ROADWORKS SUMMARY
Polmear Parc, PAR, PL24 2AA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Polmear Parc, PL24 2AA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Polmear Parc, PAR, PL24 2AA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Polmear Parc are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cornwall Council logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Tywardreath Hill

Cornwall Council are carrying out Highway repair and maintenance works on Tywardreath Hill, Par.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2020 at 11:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 2 Jun 2025 at 13:12.

Cornwall Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Terras Hill

Cornwall Council are carrying out Highway repair and maintenance works on Terras Hill, Lostwithiel.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 February 2024 at 12:00 and could run through until 29 August 2025. The works will impact the verge only.

This roadwork event was last updated by Cornwall Council on 21 Feb 2025 at 11:38.

South West Water logo
Finishing
Friday
Details
View Map
Share
Follow
Wood Lane

South West Water are carrying out Utility repair and maintenance works on Wood Lane, Tywardreath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:21 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Jun 2025 at 11:13.

Cornwall Council logo
LONG TERM
Until
11 Jul 2025
Details
View Map
Share
Follow
Fairway

Cornwall Council are carrying out Highway improvement works on Fairway, Carlyon Bay.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 07:30 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 2 Jun 2025 at 09:14.

South West Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
B3274 From Ruddlemoor To Bodmin Road

South West Water were proposing to carry out Utility repair and maintenance works on B3274 From Ruddlemoor To Bodmin Road, Ruddlemoor, St Austell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 5 Mar 2025 at 10:45.

South West Water logo
Between
2 and 20 Jun 2025
Details
View Map
Share
Follow
B3274 From Ruddlemoor To Bodmin Road

South West Water are proposing to carry out Utility repair and maintenance works on B3274 From Ruddlemoor To Bodmin Road, Ruddlemoor, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 6 Mar 2025 at 06:25.

South West Water logo
Until
20 Jun 2025
Details
View Map
Share
Follow
B3274 From Ruddlemoor To Bodmin Road

South West Water are carrying out Utility repair and maintenance works on B3274 From Ruddlemoor To Bodmin Road, Ruddlemoor, St Austell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:00 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Jun 2025 at 09:49.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Trethurgy Farm To Carne Grey Cottage

South West Water are proposing to carry out Utility repair and maintenance works on Road From Trethurgy Farm To Carne Grey Cottage, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Feb 2025 at 08:02.

South West Water logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Road From Trethurgy Farm To Carne Grey Cottage

South West Water are carrying out Utility repair and maintenance works on Road From Trethurgy Farm To Carne Grey Cottage, Trethurgy, St Austell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 3 Jun 2025 at 10:04.

Finishing
Friday
Details
View Map
Share
Par Moor Road

Wildanet were proposing to carry out Statutory Infrastructure Works on Par Moor Road, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 19 Mar 2025 at 09:45.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Butts Lane

South West Water are proposing to carry out Utility repair and maintenance works on Butts Lane, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South West Water on 11 Feb 2025 at 08:02.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Passage Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Passage Lane, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 11:08.

BT logo
Saturday
Details
View Map
Share
Ranelagh Road

BT carried out Utility asset works on Ranelagh Road, St Austell.

These works were categorised as Major.

The road was closed for some or all of the period.

The works were originally planned between 2 Jun 2025 and 7 Jun 2025 and were actually completed between 2 Jun 2025 (19:00) and 3 Jun 2025 (06:18). The works impacted the footway and carriageway.

This roadwork event was last updated by BT on 3 Jun 2025 at 06:19.

BT logo
Finishing
Saturday
Details
View Map
Share
Follow
Ranelagh Road

BT are proposing to carry out Utility asset works on Ranelagh Road, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 7 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 12 Feb 2025 at 13:54.

South West Water logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Butts Lane

South West Water are carrying out Utility repair and maintenance works on Butts Lane, Trethurgy, St Austell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 8 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South West Water on 3 Jun 2025 at 10:03.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Junction With Eden Access Road To Trethurgy

South West Water are proposing to carry out Utility repair and maintenance works on Road From Junction With Eden Access Road To Trethurgy, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Feb 2025 at 08:02.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Junction With Eden Access Road To Trethurgy

South West Water are proposing to carry out Utility repair and maintenance works on Road From Junction With Eden Access Road To Trethurgy, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 17 Mar 2025 at 10:56.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Trethurgy To Eden Access Road Junction

South West Water are proposing to carry out Utility repair and maintenance works on Road From Trethurgy To Eden Access Road Junction, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Feb 2025 at 08:03.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Trethurgy To Eden Access Road Junction

South West Water are proposing to carry out Utility repair and maintenance works on Road From Trethurgy To Eden Access Road Junction, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 17 Mar 2025 at 10:56.

