ROADWORKS SUMMARY
Couchwell Lane, LOSTWITHIEL, PL22 0BQ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Couchwell Lane, PL22 0BQ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Couchwell Lane, LOSTWITHIEL, PL22 0BQ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Couchwell Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cornwall Council logo
LONG TERM
Until
8 Jul 2025
Details
View Map
Share
Follow
Tywardreath Hill

Cornwall Council are carrying out Highway repair and maintenance works on Tywardreath Hill, Par.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 July 2020 at 11:00 and could run through until 8 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 2 Jun 2025 at 13:12.

Cornwall Council logo
LONG TERM
Until
29 Aug 2025
Details
View Map
Share
Follow
Terras Hill

Cornwall Council are carrying out Highway repair and maintenance works on Terras Hill, Lostwithiel.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 February 2024 at 12:00 and could run through until 29 August 2025. The works will impact the verge only.

This roadwork event was last updated by Cornwall Council on 21 Feb 2025 at 11:38.

Cornwall Council logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Crinnicks Hill

Cornwall Council are carrying out Highway repair and maintenance works on Crinnicks Hill, Bodmin.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 January 2025 at 15:00 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 11 Apr 2025 at 10:29.

Cornwall Council logo
LONG TERM
Until
26 Sep 2025
Details
View Map
Share
Follow
Road From Chimney Tops To Moor Lane

Cornwall Council are carrying out Highway repair and maintenance works on Road From Chimney Tops To Moor Lane, Trevellion, Bugle.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 13 March 2025 at 11:45 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 27 May 2025 at 13:09.

Wales And West Utilities logo
LONG TERM
Between
21 Apr and 20 Jun 2025
Details
View Map
Share
St Marys Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on St Marys Road, Bodmin.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 April 2025 and run through until 20 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 25 Apr 2025 at 10:08.

Wales And West Utilities logo
Finishing
Sunday
Details
View Map
Share
A390 Between Junction North Of Trewindle And Grenville Road

Wales And West Utilities were proposing to carry out Utility repair and maintenance works on A390 Between Junction North Of Trewindle And Grenville Road, Lostwithiel.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 May 2025 and run through until 8 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Wales And West Utilities on 10 Feb 2025 at 10:56.

Wales And West Utilities logo
LONG TERM
Until
30 Jun 2025
Details
View Map
Share
Follow
Vivian Road

Wales And West Utilities are carrying out Utility repair and maintenance works on Vivian Road, Bodmin.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 13:00 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 27 May 2025 at 13:38.

South West Water logo
Finishing
Friday
Details
View Map
Share
Follow
Wood Lane

South West Water are carrying out Utility repair and maintenance works on Wood Lane, Tywardreath.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 10:21 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 2 Jun 2025 at 11:13.

Wales And West Utilities logo
LONG TERM
Between
27 May and 30 Jun 2025
Details
View Map
Share
Follow
Vivian Road

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Vivian Road, Bodmin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2025 and could run through until 30 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 30 Jan 2025 at 06:41.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
A390 Between Junction At North Lane And Junction North Of Trewindle

Cornwall Council are proposing to carry out Highway repair and maintenance works on A390 Between Junction At North Lane And Junction North Of Trewindle, West Taphouse.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 07:27.

South West Water logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Road From Trethurgy Farm To Carne Grey Cottage

South West Water are carrying out Utility repair and maintenance works on Road From Trethurgy Farm To Carne Grey Cottage, Trethurgy, St Austell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 3 Jun 2025 at 10:04.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Butts Lane

South West Water are proposing to carry out Utility repair and maintenance works on Butts Lane, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South West Water on 11 Feb 2025 at 08:02.

South West Water logo
LONG TERM
Until
8 Aug 2025
Details
View Map
Share
Follow
Butts Lane

South West Water are carrying out Utility repair and maintenance works on Butts Lane, Trethurgy, St Austell.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 09:30 and could run through until 8 August 2025. The works will impact the carriageway and footpath.

