ROADWORKS SUMMARY
The Mews, Fore Street, PAR, PL24 2NY
Introduction
View current and future planned roadworks and road closures for The Mews, Fore Street, PL24 2NY and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to The Mews, Fore Street, PAR, PL24 2NY
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Mews, Fore Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
6 Jun 2025
Cornwall Council are carrying out Highway repair and maintenance works on Tywardreath Hill, Par.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 July 2020 at 11:00 and could run through until 6 June 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 1 Oct 2024 at 18:56.
21 Feb 2025
Cornwall Council are carrying out Highway repair and maintenance works on Terras Hill, Lostwithiel.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 February 2024 at 12:00 and could run through until 21 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cornwall Council on 22 Oct 2024 at 13:08.
7 Feb 2025
Cornwall Council are carrying out Highway repair and maintenance works on Roslyn Close, St Austell.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 June 2024 at 15:00 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 27 Nov 2024 at 10:25.
Monday
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Polscoe Road, Polscoe, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 2 December 2024 and run through until 23 December 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 6 Dec 2024 at 10:21.
Monday
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Polscoe Road, Polscoe, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 23 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 13 Aug 2024 at 06:47.
Friday
Cornwall Council are proposing to carry out Highway improvement works on Truro Road, St Austell.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 20 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cornwall Council on 31 Oct 2024 at 11:56.
Today
Cornwall Council are carrying out Highway repair and maintenance works on Road From Tremains Wood To Rock Mill, Prideaux, St Blazey.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 December 2024 at 08:00 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 16 Dec 2024 at 10:24.
Today
Cornwall Council are carrying out Highway repair and maintenance works on Road From Rock Mill To Middle Greadow, Luxulyan.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 December 2024 at 08:00 and could run through until 18 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 16 Dec 2024 at 10:24.
4 and 12 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Eliot Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 16 Sep 2024 at 08:42.
4 and 12 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Eliot Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 January 2025 and could run through until 12 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 16 Sep 2024 at 21:26.
6 and 13 Jan 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on South Street, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 13 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 14:28.
6 and 31 Jan 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Road From Millham Lane To Polscoe Road, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 13:49.
6 Jan and 28 Mar 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Junction Of Pennant And Snow Hill To Junction South Of Churchtown Farm, Lanlivery, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 07:44.
6 Jan and 28 Mar 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Powderham Castle To Edgecumbe Road, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 07:42.
6 and 10 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Sandy Hill, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 5 Dec 2024 at 09:26.
6 and 10 Jan 2025
South West Water are proposing to carry out Utility repair and maintenance works on Sandy Hill, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by South West Water on 14 Oct 2024 at 08:51.
6 and 10 Jan 2025
South West Water were proposing to carry out Utility repair and maintenance works on Sandy Hill, St Austell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 10 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by South West Water on 14 Oct 2024 at 08:15.
6 Jan and 28 Mar 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Road North Bound From The Crown To Snow Hill, Lanlivery, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 07:49.
6 Jan and 28 Mar 2025
Wildanet were proposing to carry out Statutory Infrastructure Works on Sweetshouse Road, Nomansland, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 12:34.
6 Jan and 28 Mar 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Loving Lane To Powderham Castle, Lanlivery, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 07:43.
6 Jan and 28 Mar 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Snow Hill, Lanlivery, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 07:48.
6 Jan and 28 Mar 2025
Wildanet were proposing to carry out Statutory Infrastructure Works on South Street, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 12:33.
6 Jan and 28 Mar 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Poltip, Lanlivery, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 07:48.
6 Jan and 28 Mar 2025
Wildanet were proposing to carry out Statutory Infrastructure Works on Lanwithan Road, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 12:35.
6 Jan and 28 Mar 2025
Wildanet were proposing to carry out Statutory Infrastructure Works on Restormel Road, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 28 March 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 12:35.
6 and 31 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Road From Millham Lane To Polscoe Road, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 29 Aug 2024 at 09:33.
6 Jan and 28 Mar 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Road From San Sama Strickstenton Farm, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Wildanet on 3 Oct 2024 at 07:52.
7 and 9 Jan 2025
BT are proposing to carry out Utility asset works on St Blazey Road, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by BT on 4 Oct 2024 at 07:19.
13 and 20 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belmont Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Wales And West Utilities on 28 Nov 2024 at 05:52.
13 Jan and 7 Feb 2025
Wildanet are proposing to carry out Statutory Infrastructure Works on Lanwithan Road, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wildanet on 14 Oct 2024 at 06:54.
13 and 20 Jan 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Belmont Road, St Austell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 20 January 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 19 Sep 2024 at 15:59.
13 and 20 Jan 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Belmont Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 20 January 2025. The works will impact the carriageway and footpath.
This roadwork event was last updated by Wales And West Utilities on 27 Nov 2024 at 15:13.
20 Jan and 21 Feb 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Millham Lane, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 21 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 29 Aug 2024 at 09:32.
20 Jan and 21 Feb 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Millham Lane, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 20 January 2025 and run through until 21 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 12 Nov 2024 at 13:48.
27 Jan and 14 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on B3273 Between London Apprentice And Trewhiddle Gate, London Apprentice, St Austell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 10 Dec 2024 at 09:20.
27 Jan and 14 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Layby On B3273, London Apprentice, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 10 Dec 2024 at 09:20.
27 Jan and 14 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Layby On B3273, London Apprentice, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 27 Nov 2024 at 15:08.
27 Jan and 14 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on B3273 Between London Apprentice And Trewhiddle Gate, London Apprentice, St Austell.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 27 Nov 2024 at 15:00.
