ROADWORKS SUMMARY
Penwinnick Road, ST. AUSTELL, PL25 5DP
Introduction
View current and future planned roadworks and road closures for Penwinnick Road, PL25 5DP and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Penwinnick Road, ST. AUSTELL, PL25 5DP
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Penwinnick Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Jun 2025
Cornwall Council are carrying out Highway repair and maintenance works on Tywardreath Hill, Par.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2020 at 11:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 1 Oct 2024 at 18:56.
25 Apr 2025
Cornwall Council are carrying out Highway repair and maintenance works on Road From Rostowrack Downs To Goonamarris, Goonamarris, St Stephen.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2020 at 07:30 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 30 May 2024 at 09:23.
7 Feb 2025
Cornwall Council are carrying out Highway repair and maintenance works on Roslyn Close, St Austell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 June 2024 at 15:00 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 27 Nov 2024 at 10:25.
28 Feb 2025
Cornwall Council are carrying out Highway repair and maintenance works on Landrew Road, St Austell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 December 2024 at 13:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 24 Dec 2024 at 14:22.
4 and 12 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Eliot Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 16 Sep 2024 at 21:26.
4 and 12 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Eliot Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 16 Sep 2024 at 08:42.
6 and 10 Jan 2025
Wildanet are proposing to carry out Utility asset works on Market Square, Mevagissey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wildanet on 23 Sep 2024 at 05:40.
6 and 10 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Sandy Hill, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 5 Dec 2024 at 09:26.
6 and 10 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Sandy Hill, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 14 Oct 2024 at 08:51.
6 and 10 Jan 2025
South West Water were proposing to carry out Utility repair and maintenance works on Sandy Hill, St Austell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by South West Water on 14 Oct 2024 at 08:15.
6 and 10 Jan 2025
Wildanet are proposing to carry out Utility asset works on Market Square, Mevagissey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wildanet on 10 Sep 2024 at 07:21.
6 and 10 Jan 2025
Wildanet were proposing to carry out Utility asset works on Road From Trevithick Hill To Edge Corner, Polmassick, St Austell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 18 Dec 2024 at 18:42.
6 and 15 Jan 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on Hendra Road, St Dennis.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 15 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 24 Oct 2024 at 13:43.
7 and 9 Jan 2025
BT are proposing to carry out Utility asset works on St Blazey Road, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Oct 2024 at 07:19.
8 and 10 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Hendra Road, St Dennis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 25 Oct 2024 at 09:59.
8 and 10 Jan 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Hendra Road, St Dennis.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 4 Dec 2024 at 14:00.
10 and 14 Jan 2025
Wildanet were proposing to carry out Utility asset works on Tregear Hill, Polmassick, St Austell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 January 2025 and run through until 14 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 18 Dec 2024 at 18:43.
13 and 20 Jan 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Belmont Road, St Austell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 19 Sep 2024 at 15:59.
13 and 20 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belmont Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Wales And West Utilities on 27 Nov 2024 at 15:13.
13 and 20 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belmont Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Wales And West Utilities on 28 Nov 2024 at 05:52.
27 Jan and 14 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Layby On B3273, London Apprentice, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 10 Dec 2024 at 09:20.
27 Jan and 14 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on B3273 Between London Apprentice And Trewhiddle Gate, London Apprentice, St Austell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 27 Nov 2024 at 15:00.
27 Jan and 14 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on B3273 Between London Apprentice And Trewhiddle Gate, London Apprentice, St Austell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 10 Dec 2024 at 09:20.
27 Jan and 14 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Layby On B3273, London Apprentice, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 27 Nov 2024 at 15:08.
29 and 31 Jan 2025
South West Water are proposing to carry out Utility asset works on Middleway, St Blazey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 29 Oct 2024 at 11:53.
3 and 7 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Currian Road, Nanpean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 5 Nov 2024 at 09:37.
3 and 7 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3287 Between The A390 South Of Polglaze And Fair Cross, Grampound.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 19 Nov 2024 at 13:16.