This roadwork event was last updated by South West Water on 3 Jun 2025 at 10:03.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Junction With Eden Access Road To Trethurgy

South West Water are proposing to carry out Utility repair and maintenance works on Road From Junction With Eden Access Road To Trethurgy, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Feb 2025 at 08:02.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Junction With Eden Access Road To Trethurgy

South West Water are proposing to carry out Utility repair and maintenance works on Road From Junction With Eden Access Road To Trethurgy, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 17 Mar 2025 at 10:56.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Trethurgy To Eden Access Road Junction

South West Water are proposing to carry out Utility repair and maintenance works on Road From Trethurgy To Eden Access Road Junction, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Feb 2025 at 08:03.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Trethurgy To Eden Access Road Junction

South West Water are proposing to carry out Utility repair and maintenance works on Road From Trethurgy To Eden Access Road Junction, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 17 Mar 2025 at 10:56.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
A390 West Of Hillside To Junction East Of Cripstone Farm

Cornwall Council are proposing to carry out Highway repair and maintenance works on A390 West Of Hillside To Junction East Of Cripstone Farm, Middle Taphouse.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 07:27.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
A390 Between Junction With B3359 At Middle Taphouse And Junction At North Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on A390 Between Junction With B3359 At Middle Taphouse And Junction At North Lane, Middle Taphouse.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 07:27.

Finishing
Friday
Details
View Map
Share
Par Moor Road

Wildanet were proposing to carry out Statutory Infrastructure Works on Par Moor Road, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 6 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 19 Mar 2025 at 09:45.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
Passage Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Passage Lane, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 11:08.

South West Water logo
LONG TERM
Between
2 Jun and 8 Aug 2025
Details
View Map
Share
Follow
Road From Trethurgy Farm To Carne Grey Cottage

South West Water are proposing to carry out Utility repair and maintenance works on Road From Trethurgy Farm To Carne Grey Cottage, Trethurgy, St Austell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 8 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 11 Feb 2025 at 08:02.

Cornwall Council logo
LONG TERM
Between
2 Jun and 14 Jul 2025
Details
View Map
Share
Follow
A390 West Of Hillside To Junction East Of Cripstone Farm

Cornwall Council are proposing to carry out Highway repair and maintenance works on A390 West Of Hillside To Junction East Of Cripstone Farm, Middle Taphouse.

These works are categorised as Major.

The works will start on or after 2 June 2025 and could run through until 14 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 12 Mar 2025 at 07:26.

Between
5 and 11 Jun 2025
Details
View Map
Share
Follow
Pontsmill Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Pontsmill Road, Pontsmill, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 15 Mar 2025 at 09:38.

Between
5 and 11 Jun 2025
Details
View Map
Share
Follow
Pontsmill Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Pontsmill Road, Pontsmill, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 June 2025 and could run through until 11 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 30 May 2025 at 11:24.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
The Square

Cornwall Council are proposing to carry out Highway repair and maintenance works on The Square, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
The Square

Cornwall Council are proposing to carry out Highway repair and maintenance works on The Square, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:46.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
The Parade

Cornwall Council are proposing to carry out Highway repair and maintenance works on The Parade, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
The Parade

Cornwall Council are proposing to carry out Highway repair and maintenance works on The Parade, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:46.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Parade Square

Cornwall Council are proposing to carry out Highway repair and maintenance works on Parade Square, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Between
9 and 13 Jun 2025
Details
View Map
Share
Par Moor Road

Wildanet were proposing to carry out Statutory Infrastructure Works on Par Moor Road, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 11:33.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Church Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Church Lane, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:47.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Parade Square

Cornwall Council are proposing to carry out Highway repair and maintenance works on Parade Square, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:47.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Fore Street

Cornwall Council were proposing to carry out Highway repair and maintenance works on Fore Street, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 21 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 14:04.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Fore Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on Fore Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Fore Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on Fore Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:44.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
North Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on North Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
North Street

Cornwall Council are proposing to carry out Highway repair and maintenance works on North Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:47.

