ROADWORKS SUMMARY
Liskeard Road, SALTASH, PL12 4RH
Introduction
View current and future planned roadworks and road closures for Liskeard Road, PL12 4RH and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Liskeard Road, SALTASH, PL12 4RH
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Liskeard Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
30 Apr 2025
Plymouth City Council are carrying out roadworks on Savage Road, Plymouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 May 2022 at 23:01 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Plymouth City Council on 24 Apr 2024 at 07:47.
30 May 2025
Cornwall Council are carrying out Highway repair and maintenance works on A374 Between Milladon Lane And Access To Trewin House, Polbathic.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 12:00 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 25 Sep 2024 at 10:39.
30 May 2025
Cornwall Council are carrying out Highway repair and maintenance works on A374 Between Access To Trewin House And Access To Trethill House, Sheviock.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 12:00 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 25 Sep 2024 at 10:39.
28 Feb 2025
Cornwall Council are carrying out Highway repair and maintenance works on King Street, Torpoint.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 14:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 23 Sep 2024 at 08:39.
14 Feb 2025
South West Water are carrying out Utility repair and maintenance works on Millbay Road, Plymouth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:30 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Jan 2025 at 08:38.
13 Jan and 14 Mar 2025
Western Power Distribution (South West) were proposing to carry out New service connection on Durnford Street, Plymouth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 7 Oct 2024 at 09:53.
13 Jan and 14 Mar 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Durnford Street, Plymouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:46.
14 Mar 2025
Western Power Distribution (South West) are carrying out New service connection on Durnford Street, Plymouth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 09:45 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 24 Jan 2025 at 14:35.
3 Apr 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Clittaford Road, Plymouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 24 January 2025 at 10:00 and could run through until 3 April 2025. The works will impact the footway, verge and footpath.
This roadwork event was last updated by Wales And West Utilities on 24 Jan 2025 at 11:56.
25 Mar 2025
Plymouth City Council are carrying out Highway repair and maintenance works on Millbridge, Plymouth.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 09:30 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Plymouth City Council on 29 Jan 2025 at 09:05.
20 Jan and 14 Mar 2025
Plymouth City Council are proposing to carry out Highway repair and maintenance works on Millbridge, Plymouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Plymouth City Council on 18 Dec 2024 at 16:17.
20 Jan and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Clittaford Road, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 28 March 2025. The works will impact the footway, verge and footpath.
This roadwork event was last updated by Wales And West Utilities on 23 Sep 2024 at 12:44.
20 Feb 2025
National Highways are carrying out Highway repair and maintenance works on A374 Between The A38 And Milladon Lane, Trerulefoot.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 20:00 and could run through until 20 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 28 Jan 2025 at 12:23.
31 Mar 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Alma Road, Plymouth.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 08:00 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 27 Jan 2025 at 09:07.
27 Jan and 31 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Alma Road, Plymouth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 12 Dec 2024 at 08:35.
27 Jan and 24 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Central Park Avenue, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 12 Dec 2024 at 08:41.
3 Mar 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Pennycomequick Hill, Plymouth.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 08:00 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 27 Jan 2025 at 09:05.
27 Jan and 3 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pennycomequick Hill, Plymouth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 12 Dec 2024 at 08:47.
24 Mar 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Central Park Avenue, Plymouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 08:00 and could run through until 24 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 27 Jan 2025 at 09:09.
27 Jan and 3 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Pennycomequick Roundabout, Plymouth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 12 Dec 2024 at 08:45.
3 Mar 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Pennycomequick Roundabout, Plymouth.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 08:00 and could run through until 3 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Wales And West Utilities on 27 Jan 2025 at 09:04.
27 Jan and 3 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Whittington Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 12 Dec 2024 at 08:37.
27 Jan and 7 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on North Road West, Plymouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 21 Nov 2024 at 16:19.
27 Jan and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Dunnet Road, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Wales And West Utilities on 23 Sep 2024 at 12:43.
3 Mar 2025
Wales And West Utilities are carrying out Utility repair and maintenance works on Whittington Street, Plymouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 08:00 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 27 Jan 2025 at 09:08.
27 Jan and 28 Mar 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Dunnet Road, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Wales And West Utilities on 24 Sep 2024 at 07:33.
27 Jan and 28 Mar 2025
Wales And West Utilities were proposing to carry out Utility repair and maintenance works on Clittaford Road, Plymouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 28 March 2025. The works were due to impact the footway, carriageway, verge and footpath.
This roadwork event was last updated by Wales And West Utilities on 20 Sep 2024 at 11:30.
Wales And West Utilities carried out Utility repair and maintenance works on Footpath North Of Southway Drive Serving Nos 1 - 153, Plymouth.
The works were originally planned between 28 Jan 2025 and 3 Feb 2025 and were actually completed between 28 Jan 2025 (10:01) and 30 Jan 2025 (10:16). The works impacted the footway and carriageway.
This roadwork event was last updated by Wales And West Utilities on 30 Jan 2025 at 10:21.
South West Water carried out Utility repair and maintenance works on Beauchamp Road, Plymouth.
The road was closed for some or all of the period.
The works were originally planned between 29 Jan 2025 and 4 Feb 2025 and were actually completed between 29 Jan 2025 (19:08) and 30 Jan 2025 (04:15). The works impacted the carriageway only.
This roadwork event was last updated by South West Water on 30 Jan 2025 at 08:37.