Cornwall Council logo
LONG TERM
Between
2 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Fairway

Cornwall Council are proposing to carry out Highway improvement works on Fairway, Carlyon Bay.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 07:53.

Between
5 and 11 Jun 2025
Details
View Map
Share
Follow
Pontsmill Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Pontsmill Road, Pontsmill, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 30 May 2025 at 11:24.

Between
5 and 11 Jun 2025
Details
View Map
Share
Follow
Pontsmill Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Pontsmill Road, Pontsmill, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 15 Mar 2025 at 09:38.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Parade Square

Cornwall Council are proposing to carry out Highway repair and maintenance works on Parade Square, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:47.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
The Square

Cornwall Council are proposing to carry out Highway repair and maintenance works on The Square, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Fore Street

Cornwall Council were proposing to carry out Highway repair and maintenance works on Fore Street, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 21 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 14:04.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Church Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Church Lane, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:47.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Church Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Church Lane, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Fore Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on Fore Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
The Square

Cornwall Council are proposing to carry out Highway repair and maintenance works on The Square, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:46.

Between
9 and 17 Jun 2025
Details
View Map
Share
Follow
Road From Junction North East Of Poltor To Edgecombe Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Junction North East Of Poltor To Edgecombe Road, Penpillick, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 May 2025 at 11:14.

Between
9 and 17 Jun 2025
Details
View Map
Share
Follow
Road From Junction North East Of Poltor To Edgecombe Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Junction North East Of Poltor To Edgecombe Road, Penpillick, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 12:14.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Fore Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on Fore Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:44.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
North Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on North Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Cornwall Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Alexandra Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 18 Mar 2025 at 09:47.

Cornwall Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Alexandra Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Alexandra Road, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:47.

South West Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Duke Street

South West Water are proposing to carry out Utility repair and maintenance works on Duke Street, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 9 Apr 2025 at 09:35.

South West Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Duke Street

South West Water are proposing to carry out Utility repair and maintenance works on Duke Street, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 May 2025 at 12:05.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
The Parade

Cornwall Council are proposing to carry out Highway repair and maintenance works on The Parade, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Between
9 and 13 Jun 2025
Details
View Map
Share
Par Moor Road

Wildanet were proposing to carry out Statutory Infrastructure Works on Par Moor Road, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 25 Mar 2025 at 09:29.

Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
New Road

Wildanet are proposing to carry out Statutory Infrastructure Works on New Road, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 21 May 2025 at 13:03.

Between
9 and 13 Jun 2025
Details
View Map
Share
Par Moor Road

Wildanet were proposing to carry out Statutory Infrastructure Works on Par Moor Road, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 11:33.

Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
New Road

Wildanet are proposing to carry out Statutory Infrastructure Works on New Road, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 20:40.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
The Parade

Cornwall Council are proposing to carry out Highway repair and maintenance works on The Parade, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:46.

South West Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Church Hill

South West Water are proposing to carry out Utility repair and maintenance works on Church Hill, Golant, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 May 2025 at 12:09.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
North Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on North Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:47.

South West Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Church Hill

South West Water are proposing to carry out Utility repair and maintenance works on Church Hill, Golant, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 21 Feb 2025 at 07:14.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Parade Square

Cornwall Council are proposing to carry out Highway repair and maintenance works on Parade Square, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Road From A390 At Bridge Crossing To Sams Lane

BT were proposing to carry out Utility asset works on Road From A390 At Bridge Crossing To Sams Lane, Kilhallon, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 16:10.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
A390 From Bridge Street To Porcupine

BT were proposing to carry out Utility asset works on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 16:10.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Aberdeen Close

BT were proposing to carry out Utility asset works on Aberdeen Close, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 16:10.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Bridge Street

BT were proposing to carry out Utility asset works on Bridge Street, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 16:09.

Between
16 and 25 Jun 2025
Details
View Map
Share
Road From Tremains Wood To Rock Mill

Wildanet were proposing to carry out Statutory Infrastructure Works on Road From Tremains Wood To Rock Mill, Prideaux, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 21 Mar 2025 at 10:29.

Between
17 and 23 Jun 2025
Details
View Map
Share
Par Moor Road

Wildanet were proposing to carry out Statutory Infrastructure Works on Par Moor Road, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 23 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 7 May 2025 at 10:52.