Cornwall Council logo
Between
9 and 21 Jun 2025
Details
View Map
Share
Follow
Church Lane

Cornwall Council are proposing to carry out Highway repair and maintenance works on Church Lane, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 21 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 26 Feb 2025 at 16:06.

Between
9 and 13 Jun 2025
Details
View Map
Share
Par Moor Road

Wildanet were proposing to carry out Statutory Infrastructure Works on Par Moor Road, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 13 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 25 Mar 2025 at 09:29.

Between
9 and 17 Jun 2025
Details
View Map
Share
Follow
Road From Junction North East Of Poltor To Edgecombe Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Junction North East Of Poltor To Edgecombe Road, Penpillick, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 May 2025 at 11:14.

Between
9 and 17 Jun 2025
Details
View Map
Share
Follow
Road From Junction North East Of Poltor To Edgecombe Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Junction North East Of Poltor To Edgecombe Road, Penpillick, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 17 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 12:14.

South West Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Church Hill

South West Water are proposing to carry out Utility repair and maintenance works on Church Hill, Golant, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 21 Feb 2025 at 07:14.

South West Water logo
Between
9 and 13 Jun 2025
Details
View Map
Share
Follow
Church Hill

South West Water are proposing to carry out Utility repair and maintenance works on Church Hill, Golant, Fowey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 13 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 8 May 2025 at 12:09.

Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
New Road

Wildanet are proposing to carry out Statutory Infrastructure Works on New Road, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 20:40.

Between
9 and 27 Jun 2025
Details
View Map
Share
Follow
New Road

Wildanet are proposing to carry out Statutory Infrastructure Works on New Road, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 27 June 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 21 May 2025 at 13:03.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Bridge Street

BT were proposing to carry out Utility asset works on Bridge Street, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 16:09.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Aberdeen Close

BT were proposing to carry out Utility asset works on Aberdeen Close, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 16:10.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
A390 From Bridge Street To Porcupine

BT were proposing to carry out Utility asset works on A390 From Bridge Street To Porcupine, Tywardreath Highway, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 16:10.

BT logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Road From A390 At Bridge Crossing To Sams Lane

BT were proposing to carry out Utility asset works on Road From A390 At Bridge Crossing To Sams Lane, Kilhallon, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 June 2025 and run through until 12 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by BT on 29 Jan 2025 at 16:10.

Between
16 and 25 Jun 2025
Details
View Map
Share
Road From Tremains Wood To Rock Mill

Wildanet were proposing to carry out Statutory Infrastructure Works on Road From Tremains Wood To Rock Mill, Prideaux, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 16 June 2025 and run through until 25 June 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 21 Mar 2025 at 10:29.

Between
17 and 23 Jun 2025
Details
View Map
Share
Par Moor Road

Wildanet were proposing to carry out Statutory Infrastructure Works on Par Moor Road, Par.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 June 2025 and run through until 23 June 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 7 May 2025 at 10:52.

Cornwall Council logo
Between
23 Jun and 5 Jul 2025
Details
View Map
Share
Liddicoat Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Liddicoat Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 27 Mar 2025 at 13:07.

Cornwall Council logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Road From Lerryn Hill To Harris's Orchard

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Lerryn Hill To Harris's Orchard, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 31 Mar 2025 at 15:02.

Cornwall Council logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Lanwithan Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Lanwithan Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 11:32.

Cornwall Council logo
Between
23 Jun and 5 Jul 2025
Details
View Map
Share
Queen Street

Cornwall Council were proposing to carry out Highway repair and maintenance works on Queen Street, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 27 Mar 2025 at 13:07.

Cornwall Council logo
Between
23 Jun and 5 Jul 2025
Details
View Map
Share
Edgcumbe Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Edgcumbe Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 27 Mar 2025 at 13:07.

Cornwall Council logo
Between
23 Jun and 5 Jul 2025
Details
View Map
Share
Edgecumbe Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Edgecumbe Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 5 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 27 Mar 2025 at 13:05.

Cornwall Council logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Lerryn Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Lerryn Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 11:40.

Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Road From Junction South Of Bowling Green To Treskilling

Wildanet are proposing to carry out Utility asset works on Road From Junction South Of Bowling Green To Treskilling, Bowling Green, Bugle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wildanet on 1 Apr 2025 at 18:02.

Between
25 and 27 Jun 2025
Details
View Map
Share
Follow
Road From Junction South Of Bowling Green To Treskilling

Wildanet are proposing to carry out Utility asset works on Road From Junction South Of Bowling Green To Treskilling, Bowling Green, Bugle.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2025 and could run through until 27 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Wildanet on 30 May 2025 at 11:17.

Cornwall Council logo
Between
26 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Road From Junction North Of Lerryn View To Yonder Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction North Of Lerryn View To Yonder Cottage, Lerryn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 31 Mar 2025 at 15:03.

Between
26 Jun and 16 Jul 2025
Details
View Map
Share
Follow
Treesmill

Wildanet are proposing to carry out Statutory Infrastructure Works on Treesmill, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 16 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 12:26.

Between
26 Jun and 17 Jul 2025
Details
View Map
Share
Follow
Road From Edgecombe Road Junction West Of Great Pelean Farm

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Edgecombe Road Junction West Of Great Pelean Farm, Penpillick, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 June 2025 and could run through until 17 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Mar 2025 at 12:27.

Cornwall Council logo
Between
26 Jun and 4 Jul 2025
Details
View Map
Share
Lanwithan Road

Cornwall Council were proposing to carry out Highway repair and maintenance works on Lanwithan Road, Lostwithiel.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 June 2025 and run through until 4 July 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 31 Mar 2025 at 15:04.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Lanwithan Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lanwithan Road, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 16:18.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Road From Lerryn Hill To Harris's Orchard

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Lerryn Hill To Harris's Orchard, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:58.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Road From Lerryn Hill To Harris's Orchard

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Lerryn Hill To Harris's Orchard, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 16:18.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Lerryn Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lerryn Road, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 16:18.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Road From Junction North Of Lerryn View To Yonder Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction North Of Lerryn View To Yonder Cottage, Lerryn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:58.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Road From Junction North Of Lerryn View To Yonder Cottage

Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction North Of Lerryn View To Yonder Cottage, Lerryn.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 1 Apr 2025 at 16:18.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Lanwithan Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lanwithan Road, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:53.

Cornwall Council logo
Between
27 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Lerryn Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Lerryn Road, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 16 May 2025 at 14:57.

Wales And West Utilities logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Lower Bore Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lower Bore Street, Bodmin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 25 Mar 2025 at 13:51.

Wales And West Utilities logo
Between
30 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Lower Bore Street

Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Lower Bore Street, Bodmin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 4 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wales And West Utilities on 25 Mar 2025 at 11:42.

Between
30 Jun and 18 Jul 2025
Details
View Map
Share
Follow
Prideaux Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Prideaux Road, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 18 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 15 Mar 2025 at 09:40.

Between
30 Jun and 9 Jul 2025
Details
View Map
Share
Road From Tremains Wood To Rock Mill

Wildanet were proposing to carry out Statutory Infrastructure Works on Road From Tremains Wood To Rock Mill, Prideaux, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 26 Mar 2025 at 16:19.

Between
30 Jun and 9 Jul 2025
Details
View Map
Share
Road From Tremains Wood To Rock Mill

Wildanet were proposing to carry out Statutory Infrastructure Works on Road From Tremains Wood To Rock Mill, Prideaux, St Blazey.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 9 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 27 Mar 2025 at 10:28.

Between
3 and 9 Jul 2025
Details
View Map
Share
Follow
Road From Carne Cross To Junction South West Of Wheal Par

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Carne Cross To Junction South West Of Wheal Par, Carne Cross, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 July 2025 and could run through until 9 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 07:59.

Between
17 and 29 Jul 2025
Details
View Map
Share
Follow
Road From A390 At Bridge Crossing To Sams Lane

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From A390 At Bridge Crossing To Sams Lane, Kilhallon, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 July 2025 and could run through until 29 July 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 07:48.

