ROADWORKS SUMMARY
Townsend Drive, PO20 0GA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Townsend Drive, PO20 0GA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Townsend Drive, PO20 0GA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Townsend Drive are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Fernhurst Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fernhurst Gardens, Aldwick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 12 Dec 2024 at 12:20.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Hillfield Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Hillfield Road, Selsey.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 25 Oct 2024 at 13:22.

Southern Gas Networks logo
LONG TERM
Until
24 Apr 2025
Details
View Map
Share
Follow
Fernhurst Gardens

Southern Gas Networks are carrying out Utility repair and maintenance works on Fernhurst Gardens, Aldwick.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 February 2025 at 08:00 and could run through until 24 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Feb 2025 at 08:15.

Southern Gas Networks logo
Between
3 and 31 Mar 2025
Details
View Map
Share
East Street

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on East Street, Selsey.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 28 Nov 2024 at 12:30.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 25 Apr 2025
Details
View Map
Share
Follow
Fernhurst Gardens

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fernhurst Gardens, Aldwick.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 27 Jan 2025 at 08:46.

Southern Gas Networks logo
Between
10 and 31 Mar 2025
Details
View Map
Share
Bonnar Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bonnar Road, Selsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 31 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 15:12.

West Sussex County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Pagham Road

West Sussex County Council are carrying out Highway improvement works on Pagham Road, Pagham.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 March 2025 at 07:30 and could run through until 28 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 10 Mar 2025 at 08:26.

Southern Gas Networks logo
LONG TERM
Between
10 Mar and 10 Apr 2025
Details
View Map
Share
Coxes Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Coxes Road, Selsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 10 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 13 Dec 2024 at 15:07.

Southern Gas Networks logo
Finishing
Wednesday
Details
View Map
Share
Follow
Fernhurst Gardens

Southern Gas Networks are carrying out Utility repair and maintenance works on Fernhurst Gardens, Aldwick.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 March 2025 at 10:15 and could run through until 26 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 18 Mar 2025 at 13:40.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Ham Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Ham Lane, Sidlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 9 Jan 2025 at 13:26.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Follow
Ham Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Ham Lane, Sidlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Dec 2024 at 11:15.

West Sussex County Council logo
Finishing
Saturday
Details
View Map
Share
Follow
Stocker Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Stocker Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Feb 2025 at 09:53.

West Sussex County Council logo
LONG TERM
Between
29 Mar and 29 Sep 2025
Details
View Map
Share
Follow
Stocker Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Stocker Road, Bognor Regis.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 March 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Feb 2025 at 09:59.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Bracklesham Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Bracklesham Lane, Bracklesham.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 9 May 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 6 Mar 2025 at 09:55.

Southern Gas Networks logo
LONG TERM
Between
31 Mar and 9 May 2025
Details
View Map
Share
Follow
Bracklesham Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bracklesham Lane, Bracklesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 13:31.

West Sussex County Council logo
Between
1 and 7 Apr 2025
Details
View Map
Share
Follow
Marine Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Marine Drive, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 18 Mar 2025 at 10:30.

West Sussex County Council logo
Between
1 and 7 Apr 2025
Details
View Map
Share
Follow
Marine Drive

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Marine Drive, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Feb 2025 at 19:48.

West Sussex County Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Main Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Main Road, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 12 Feb 2025 at 12:29.

West Sussex County Council logo
Between
2 and 7 Apr 2025
Details
View Map
Share
Follow
Crooked Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crooked Lane, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Mar 2025 at 13:20.

West Sussex County Council logo
Between
2 and 7 Apr 2025
Details
View Map
Share
Follow
Crooked Lane

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Crooked Lane, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 7 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Mar 2025 at 10:49.

West Sussex County Council logo
Between
2 and 4 Apr 2025
Details
View Map
Share
Follow
Main Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Main Road, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 April 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Feb 2025 at 11:54.

West Sussex County Council logo
Between
3 and 8 Apr 2025
Details
View Map
Share
Follow
Willowhale Avenue

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Willowhale Avenue, Aldwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 18 Mar 2025 at 08:52.

Southern Gas Networks logo
LONG TERM
Between
7 Apr and 16 May 2025
Details
View Map
Share
Follow
Bracklesham Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Bracklesham Lane, Bracklesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 16 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Mar 2025 at 14:43.