Cornwall Council logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Lanwithan Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Lanwithan Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 11:32.

Cornwall Council logo
Between
23 Jun and 5 Jul 2025
Details
View Map
Share
Liddicoat Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Liddicoat Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 27 Mar 2025 at 13:07.

Cornwall Council logo
Between
23 Jun and 5 Jul 2025
Details
View Map
Share
Queen Street

Cornwall Council were proposing to carry out Highway repair and maintenance works on Queen Street, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 27 Mar 2025 at 13:07.

Cornwall Council logo
Between
23 Jun and 5 Jul 2025
Details
View Map
Share
Edgcumbe Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Edgcumbe Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 27 Mar 2025 at 13:07.

Cornwall Council logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Lerryn Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Lerryn Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 11:40.

Cornwall Council logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Road From Lerryn Hill To Harris's Orchard

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Lerryn Hill To Harris's Orchard, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 31 Mar 2025 at 15:02.

Cornwall Council logo
Between
23 Jun and 5 Jul 2025
Details
View Map
Share
Edgecumbe Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Edgecumbe Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 27 Mar 2025 at 13:05.

Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Road From Junction South Of Bowling Green To Treskilling

Wildanet are proposing to carry out Utility asset works on Road From Junction South Of Bowling Green To Treskilling, Bowling Green, Bugle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wildanet on 1 Apr 2025 at 18:02.

Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Road From Junction South Of Bowling Green To Treskilling

Wildanet are proposing to carry out Utility asset works on Road From Junction South Of Bowling Green To Treskilling, Bowling Green, Bugle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wildanet on 30 May 2025 at 11:17.

Cornwall Council logo
Between
26 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Road From Junction North Of Lerryn View To Yonder Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction North Of Lerryn View To Yonder Cottage, Lerryn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 31 Mar 2025 at 15:03.

Between
26 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Road From Edgecombe Road Junction West Of Great Pelean Farm

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Edgecombe Road Junction West Of Great Pelean Farm, Penpillick, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 17 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 12:27.

Cornwall Council logo
Between
26 Jun and 4 Jul 2025
Details
View Map
Share
Lanwithan Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Lanwithan Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 31 Mar 2025 at 15:04.

Between
26 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Treesmill

Wildanet are proposing to carry out Statutory Infrastructure Works on Treesmill, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 16 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 12:26.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Road From Lerryn Hill To Harris's Orchard

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Lerryn Hill To Harris's Orchard, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:58.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Road From Lerryn Hill To Harris's Orchard

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Lerryn Hill To Harris's Orchard, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 16:18.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Road From Junction North Of Lerryn View To Yonder Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction North Of Lerryn View To Yonder Cottage, Lerryn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:58.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Lerryn Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lerryn Road, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 16:18.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Lerryn Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lerryn Road, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:57.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Road From Junction North Of Lerryn View To Yonder Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction North Of Lerryn View To Yonder Cottage, Lerryn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 16:18.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Lanwithan Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lanwithan Road, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 16:18.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Lanwithan Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lanwithan Road, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:53.

Between
30 Jun and 9 Jul 2025
Details
View Map
Share
Road From Tremains Wood To Rock Mill

Wildanet were proposing to carry out Statutory Infrastructure Works on Road From Tremains Wood To Rock Mill, Prideaux, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 27 Mar 2025 at 10:28.

Between
30 Jun and 9 Jul 2025
Details
View Map
Share
Road From Tremains Wood To Rock Mill

Wildanet were proposing to carry out Statutory Infrastructure Works on Road From Tremains Wood To Rock Mill, Prideaux, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 26 Mar 2025 at 16:19.

Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Prideaux Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Prideaux Road, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 15 Mar 2025 at 09:40.

Between
3 and 9 Jul 2025
Details
View Map
Share
Follow
Road From Carne Cross To Junction South West Of Wheal Par

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Carne Cross To Junction South West Of Wheal Par, Carne Cross, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 9 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 07:59.

South West Water logo
Between
14 and 18 Jul 2025
Details
View Map
Share
Duke Street

South West Water were proposing to carry out Utility repair and maintenance works on Duke Street, St Austell.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 18 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 9 Apr 2025 at 08:58.

Between
17 and 29 Jul 2025
Details
View Map
Share
Follow
Road From A390 At Bridge Crossing To Sams Lane

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From A390 At Bridge Crossing To Sams Lane, Kilhallon, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 07:48.

Between
21 and 30 Jul 2025
Details
View Map
Share
Follow
Road From Tremains Wood To Rock Mill

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Tremains Wood To Rock Mill, Prideaux, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 28 Mar 2025 at 09:22.