3 and 7 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Currian Hill, Currian Vale, Nanpean.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 5 Nov 2024 at 09:37.
10 Feb and 14 Mar 2025
Cornwall Council are proposing to carry out Highway improvement works on Fairway, Carlyon Bay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 12 Dec 2024 at 12:04.
15 Feb and 18 May 2025
Network Rail were proposing to carry out Works for Rail Purposes on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 15 February 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 18 Dec 2024 at 12:40.
17 Feb and 7 Mar 2025
Cornwall Council are proposing to carry out Highway improvement works on Phernyssick Road, St Austell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 20 Dec 2024 at 13:06.
17 and 21 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on St Marys Road, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 16 Aug 2024 at 14:49.
19 and 21 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on Holmbush Arch Road, St Austell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Dec 2024 at 20:13.
24 Feb and 31 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 11:24.
24 Feb and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 11:07.
24 Feb and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 20 Nov 2024 at 07:37.
3 and 5 Mar 2025
BT are proposing to carry out Utility asset works on Luxulyan Road, St Blazey Gate, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 21 Oct 2024 at 09:29.
3 and 28 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on Bodmin Road, Bilberry, Bugle.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 22 Dec 2024 at 17:20.
3 Mar and 4 Apr 2025
Cornwall Council are proposing to carry out Highway improvement works on Fairway, Carlyon Bay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 11 Dec 2024 at 13:31.
4 and 7 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on North East Distributor Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 6 Dec 2024 at 09:46.
4 and 7 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on North East Distributor Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 17 Dec 2024 at 12:43.
10 and 16 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 31 Oct 2024 at 11:51.
10 and 16 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Oct 2024 at 13:25.
10 and 14 Mar 2025
South West Water are proposing to carry out New service connection on Windsor Drive, Carlyon Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South West Water on 2 Dec 2024 at 08:59.
10 and 14 Mar 2025
South West Water are proposing to carry out New service connection on Windsor Drive, Carlyon Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South West Water on 27 Nov 2024 at 09:24.
17 and 21 Mar 2025
BT are proposing to carry out Utility asset works on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 10 Dec 2024 at 09:39.
23 and 28 Mar 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Daniels Lane, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 20 Dec 2024 at 14:44.
24 and 28 Mar 2025
BT are proposing to carry out Utility asset works on A390 Between Truro Road And Coliza Hill, St Mewan, St Austell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Dec 2024 at 06:55.
24 Mar and 11 Apr 2025
South West Water are proposing to carry out Utility repair and maintenance works on Bilberry Road From Bilberry House To Junction With Bodmin Road, Bilberry, Bugle.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 11 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 22 Dec 2024 at 17:21.
24 and 28 Mar 2025
BT are proposing to carry out Utility asset works on Tregongeeves Lane, St Austell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Dec 2024 at 06:55.
24 and 28 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Agar Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 5 Dec 2024 at 14:35.
24 and 28 Mar 2025
BT are proposing to carry out Utility asset works on Coliza Hill, Trelowth, St Austell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 18 Dec 2024 at 06:54.
24 and 29 Mar 2025
BT are proposing to carry out Utility asset works on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 23 Dec 2024 at 11:36.
24 and 29 Mar 2025
BT are proposing to carry out Utility asset works on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 19 Dec 2024 at 08:33.
24 and 28 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on Agar Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 28 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 17 Dec 2024 at 12:42.
Roadworks Map near to Penwinnick Road, ST. AUSTELL, PL25 5DP
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Penwinnick Road, ST. AUSTELL, PL25 5DP (6 Events)
(Scheduled Dates)
(miles)
(Scheduled: 24 Dec 2024 - 8 Jan 2025)
(Scheduled: 4 Nov 2024 - 31 Jan 2025)
(Scheduled: 20 Dec 2024 - 30 Dec 2024)
(Scheduled: 23 Dec 2024 - 31 Dec 2024)
(Scheduled: 24 Dec 2024 - 2 Jan 2025)
Contains public sector information licensed under the Open Government Licence v3.0.