West Sussex County Council logo
On
8 Apr 2025
Details
View Map
Share
Follow
Grove Road

West Sussex County Council are proposing to carry out Highway improvement works on Grove Road, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 8 April 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Mar 2025 at 07:31.

West Sussex County Council logo
On
11 Apr 2025
Details
View Map
Share
Follow
Sea Lane Westbound

West Sussex County Council are proposing to carry out Highway improvement works on Sea Lane Westbound, Pagham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 11 April 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Mar 2025 at 07:36.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Marisfield Place

West Sussex County Council were proposing to carry out Highway improvement works on Marisfield Place, Selsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 11:33.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Constable Drive

West Sussex County Council are proposing to carry out Highway improvement works on Constable Drive, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 09:21.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
East Beach Road

West Sussex County Council are proposing to carry out Highway improvement works on East Beach Road, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 09:25.

West Sussex County Council logo
LONG TERM
Between
14 Apr and 3 Jun 2025
Details
View Map
Share
Follow
Bracklesham Lane

West Sussex County Council are proposing to carry out Highway improvement works on Bracklesham Lane, Bracklesham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 3 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by West Sussex County Council on 7 Mar 2025 at 13:18.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Marisfield Place

West Sussex County Council were proposing to carry out Highway improvement works on Marisfield Place, Selsey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 April 2025 and run through until 17 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 14:02.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Marisfield Place

West Sussex County Council are proposing to carry out Highway improvement works on Marisfield Place, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 19 Feb 2025 at 12:57.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Manor Road

West Sussex County Council are proposing to carry out Highway improvement works on Manor Road, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 09:21.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Marisfield Place

West Sussex County Council are proposing to carry out Highway improvement works on Marisfield Place, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Feb 2025 at 09:37.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Manor Lane

West Sussex County Council are proposing to carry out Highway improvement works on Manor Lane, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 09:24.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Beach Road Service Road

West Sussex County Council are proposing to carry out Highway improvement works on Beach Road Service Road, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 09:23.

West Sussex County Council logo
Between
14 and 17 Apr 2025
Details
View Map
Share
Follow
Beach Road

West Sussex County Council are proposing to carry out Highway improvement works on Beach Road, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 17 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 09:22.

West Sussex County Council logo
Between
16 and 23 Apr 2025
Details
View Map
Share
Follow
Crooked Lane

West Sussex County Council are proposing to carry out Permanent reinstatement on Crooked Lane, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 20 Mar 2025 at 13:28.

West Sussex County Council logo
Between
16 and 23 Apr 2025
Details
View Map
Share
Follow
Crooked Lane

West Sussex County Council are proposing to carry out Permanent reinstatement on Crooked Lane, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Mar 2025 at 13:40.

West Sussex County Council logo
Between
16 and 23 Apr 2025
Details
View Map
Share
Marine Drive

West Sussex County Council were proposing to carry out Permanent reinstatement on Marine Drive, West Wittering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 April 2025 and run through until 23 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Feb 2025 at 20:37.

West Sussex County Council logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Marine Drive

West Sussex County Council are proposing to carry out Permanent reinstatement on Marine Drive, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 18 Mar 2025 at 10:35.

West Sussex County Council logo
Between
22 and 28 Apr 2025
Details
View Map
Share
Follow
Marine Drive

West Sussex County Council are proposing to carry out Permanent reinstatement on Marine Drive, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 17 Feb 2025 at 20:41.

West Sussex County Council logo
Between
24 and 30 Apr 2025
Details
View Map
Share
Follow
Willowhale Avenue

West Sussex County Council are proposing to carry out Permanent reinstatement on Willowhale Avenue, Aldwick.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 April 2025 and could run through until 30 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 18 Mar 2025 at 08:57.

West Sussex County Council logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Church Lane

West Sussex County Council are proposing to carry out Highway improvement works on Church Lane, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 7 Feb 2025 at 15:31.

West Sussex County Council logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Court Barn Road

West Sussex County Council are proposing to carry out Highway improvement works on Court Barn Road, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 6 Feb 2025 at 09:28.