10 Feb and 1 Mar 2025
Plymouth City Council are proposing to carry out roadworks on A38 Through J A386 W, City Of Plymouth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 1 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Plymouth City Council on 25 Nov 2024 at 16:30.
10 Feb and 14 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on Mayflower Drive, Plymouth.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 12 Dec 2024 at 11:33.
10 Feb and 14 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on Mayflower Drive, Plymouth.
These works were categorised as Major.
A lane was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 3 Jan 2025 at 09:02.
10 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on Road From Junction North Of Stockadon Farm To Landulph, Landulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cornwall Council on 19 Nov 2024 at 15:11.
10 and 28 Feb 2025
Cornwall Council are proposing to carry out Highway improvement works on Road From Junction North Of Stockadon Farm To Landulph, Landulph.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 28 February 2025. The works will impact the verge only.
This roadwork event was last updated by Cornwall Council on 15 Jan 2025 at 15:30.
24 Feb and 4 Apr 2025
South West Water are proposing to carry out Utility repair and maintenance works on North Road West, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 29 Nov 2024 at 15:18.
24 Feb and 4 Apr 2025
South West Water are proposing to carry out Utility repair and maintenance works on North Road West, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 24 Jan 2025 at 08:57.
24 Feb and 21 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on James Street, Devonport, Plymouth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 10 Jan 2025 at 11:46.
24 Feb and 21 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on James Street, Devonport, Plymouth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Dec 2024 at 11:54.
24 Feb and 21 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on St Michaels Close, Plymouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Dec 2024 at 15:21.
27 Feb and 2 Mar 2025
Plymouth City Council are proposing to carry out roadworks on Ker Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Plymouth City Council on 10 Jan 2025 at 14:07.
28 Feb and 4 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on Dale Road, Plymouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 February 2025 and run through until 4 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 22 Nov 2024 at 09:18.
10 and 22 Mar 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Halton Barton To Farm Gate South Of Ashton Fields, St Dominick.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 2 Oct 2024 at 12:43.
17 Mar and 4 Apr 2025
Western Power Distribution (South West) were proposing to carry out New service connection on Admiralty Street, Stonehouse, Plymouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 15 Oct 2024 at 12:26.
17 Mar and 4 Apr 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Admiralty Street, Stonehouse, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:45.
17 Mar and 4 Apr 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Admiralty Street, Stonehouse, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 5 Nov 2024 at 07:46.
17 and 22 Mar 2025
Cornwall Council are proposing to carry out Highway repair and maintenance works on Road From Junction West Of Notter Bridge Farm To Junction East Of The Bungalow, Landrake.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 22 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 3 Jan 2025 at 11:23.
23 Mar and 7 Apr 2025
Plymouth City Council are proposing to carry out roadworks on Western Approach, Plymouth.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 March 2025 and could run through until 7 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Plymouth City Council on 23 Jan 2025 at 16:36.
24 Mar and 2 Jun 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Wingfield Road, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 14 Jan 2025 at 11:44.
24 Mar and 1 Apr 2025
South West Water are proposing to carry out Utility repair and maintenance works on Warfelton Crescent, Saltash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 16 Dec 2024 at 09:11.
24 Mar and 2 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on North Down Gardens, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:37.
24 Mar and 2 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Wingfield Way, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 14 Jan 2025 at 11:48.
24 Mar and 2 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Royal Navy Avenue, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:30.
31 Mar and 2 Jun 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New Passage Hill, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:40.
31 Mar and 2 Jun 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Marlborough Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:43.
31 Mar and 3 Apr 2025
BT are proposing to carry out Utility asset works on Market Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 28 Jan 2025 at 17:34.
31 Mar and 3 Apr 2025
BT are proposing to carry out Utility asset works on Stonehouse Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Jan 2025 at 17:56.
31 Mar and 3 Apr 2025
BT are proposing to carry out Utility asset works on Stonehouse Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 17 Jan 2025 at 09:35.
31 Mar and 3 Apr 2025
BT are proposing to carry out Utility asset works on Stonehouse Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 15 Jan 2025 at 14:19.
9 and 11 Apr 2025
BT are proposing to carry out Utility asset works on Road To Rear Of 1 - 65 Sydney Road, Torpoint.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 Nov 2024 at 07:23.
9 and 11 Apr 2025
BT are proposing to carry out Utility asset works on Road To Rear Of 1 - 65 Sydney Road, Torpoint.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 8 Nov 2024 at 14:12.
14 and 18 Apr 2025
BT are proposing to carry out Utility asset works on Glen Park Avenue Lane, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 17 Jan 2025 at 16:24.
14 Apr and 9 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Carnock Road, Plymouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 24 Dec 2024 at 09:33.
14 Apr and 2 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Henderson Place, Plymouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:34.
14 Apr and 9 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Carnock Road, Plymouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 9 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 24 Dec 2024 at 11:55.
23 and 29 Apr 2025
Wildanet were proposing to carry out Utility asset works on Road From Broad Lane To Liskeard Road, Trematon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wildanet on 30 Jan 2025 at 09:44.
23 and 29 Apr 2025
Wildanet were proposing to carry out Utility asset works on Road From Broad Lane To Liskeard Road, Trematon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wildanet on 29 Jan 2025 at 12:30.
Roadworks Map near to Liskeard Road, SALTASH, PL12 4RH
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Liskeard Road, SALTASH, PL12 4RH (5 Events)
(Scheduled Dates)
(miles)
(Scheduled: 30 Jan 2025)