South West Water logo
Between
21 and 25 Jul 2025
Details
View Map
Share
Follow
Dobell Road

South West Water are proposing to carry out Utility repair and maintenance works on Dobell Road, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 25 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 1 Apr 2025 at 16:12.

Wales And West Utilities logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Cromwell Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cromwell Road, St Austell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 31 Jan 2025 at 18:40.

Cornwall Council logo
LONG TERM
Between
28 Jul and 3 Sep 2025
Details
View Map
Share
Follow
Bodmin Hill

Cornwall Council are proposing to carry out roadworks on Bodmin Hill, Lostwithiel.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 25 Feb 2025 at 12:32.

Wales And West Utilities logo
Between
28 Jul and 15 Aug 2025
Details
View Map
Share
Follow
Cromwell Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Cromwell Road, St Austell.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 15 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 3 Feb 2025 at 10:06.

Between
29 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Driving Lane

Wildanet are proposing to carry out Statutory Infrastructure Works on Driving Lane, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 7 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 07:56.

Between
30 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Road From Luxulyan Road To Cornhill Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Luxulyan Road To Cornhill Road, Bodelva, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 5 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 14:17.

Between
30 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Cornhill Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Cornhill Road, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 5 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 14:17.

BT logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
South Street

BT are proposing to carry out Utility asset works on South Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 May 2025 at 14:59.

BT logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Castle Hill

BT are proposing to carry out Utility asset works on Castle Hill, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 May 2025 at 14:59.

Between
6 and 27 Aug 2025
Details
View Map
Share
Follow
Road From Junction North Of Prideux To Junction South Of Wheal Par

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Junction North Of Prideux To Junction South Of Wheal Par, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Apr 2025 at 09:31.

BT logo
Between
10 and 17 Aug 2025
Details
View Map
Share
Follow
St Saviours Hill

BT are proposing to carry out Utility asset works on St Saviours Hill, Polruan.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 August 2025 and could run through until 17 August 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 23 Apr 2025 at 10:25.


Roadworks Map near to Polmear Parc, PAR, PL24 2AA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 11:48
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Polmear Parc, PAR, PL24 2AA (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
POLMEAR PARC 
(0.1 miles)
Wildanet
Statutory Infrastructure Works - Footway, Carriageway, Verge - Give and take
In Progress
Since: 27 May 2025 08:30
(Scheduled: 27 May 2025 - 9 Jun 2025)
0.1
Details
Share
Follow
2
Cornwall Council logo
POLMEAR HILL 
(0.2 miles)
Cornwall Council
Section 50 - Footpath - No carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 13 Jun 2025
0.2
Details
Share
Follow
3
Cornwall Council logo
EMERGENCY
  
TYWARDREATH HILL 
(0.3 miles)
Cornwall Council
Highway repair and maintenance works - Carriageway - Road closure
In Progress
Since: 8 Jul 2020 11:00
(Scheduled: 8 Jul 2020 - 8 Jul 2025)
0.3
Details
Share
Follow
4
South West Water logo
URGENT
  
WOOD LANE 
(0.6 miles)
South West Water
Utility repair and maintenance works - Carriageway - Road closure
In Progress
Since: 27 May 2025 10:21
(Scheduled: 27 May 2025 - 6 Jun 2025)
0.6
Details
Share
Follow
5
CASTLEDORE ROAD 
(0.6 miles)
Wildanet
Statutory Infrastructure Works - Carriageway, Verge - Multi-way signals
Complete
27 May 2025 10:55 - 3 Jun 2025 11:00
0.6
Details
Share
6
PAR GREEN 
(0.6 miles)
Wildanet
Statutory Infrastructure Works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.6
Details
Share
Follow
7
South West Water logo
ST BLAZEY ROAD 
(0.8 miles)
South West Water
Utility repair and maintenance works - Carriageway - Two-way signals
Cancelled
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.8
Details
Share
8
MAJOR
  
PAR MOOR ROAD 
(0.9 miles)
Wildanet
Statutory Infrastructure Works - Footway, Carriageway, Verge - Road closure
Cancelled
(Scheduled: 2 Jun 2025 - 6 Jun 2025)
0.9
Details
Share
9
BT logo
ST ANDREWS ROAD 
(0.9 miles)
BT
Permanent reinstatement - Footway, Carriageway, Verge - Two-way signals
Complete
2 Jun 2025 13:00 - 3 Jun 2025 08:00
0.9
Details
Share