Scottish Hydro Electric Power Dis logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Mill Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Mill Lane, Sidlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Feb 2025 at 09:12.

West Sussex County Council logo
Between
6 and 16 May 2025
Details
View Map
Share
Follow
Lower Bognor Road

West Sussex County Council are proposing to carry out Highway improvement works on Lower Bognor Road, Lagness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 13 Feb 2025 at 09:44.

West Sussex County Council logo
Between
6 and 16 May 2025
Details
View Map
Share
Follow
Pagham Road

West Sussex County Council are proposing to carry out Highway improvement works on Pagham Road, Runcton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 13 Feb 2025 at 09:45.

West Sussex County Council logo
Between
6 and 16 May 2025
Details
View Map
Share
Follow
Pagham Road

West Sussex County Council are proposing to carry out Highway improvement works on Pagham Road, Pagham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 13 Feb 2025 at 09:44.

Scottish Hydro Electric Power Dis logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Mill Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Mill Lane, Sidlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Feb 2025 at 11:44.

Scottish Hydro Electric Power Dis logo
Between
6 and 23 May 2025
Details
View Map
Share
Follow
Mill Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Mill Lane, Sidlesham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 May 2025 and could run through until 23 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Feb 2025 at 15:44.

West Sussex County Council logo
Between
13 and 17 May 2025
Details
View Map
Share
Follow
Chichester Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 May 2025 and could run through until 17 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Dec 2024 at 08:54.

West Sussex County Council logo
On
16 May 2025
Details
View Map
Share
Follow
Pagham Road

West Sussex County Council are proposing to carry out Highway improvement works on Pagham Road, Runcton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works are scheduled for 16 May 2025 and are due to last for only one day. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Mar 2025 at 13:13.

Portsmouth Waterworks Company logo
Between
26 May and 23 Jun 2025
Details
View Map
Share
Follow
Church Way

Portsmouth Waterworks Company are proposing to carry out Utility asset works on Church Way, Pagham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 23 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Portsmouth Waterworks Company on 21 Mar 2025 at 09:56.

West Sussex County Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Beach Road Service Road

West Sussex County Council are proposing to carry out Highway improvement works on Beach Road Service Road, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 09:05.

West Sussex County Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
East Beach Road

West Sussex County Council are proposing to carry out Highway improvement works on East Beach Road, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 09:18.

West Sussex County Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Constable Drive

West Sussex County Council are proposing to carry out Highway improvement works on Constable Drive, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 09:14.

West Sussex County Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Marisfield Place

West Sussex County Council are proposing to carry out Highway improvement works on Marisfield Place, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 14 Jan 2025 at 16:21.

West Sussex County Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Marisfield Place

West Sussex County Council are proposing to carry out Highway improvement works on Marisfield Place, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Jan 2025 at 11:50.

West Sussex County Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Marisfield Place

West Sussex County Council are proposing to carry out Highway improvement works on Marisfield Place, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 29 Jan 2025 at 13:31.

West Sussex County Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Manor Lane

West Sussex County Council are proposing to carry out Highway improvement works on Manor Lane, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 08:58.

West Sussex County Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Beach Road

West Sussex County Council are proposing to carry out Highway improvement works on Beach Road, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 08:53.

West Sussex County Council logo
Between
2 and 9 Jun 2025
Details
View Map
Share
Follow
Manor Road

West Sussex County Council are proposing to carry out Highway improvement works on Manor Road, Selsey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 09:07.

West Sussex County Council logo
Between
2 and 6 Jun 2025
Details
View Map
Share
Follow
Chichester Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 10 Mar 2025 at 14:29.

LONG TERM
Between
9 Jun and 25 Jul 2025
Details
View Map
Share
Follow
Clappers Lane

Last Mile Gas are proposing to carry out New service connection on Clappers Lane, Earnley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Gas on 17 Mar 2025 at 10:53.

West Sussex County Council logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Chichester Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Feb 2025 at 11:20.

Hertfordshire County Council logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Chichester Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 14 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Dec 2024 at 15:29.

West Sussex County Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Court Barn Road

West Sussex County Council are proposing to carry out Highway improvement works on Court Barn Road, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Jan 2025 at 15:44.

