ROADWORKS SUMMARY
Union Place, FOWEY, PL23 1BY

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Union Place, PL23 1BY and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Union Place, FOWEY, PL23 1BY

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Union Place are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cornwall Council logo
LONG TERM
Until
6 Jun 2025
Details
View Map
Share
Follow
Tywardreath Hill

Cornwall Council are carrying out Highway repair and maintenance works on Tywardreath Hill, Par.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2020 at 11:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Oct 2024 at 18:56.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Poltip

Wildanet are carrying out Statutory Infrastructure Works on Poltip, Lanlivery, Bodmin.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 10:17 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 6 Jan 2025 at 10:20.

LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Poltip

Wildanet are proposing to carry out Statutory Infrastructure Works on Poltip, Lanlivery, Bodmin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wildanet on 3 Oct 2024 at 07:48.

LONG TERM
Between
6 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Road From San Sama Strickstenton Farm

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From San Sama Strickstenton Farm, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Wildanet on 3 Oct 2024 at 07:52.

LONG TERM
Until
28 Mar 2025
Details
View Map
Share
Follow
Road From San Sama Strickstenton Farm

Wildanet are carrying out Statutory Infrastructure Works on Road From San Sama Strickstenton Farm, Par.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 10:21 and could run through until 28 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 6 Jan 2025 at 10:23.

Cornwall Council logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Fairway

Cornwall Council were proposing to carry out Highway improvement works on Fairway, Carlyon Bay.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 23 Jan 2025 at 14:32.

South West Water logo
Wednesday
Details
View Map
Share
Road From Peakswater To Junction East Of Tregamellyn

South West Water carried out Utility repair and maintenance works on Road From Peakswater To Junction East Of Tregamellyn, Lansallos.

The road was closed for some or all of the period.

The works were originally planned between 13 Feb 2025 and 19 Feb 2025 and were actually completed between 13 Feb 2025 (09:39) and 17 Feb 2025 (16:03). The works impacted the carriageway only.

This roadwork event was last updated by South West Water on 17 Feb 2025 at 16:04.

Network Rail logo
LONG TERM
Between
15 Feb and 18 May 2025
Details
View Map
Share
A390 From Bridge Street To Porcupine

Network Rail were proposing to carry out Works for Rail Purposes on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 February 2025 and run through until 18 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 18 Dec 2024 at 12:40.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
St Marys Road

Cornwall Council are carrying out Highway repair and maintenance works on St Marys Road, Par.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 February 2025 at 07:30 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 17 Feb 2025 at 09:17.

Cornwall Council logo
Finishing
Friday
Details
View Map
Share
Follow
St Marys Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on St Marys Road, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 Aug 2024 at 14:49.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 Between Little Pinnock And Polglaze Farm

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Little Pinnock And Polglaze Farm, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 19:32.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 Between Little Pinnock And Polglaze Farm

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Little Pinnock And Polglaze Farm, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 Between Polglaze Farm And The A3082 Roundabout At Newtown

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Polglaze Farm And The A3082 Roundabout At Newtown, Newtown, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 19:32.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 Between Polglaze Farm And The A3082 Roundabout At Newtown

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Polglaze Farm And The A3082 Roundabout At Newtown, Newtown, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.

South West Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
School Hill

South West Water are proposing to carry out Utility repair and maintenance works on School Hill, Golant, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 16 Jan 2025 at 17:55.

South West Water logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
School Hill

South West Water are proposing to carry out Utility repair and maintenance works on School Hill, Golant, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 14 Nov 2024 at 08:18.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 From Fowey Cross To Junction South East Of Trevenning Farm

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 From Fowey Cross To Junction South East Of Trevenning Farm, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 Between Castledor And Little Pinnock

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Castledor And Little Pinnock, Castledore, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 Between Castledor And Little Pinnock

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 Between Castledor And Little Pinnock, Castledore, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 19:32.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 From Junction South East Of Trevenning Farm To Castledore

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 From Junction South East Of Trevenning Farm To Castledore, Castledore, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 19:33.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 From Fowey Cross To Junction South East Of Trevenning Farm

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 From Fowey Cross To Junction South East Of Trevenning Farm, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 19:33.

Cornwall Council logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
B3269 From Junction South East Of Trevenning Farm To Castledore

Cornwall Council are proposing to carry out Highway repair and maintenance works on B3269 From Junction South East Of Trevenning Farm To Castledore, Castledore, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Cornwall Council on 5 Aug 2024 at 14:06.

Western Power Distribution (South West) logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Esplanade

Western Power Distribution (South West) are proposing to carry out New service connection on Esplanade, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 29 Nov 2024 at 10:03.

BT logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Luxulyan Road

BT are proposing to carry out Utility asset works on Luxulyan Road, St Blazey Gate, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 21 Oct 2024 at 09:29.

Western Power Distribution (South West) logo
Between
3 and 7 Mar 2025
Details
View Map
Share
Follow
Esplanade

Western Power Distribution (South West) are proposing to carry out New service connection on Esplanade, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (South West) on 25 Nov 2024 at 12:49.

