dec 2024 and 31 Jan 2025
West Sussex County Council are proposing to carry out Highway improvement works on The Esplanade, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 30 Sep 2024 at 10:35.
19 Dec 2024 and 31 Jan 2025
West Sussex County Council are proposing to carry out Highway improvement works on Clarence Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 19 December 2024 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 30 Sep 2024 at 10:34.
2 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Madeira Avenue, Bognor Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 14:21.
6 Jan and 14 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on The Esplanade, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 4 Oct 2024 at 09:09.
6 Jan and 14 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on The Esplanade, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 13:12.
6 Jan and 14 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Clarence Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 4 Oct 2024 at 09:08.
6 Jan and 14 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Clarence Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 24 Oct 2024 at 13:18.
6 Jan and 7 Feb 2025
Portsmouth Waterworks Company were proposing to carry out Utility repair and maintenance works on Aldwick Road, Aldwick.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 26 Nov 2024 at 15:50.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Bognor Road, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 16:44.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Eastbound, Bognor Regis.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 10:53.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Eastbound, Bognor Regis.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 18 Oct 2024 at 12:57.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 13:53.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:44.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Westbound, Bognor Regis.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 10:51.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Westbound, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 12 Oct 2024 at 16:43.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hotham Way Westbound, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 16 Oct 2024 at 12:46.
6 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Madeira Avenue, Bognor Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 13:33.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sun Park Close, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:53.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Chalcraft Lane, Bersted.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:53.
6 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Worms Lane, Felpham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 24 January 2025. The works will impact the verge only.
This roadwork event was last updated by Southern Gas Networks on 4 Dec 2024 at 10:58.
6 and 9 Jan 2025
BT are proposing to carry out Utility asset works on Grevatts Lane West, Yapton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 24 May 2024 at 05:48.
6 Jan and 9 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:20.
6 Jan and 9 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 25 Oct 2024 at 12:23.
6 and 25 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Lidsey Road, Woodgate.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 25 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Sep 2024 at 10:26.
6 Jan and 7 Feb 2025
Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Oving Road, Chichester.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 17 Oct 2024 at 07:59.
12 and 31 Jan 2025
BT were proposing to carry out Utility asset works on Shripney Road, Bognor Regis.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 4 Dec 2024 at 17:54.
12 and 24 Jan 2025
BT are proposing to carry out Utility asset works on Ex A29, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 4 Dec 2024 at 17:54.
12 and 31 Jan 2025
BT were proposing to carry out Utility asset works on Ex A29, Bersted.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 4 Dec 2024 at 17:39.
12 and 31 Jan 2025
BT were proposing to carry out Utility asset works on Shripney Road, Bognor Regis.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 4 Dec 2024 at 17:58.
12 and 24 Jan 2025
BT are proposing to carry out Utility asset works on Lidsey Road, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 January 2025 and could run through until 24 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 4 Dec 2024 at 18:03.
12 and 31 Jan 2025
BT were proposing to carry out Utility asset works on Lidsey Road, Bognor Regis.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 12 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by BT on 4 Dec 2024 at 18:01.
13 and 15 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Limmer Lane, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 23 Aug 2024 at 11:25.
13 and 15 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Limmer Lane, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 6 Sep 2024 at 13:32.
13 Jan and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Felpham Way, Felpham.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 16:08.
13 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Stroud Green Drive, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 21 Oct 2024 at 14:01.
13 Jan and 28 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Westgate Roundabout, Chichester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 21 Nov 2024 at 12:51.
13 Jan and 21 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Westgate Roundabout, Chichester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 21 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by West Sussex County Council on 20 Nov 2024 at 10:15.
14 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Little High Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 25 Oct 2024 at 11:24.
14 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Little High Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 January 2025 and could run through until 27 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Cityfibre Metro Networks on 28 Nov 2024 at 11:14.
16 and 28 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Norfolk Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 25 Oct 2024 at 11:23.
16 and 28 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Norfolk Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 28 Nov 2024 at 11:15.
17 and 19 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Cathedral Way Eastbound, Chichester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 January 2025 and could run through until 19 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 21 Nov 2024 at 12:25.
20 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Willowhale Avenue, Aldwick.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:29.
20 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 09:06.
20 and 24 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on London Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 11:21.
20 and 31 Jan 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on North Bersted Street, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 31 January 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:26.
20 and 24 Jan 2025
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Shripney Lane, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Portsmouth Waterworks Company on 27 Nov 2024 at 15:05.
20 and 24 Jan 2025
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Shripney Lane, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 24 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Portsmouth Waterworks Company on 2 Dec 2024 at 11:56.
22 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Sussex Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 6 Nov 2024 at 09:37.
22 and 27 Jan 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Sussex Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 27 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 22 Nov 2024 at 10:16.
22 and 27 Jan 2025
Cityfibre Metro Networks were proposing to carry out Utility asset works on Sussex Street, Bognor Regis.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 January 2025 and run through until 27 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 31 Oct 2024 at 10:58.
22 and 24 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Swanfield Drive, Chichester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 29 Oct 2024 at 14:26.
22 and 24 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Swanfield Drive, Chichester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 4 Nov 2024 at 10:58.
24 and 28 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Blondell Drive, Aldwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 30 Oct 2024 at 13:54.
24 and 28 Jan 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Blondell Drive, Aldwick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 January 2025 and could run through until 28 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 31 Oct 2024 at 12:36.
27 and 31 Jan 2025
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Mill Lane, Sidlesham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Portsmouth Waterworks Company on 27 Nov 2024 at 14:59.
27 and 31 Jan 2025
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Mill Lane, Sidlesham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Portsmouth Waterworks Company on 3 Dec 2024 at 11:43.