West Sussex County Council logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Church Lane

West Sussex County Council are proposing to carry out Highway improvement works on Church Lane, Birdham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Jan 2025 at 15:43.

West Sussex County Council logo
Between
9 and 14 Jun 2025
Details
View Map
Share
Follow
Chichester Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 14 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Dec 2024 at 10:07.

West Sussex County Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Chichester Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 28 Feb 2025 at 11:24.

West Sussex County Council logo
Between
16 and 18 Jun 2025
Details
View Map
Share
Follow
Chichester Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 18 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Dec 2024 at 10:48.

Hertfordshire County Council logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Chichester Road

Hertfordshire County Council were proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 June 2025 and run through until 21 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Hertfordshire County Council on 17 Dec 2024 at 15:29.

West Sussex County Council logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Chichester Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 21 Mar 2025 at 10:51.

West Sussex County Council logo
Between
18 and 21 Jun 2025
Details
View Map
Share
Follow
Chichester Road

West Sussex County Council are proposing to carry out Highway repair and maintenance works on Chichester Road, West Wittering.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 30 Dec 2024 at 11:24.

West Sussex County Council logo
Between
19 and 30 Jun 2025
Details
View Map
Share
Follow
Pagham Road

West Sussex County Council are proposing to carry out Highway improvement works on Pagham Road, Pagham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 11:56.

West Sussex County Council logo
Between
19 and 30 Jun 2025
Details
View Map
Share
Follow
Pagham Road

West Sussex County Council are proposing to carry out Highway improvement works on Pagham Road, Runcton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 11:58.

West Sussex County Council logo
Between
19 and 30 Jun 2025
Details
View Map
Share
Follow
Lower Bognor Road

West Sussex County Council are proposing to carry out Highway improvement works on Lower Bognor Road, Lagness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 June 2025 and could run through until 30 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Sussex County Council on 31 Jan 2025 at 11:55.


Roadworks Map near to Townsend Drive, PO20 0GA

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Mar 2025 07:27
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Townsend Drive, PO20 0GA (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
West Sussex County Council logo
MAJOR
  
PARK LANE 
(0.4 miles)
West Sussex County Council
Works for road purposes - Footway, Carriageway, Verge - No carriageway incursion
Planned
Scheduled: 6 Nov 2024 - 6 May 2025
0.4
Details
Share
Follow
2
Portsmouth Waterworks Company logo
MARINE DRIVE 
(0.6 miles)
Portsmouth Waterworks Company
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 21 Mar 2025 11:38
(Scheduled: 21 Mar 2025 - 25 Mar 2025)
0.6
Details
Share
Follow
3
West Sussex County Council logo
MAJOR
  
LINGFIELD WAY 
(0.6 miles)
West Sussex County Council
Works for road purposes - Footway, Carriageway, Verge - Give and take
Planned
Scheduled: 21 Feb 2025 - 19 Aug 2025
0.6
Details
Share
Follow
4
BT logo
HORSEFIELD ROAD 
(0.7 miles)
BT
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 24 Mar 2025 - 26 Mar 2025
0.7
Details
Share
Follow
5
Southern Gas Networks logo
MAJOR
  
EAST STREET 
(0.7 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Multi-way signals
Cancelled
(Scheduled: 3 Mar 2025 - 31 Mar 2025)
0.7
Details
Share
6
BT logo
GRAFTON ROAD, WEST SUSSEX 
(0.9 miles)
BT
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 20 Mar 2025 - 24 Mar 2025
0.9
Details
Share
Follow
7
BT logo
GRAFTON ROAD, WEST SUSSEX 
(0.9 miles)
BT
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 24 Mar 2025 - 26 Mar 2025
0.9
Details
Share
Follow
8
Southern Gas Networks logo
MAJOR
  
HILLFIELD ROAD 
(1.0 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway, Carriageway, Verge - Multi-way signals
Planned
Scheduled: 10 Feb 2025 - 24 Mar 2025
1.0
Details
Share
Follow
9
Southern Gas Networks logo
MAJOR
  
BONNAR ROAD 
(1.0 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway - Road closure
Cancelled
(Scheduled: 10 Mar 2025 - 31 Mar 2025)
1.0
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.