Cornwall Council logo
LONG TERM
Between
3 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Fairway

Cornwall Council are proposing to carry out Highway improvement works on Fairway, Carlyon Bay.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 11 Dec 2024 at 13:31.

BT logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Luxulyan Road

BT are proposing to carry out Utility asset works on Luxulyan Road, St Blazey Gate, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 14 Feb 2025 at 16:59.

Cornwall Council logo
Between
5 and 19 Mar 2025
Details
View Map
Share
Follow
A390 From Bridge Street To Porcupine

Cornwall Council are proposing to carry out roadworks on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 19 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 10 Feb 2025 at 11:13.

BT logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
A390 From Bridge Street To Porcupine

BT are proposing to carry out Utility asset works on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 10 Dec 2024 at 09:39.

BT logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
A390 From Bridge Street To Porcupine

BT are proposing to carry out Utility asset works on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 19 Dec 2024 at 08:33.

BT logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
A390 From Bridge Street To Porcupine

BT are proposing to carry out Utility asset works on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by BT on 15 Jan 2025 at 13:47.

South West Water logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Harbour Road

South West Water are proposing to carry out Utility repair and maintenance works on Harbour Road, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 16 Dec 2024 at 15:08.

BT logo
Between
7 and 10 Apr 2025
Details
View Map
Share
Follow
Castle Hill

BT are proposing to carry out Utility asset works on Castle Hill, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 April 2025 and could run through until 10 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by BT on 4 Oct 2024 at 12:37.

South West Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Road From Bocaddon To St Marnarchs Road

South West Water are proposing to carry out Utility repair and maintenance works on Road From Bocaddon To St Marnarchs Road, Lanreath.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 13 Jan 2025 at 15:16.

Western Power Distribution (South West) logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Biscovey Road

Western Power Distribution (South West) are proposing to carry out New service connection on Biscovey Road, St Blazey Gate, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 12 Feb 2025 at 20:26.

Western Power Distribution (South West) logo
Between
22 and 25 Apr 2025
Details
View Map
Share
Follow
Biscovey Road

Western Power Distribution (South West) are proposing to carry out New service connection on Biscovey Road, St Blazey Gate, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 April 2025 and could run through until 25 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (South West) on 11 Feb 2025 at 08:10.

South West Water logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Road From Bocaddon To St Marnarchs Road

South West Water were proposing to carry out Utility repair and maintenance works on Road From Bocaddon To St Marnarchs Road, Lanreath.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 13 Jan 2025 at 13:54.

BT logo
Between
29 Apr and 1 May 2025
Details
View Map
Share
Follow
St Blazey Road

BT are proposing to carry out Utility asset works on St Blazey Road, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 27 Jan 2025 at 15:16.

Network Rail logo
Between
10 and 18 May 2025
Details
View Map
Share
Follow
Dark Lane

Network Rail are proposing to carry out Works for Rail Purposes on Dark Lane, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jan 2025 at 11:12.

Network Rail logo
Between
10 and 18 May 2025
Details
View Map
Share
Follow
Dark Lane

Network Rail are proposing to carry out Works for Rail Purposes on Dark Lane, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 May 2025 and could run through until 18 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jan 2025 at 11:44.

Network Rail logo
Between
12 and 15 May 2025
Details
View Map
Share
Follow
Par Green

Network Rail are proposing to carry out Works for Rail Purposes on Par Green, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 22 Jan 2025 at 09:05.

South West Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Follow
Esplanade

South West Water are proposing to carry out Utility repair and maintenance works on Esplanade, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 16 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 4 Feb 2025 at 08:06.

South West Water logo
Between
12 and 16 May 2025
Details
View Map
Share
Esplanade

South West Water were proposing to carry out Utility repair and maintenance works on Esplanade, Fowey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 May 2025 and run through until 16 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by South West Water on 3 Feb 2025 at 14:42.

Network Rail logo
Between
12 and 15 May 2025
Details
View Map
Share
Follow
Par Green

Network Rail are proposing to carry out Works for Rail Purposes on Par Green, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 May 2025 and could run through until 15 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 24 Jan 2025 at 10:40.


Roadworks Map near to Union Place, FOWEY, PL23 1BY

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Feb 2025 16:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Union Place, FOWEY, PL23 1BY (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cornwall Council logo
EMERGENCY
  
BULL HILL 
(0.0 miles)
Cornwall Council
Highway repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 8 Sep 2023 15:40
(Scheduled: 8 Sep 2023 - 28 Mar 2025)
0.0
Details
Share
Follow
2
South West Water logo
URGENT
  
RAWLINGS LANE 
(0.1 miles)
South West Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 15 Feb 2025 18:39
(Scheduled: 15 Feb 2025 - 20 Feb 2025)
0.1
Details
Share
Follow
3
South West Water logo
URGENT
  
EAST STREET 
(0.5 miles)
South West Water
Utility repair and maintenance works - Footpath - Some carriageway incursion
Complete
16 Feb 2025 12:07 - 14:02
0.5
Details
Share
4
South West Water logo
URGENT
  
FORE STREET 
(0.5 miles)
South West Water
Utility repair and maintenance works - Carriageway - Road closure
Complete
11 Feb 2025 19:34 - 12 Feb 2025 04:28
0.5
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.