29 and 31 Jan 2025
South West Water are proposing to carry out Utility asset works on Middleway, St Blazey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 29 Oct 2024 at 11:53.
4 and 7 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 From Junction South East Of Trevenning Farm To Castledore, Castledore, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 3 Dec 2024 at 09:37.
4 and 7 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 From Fowey Cross To Junction South East Of Trevenning Farm, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 3 Dec 2024 at 09:37.
10 Feb and 14 Mar 2025
Cornwall Council are proposing to carry out Highway improvement works on Fairway, Carlyon Bay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 12 Dec 2024 at 12:04.
10 Feb and 7 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cott Road, Lostwithiel.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 29 Aug 2024 at 13:19.
10 Feb and 7 Mar 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Cott Road, Lostwithiel.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 7 March 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 8 Nov 2024 at 17:42.
10 Feb and 31 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Millham Lane, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 15 Nov 2024 at 06:44.
10 Feb and 23 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Millham Lane, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 08:52.
15 Feb and 18 May 2025
Network Rail are proposing to carry out Works for Rail Purposes on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 February 2025 and could run through until 18 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 3 Dec 2024 at 12:55.
17 and 21 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on St Marys Road, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 16 Aug 2024 at 14:49.
19 and 21 Feb 2025
South West Water were proposing to carry out Utility repair and maintenance works on Holmbush Arch Road, St Austell.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 19 February 2025 and run through until 21 February 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Dec 2024 at 20:13.
24 Feb and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 11:07.
24 Feb and 31 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 29 Nov 2024 at 11:24.
24 Feb and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 20 Nov 2024 at 07:37.
24 and 26 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Polglaze Farm And The A3082 Roundabout At Newtown, Newtown, Fowey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.
24 and 26 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 From Fowey Cross To Junction South East Of Trevenning Farm, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.
24 Feb and 23 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cott Road, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 22 Nov 2024 at 13:18.
24 and 26 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Castledor And Little Pinnock, Castledore, Fowey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.
24 Feb and 23 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cott Road, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 23 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 19 Nov 2024 at 09:09.
24 and 26 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Little Pinnock And Polglaze Farm, Fowey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.
24 Feb and 4 Apr 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cott Road, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 15 Nov 2024 at 06:44.
24 and 28 Feb 2025
South West Water are proposing to carry out Utility repair and maintenance works on School Hill, Golant, Fowey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 14 Nov 2024 at 08:18.
24 and 26 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 From Junction South East Of Trevenning Farm To Castledore, Castledore, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.
26 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3268 Between Percys Lane And Bodmin Road, Trebyan, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 6 Aug 2024 at 08:28.
26 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Bodmin Road, Maudlin, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 6 Aug 2024 at 08:28.
26 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Turnpike, Sweetshouse, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 6 Aug 2024 at 08:28.
26 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3268 Between Turnpike And Tanhouse Road, Sweetshouse, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 6 Aug 2024 at 08:27.
26 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Chark Lane To Sweetshouse, Sweetshouse, Bodmin.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 6 Aug 2024 at 08:27.
26 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Rew Pool And Sweetshouse Road, Nomansland, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 6 Aug 2024 at 08:27.
26 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Sweetshouse Road, Nomansland, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 February 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Cornwall Council on 6 Aug 2024 at 08:27.
3 and 5 Mar 2025
BT are proposing to carry out Utility asset works on Luxulyan Road, St Blazey Gate, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.
This roadwork event was last updated by BT on 21 Oct 2024 at 09:29.
3 Mar and 4 Apr 2025
Cornwall Council are proposing to carry out Highway improvement works on Fairway, Carlyon Bay.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 11 Dec 2024 at 13:31.
3 and 7 Mar 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Esplanade, Fowey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 29 Nov 2024 at 10:03.
3 and 7 Mar 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Esplanade, Fowey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 25 Nov 2024 at 12:49.
4 and 7 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on North East Distributor Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 17 Dec 2024 at 12:43.
4 and 7 Mar 2025
Western Power Distribution (South West) are proposing to carry out Utility asset works on North East Distributor Road, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 6 Dec 2024 at 09:46.
8 and 10 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on Grenville Road, Lostwithiel.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 March 2025 and could run through until 10 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 26 Jul 2024 at 05:00.
10 and 16 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 22 Oct 2024 at 13:25.
10 and 16 Mar 2025
Network Rail are proposing to carry out Works for Rail Purposes on North Street, St Austell.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 16 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 31 Oct 2024 at 11:51.
10 and 14 Mar 2025
South West Water are proposing to carry out New service connection on Windsor Drive, Carlyon Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South West Water on 2 Dec 2024 at 08:59.
10 and 14 Mar 2025
South West Water are proposing to carry out New service connection on Windsor Drive, Carlyon Bay.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by South West Water on 27 Nov 2024 at 09:24.
17 and 29 Mar 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on A390 Between Junction North Of Trewindle And Grenville Road, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 5 Sep 2024 at 10:43.
17 and 29 Mar 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on Grenville Road, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 5 Sep 2024 at 10:45.
17 and 29 Mar 2025
Cornwall Council were proposing to carry out Highway repair and maintenance works on Liddicoat Road, Lostwithiel.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 29 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 5 Sep 2024 at 10:47.
17 and 21 Mar 2025
BT are proposing to carry out Utility asset works on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 10 Dec 2024 at 09:39.
Roadworks Map near to The Mews, Fore Street, PAR, PL24 2NY
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to The Mews, Fore Street, PAR, PL24 2NY (10 Events)
(Scheduled Dates)
(miles)
(Scheduled: 10 Dec 2024 - 20 Dec 2024)
Contains public sector information licensed under the Open Government Licence v3.0.