27 Jan and 7 Mar 2025
Portsmouth Waterworks Company are proposing to carry out Utility repair and maintenance works on Church Way, Pagham.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Portsmouth Waterworks Company on 16 Oct 2024 at 15:09.
27 Jan and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Upper Bognor Road, Bognor Regis.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 14 Oct 2024 at 09:23.
27 Jan and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Lane, Bognor Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 3 Oct 2024 at 09:13.
27 Jan and 14 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Mead Lane, Bognor Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 27 Sep 2024 at 13:42.
27 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Merrion Avenue, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 10:57.
27 Jan and 7 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Merrion Avenue, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:27.
27 and 31 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Lane, Barnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Oct 2024 at 13:39.
27 and 31 Jan 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Lane, Barnham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Oct 2024 at 10:19.
29 Jan and 1 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Gardens, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 12 Nov 2024 at 12:54.
29 Jan and 1 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Gardens, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 13 Nov 2024 at 12:34.
30 Jan and 5 Feb 2025
Cityfibre Metro Networks are proposing to carry out Utility asset works on Sussex Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cityfibre Metro Networks on 25 Nov 2024 at 14:03.
30 Jan and 3 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Gardens, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 5 Nov 2024 at 11:44.
30 Jan and 3 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Felpham Way, Felpham.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 3 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 24 Oct 2024 at 21:13.
1 and 8 Feb 2025
BT were proposing to carry out Utility asset works on The Street, Walberton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 24 Sep 2024 at 10:54.
1 and 8 Feb 2025
BT were proposing to carry out Utility asset works on Tye Lane, Walberton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 1 February 2025 and run through until 8 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 24 Sep 2024 at 10:53.
3 Feb and 28 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fernhurst Gardens, Aldwick.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 15 Nov 2024 at 14:42.
3 and 5 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on High Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 4 Nov 2024 at 11:16.
3 and 5 Feb 2025
Southern Water are proposing to carry out Utility repair and maintenance works on High Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Southern Water on 28 Nov 2024 at 07:36.
3 and 14 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Essex Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 10:13.
3 and 16 Feb 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Sherwood Road, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 13:27.
3 Feb and 14 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Portfield Way, Chichester.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 22 Nov 2024 at 10:35.
3 and 5 Feb 2025
BT were proposing to carry out Utility asset works on The Street, Walberton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 23 Sep 2024 at 15:28.
3 and 5 Feb 2025
BT were proposing to carry out Utility asset works on Tye Lane, Walberton.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 3 February 2025 and run through until 5 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 23 Sep 2024 at 15:28.
5 and 7 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Whyke Road, Chichester.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 28 Oct 2024 at 09:14.
8 and 10 Feb 2025
Network Rail are proposing to carry out Works for Rail Purposes on Drayton Lane, Oving.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 February 2025 and could run through until 10 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Jul 2024 at 08:10.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greencourt Drive, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:04.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Greencourt Drive, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 11 Oct 2024 at 15:26.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Drive, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 7 Oct 2024 at 11:04.
10 Feb and 7 Mar 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Central Drive, Bersted.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 9 Oct 2024 at 12:36.
10 and 13 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 14 Nov 2024 at 16:12.
10 and 13 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Shripney Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 14 Nov 2024 at 16:12.
11 and 13 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Colworth Lane, Oving.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 1 Nov 2024 at 15:42.
11 and 13 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Colworth Lane, Oving.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 13:24.
11 and 13 Feb 2025
West Sussex County Council are proposing to carry out Highway repair and maintenance works on Colworth Lane, Oving.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 11 Nov 2024 at 14:17.
14 and 17 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Belmont Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 February 2025 and could run through until 17 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 15 Oct 2024 at 09:00.
24 Feb and 12 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Queensway, Bognor Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 12 Aug 2024 at 09:58.
24 Feb and 12 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Queensway, Bognor Regis.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 12 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by West Sussex County Council on 14 Aug 2024 at 11:08.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Pinewood Gardens, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:49.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Nyewood Lane, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:45.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Pevensey Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:47.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Marshall Avenue, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:52.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Gravits Lane, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:51.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Highland Avenue, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:54.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Linden Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:45.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Mons Avenue, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:50.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Fletcher Way, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:54.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Essex Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:52.
24 and 26 Feb 2025
West Sussex County Council are proposing to carry out Highway improvement works on Hawthorn Road, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by West Sussex County Council on 16 Oct 2024 at 15:44.
24 Feb and 28 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Orchard Way, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by West Sussex County Council on 29 Aug 2024 at 10:24.
24 Feb and 28 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Shripney Road, Bognor Regis.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by West Sussex County Council on 3 Sep 2024 at 10:37.
24 Feb and 28 Mar 2025
West Sussex County Council are proposing to carry out Highway improvement works on Shripney Road, Bognor Regis.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and cycleway.
This roadwork event was last updated by West Sussex County Council on 9 Sep 2024 at 11:41.
1 Mar and 1 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bersted.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 8 Aug 2024 at 14:15.
1 Mar and 1 Jul 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Woodlands Road, Bersted.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 1 March 2025 and could run through until 1 July 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 28 Aug 2024 at 11:12.
3 Mar and 11 Apr 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on High Street, Bognor Regis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 11 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 13:57.
Roadworks Map near to Stroud Green Drive, BOGNOR REGIS, PO21 5TJ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Stroud Green Drive, BOGNOR REGIS, PO21 5TJ (34 Events)
(Scheduled Dates)
(miles)
(Scheduled: 2 Dec 2024 - 5 Dec 2024)
(Scheduled: 29 Nov 2024 - 12 Dec 2024)
(Scheduled: 21 Oct 2024 - 18 Dec 2024)
(Scheduled: 2 Dec 2024 - 6 Dec 2024)
(Scheduled: 20 Nov 2024 - 11 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.