Between
21 and 30 Jul 2025
Details
View Map
Share
Follow
Road From Tremains Wood To Rock Mill

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Tremains Wood To Rock Mill, Prideaux, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 30 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 28 Mar 2025 at 09:22.

Cornwall Council logo
Between
21 and 23 Jul 2025
Details
View Map
Share
Follow
Old Coach Road

Cornwall Council are proposing to carry out Highway repair and maintenance works on Old Coach Road, Lanivet, Bodmin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 23 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Cornwall Council on 23 Apr 2025 at 15:24.

Cornwall Council logo
LONG TERM
Between
28 Jul and 3 Sep 2025
Details
View Map
Share
Follow
Bodmin Hill

Cornwall Council are proposing to carry out roadworks on Bodmin Hill, Lostwithiel.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Cornwall Council on 25 Feb 2025 at 12:32.

Between
29 Jul and 7 Aug 2025
Details
View Map
Share
Follow
Driving Lane

Wildanet are proposing to carry out Statutory Infrastructure Works on Driving Lane, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 July 2025 and could run through until 7 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 07:56.

Between
30 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Cornhill Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Cornhill Road, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 5 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 14:17.

Between
30 Jul and 5 Aug 2025
Details
View Map
Share
Follow
Road From Luxulyan Road To Cornhill Road

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Luxulyan Road To Cornhill Road, Bodelva, Par.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 5 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Wildanet on 20 Mar 2025 at 14:17.

BT logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
South Street

BT are proposing to carry out Utility asset works on South Street, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 May 2025 at 14:59.

BT logo
Between
4 and 8 Aug 2025
Details
View Map
Share
Follow
Castle Hill

BT are proposing to carry out Utility asset works on Castle Hill, Lostwithiel.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 8 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 7 May 2025 at 14:59.

Between
6 and 27 Aug 2025
Details
View Map
Share
Follow
Road From Junction North Of Prideux To Junction South Of Wheal Par

Wildanet are proposing to carry out Statutory Infrastructure Works on Road From Junction North Of Prideux To Junction South Of Wheal Par, St Blazey.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 27 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Wildanet on 14 Apr 2025 at 09:31.

South West Water logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Robartes Road

South West Water are proposing to carry out Utility repair and maintenance works on Robartes Road, Bodmin.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by South West Water on 9 May 2025 at 07:54.


Roadworks Map near to Couchwell Lane, LOSTWITHIEL, PL22 0BQ (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 20:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Couchwell Lane, LOSTWITHIEL, PL22 0BQ (6 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
South West Water logo
URGENT
  
THE BRAMBLES 
(0.1 miles)
South West Water
Utility repair and maintenance works - Footway - Give and take
Complete
30 May 2025 11:30 - 16:53
0.1
Details
Share
2
Cornwall Council logo
EMERGENCY
  
TERRAS HILL 
(0.2 miles)
Cornwall Council
Highway repair and maintenance works - Verge - Road closure
In Progress
Since: 15 Feb 2024 12:00
(Scheduled: 15 Feb 2024 - 29 Aug 2025)
0.2
Details
Share
Follow
3
South West Water logo
COTT ROAD 
(0.4 miles)
South West Water
Utility repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.4
Details
Share
Follow
4
South West Water logo
URGENT
  
LIDDICOAT ROAD 
(0.4 miles)
South West Water
Utility repair and maintenance works - Verge - No carriageway incursion
Complete
30 May 2025 09:17 - 11:37
0.4
Details
Share
5
BT logo
EDGECUMBE ROAD 
(0.4 miles)
BT
Utility asset works - Carriageway - Multi-way signals
Complete
2 Jun 2025 15:30 - 3 Jun 2025 15:45
0.4
Details
Share
6
South West Water logo
REEDS PARK 
(0.5 miles)
South West Water
Utility repair and maintenance works - Footway - Some carriageway incursion
Planned
Scheduled: 3 Jun 2025 - 5 Jun 2025
0.5
Details
Share
Follow