ROADWORKS SUMMARY
Freathy Cliff, Millbrook, TORPOINT, PL10 1JT
Introduction
View current and future planned roadworks and road closures for PL10 1JT and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Freathy Cliff, Millbrook, TORPOINT, PL10 1JT
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
New Alerting Facility
We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.
Simply click on the Follow button to opt in and of course, you may cancel them at any time.
Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.
30 Apr 2025
Plymouth City Council are carrying out roadworks on Savage Road, Plymouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 31 May 2022 at 23:01 and could run through until 30 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Plymouth City Council on 24 Apr 2024 at 07:47.
30 May 2025
Cornwall Council are carrying out Highway repair and maintenance works on A374 Between Milladon Lane And Access To Trewin House, Polbathic.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 12:00 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 25 Sep 2024 at 10:39.
30 May 2025
Cornwall Council are carrying out Highway repair and maintenance works on A374 Between Access To Trewin House And Access To Trethill House, Sheviock.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 March 2024 at 12:00 and could run through until 30 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 25 Sep 2024 at 10:39.
28 Feb 2025
Cornwall Council are carrying out Highway repair and maintenance works on King Street, Torpoint.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 April 2024 at 14:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Cornwall Council on 23 Sep 2024 at 08:39.
20 Nov 2025
Plymouth City Council are carrying out roadworks on Colin Campbell Court, Plymouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 20 May 2024 at 07:00 and could run through until 20 November 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Plymouth City Council on 2 Dec 2024 at 08:21.
24 Apr 2025
Plymouth City Council are carrying out roadworks on Grand Hotel Road, Plymouth.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 3 June 2024 at 08:00 and could run through until 24 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Plymouth City Council on 16 Jan 2025 at 08:50.
14 Feb 2025
South West Water are carrying out Utility repair and maintenance works on Millbay Road, Plymouth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 6 January 2025 at 08:30 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Jan 2025 at 08:38.
Tomorrow
South West Water were proposing to carry out Utility repair and maintenance works on Military Road, Torpoint.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 9 Oct 2024 at 11:57.
Tomorrow
South West Water were proposing to carry out Utility repair and maintenance works on Military Road, Torpoint.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 31 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 11 Sep 2024 at 12:34.
13 Jan and 14 Mar 2025
Western Power Distribution (South West) were proposing to carry out New service connection on Durnford Street, Plymouth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 7 Oct 2024 at 09:53.
13 Jan and 14 Mar 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Durnford Street, Plymouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:46.
14 Mar 2025
Western Power Distribution (South West) are carrying out New service connection on Durnford Street, Plymouth.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 January 2025 at 09:45 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 24 Jan 2025 at 14:35.
20 Jan and 14 Mar 2025
Plymouth City Council are proposing to carry out Highway repair and maintenance works on Millbridge, Plymouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Plymouth City Council on 18 Dec 2024 at 16:17.
25 Mar 2025
Plymouth City Council are carrying out Highway repair and maintenance works on Millbridge, Plymouth.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 20 January 2025 at 09:30 and could run through until 25 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Plymouth City Council on 29 Jan 2025 at 09:05.
27 Jan and 7 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on North Road West, Plymouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 21 Nov 2024 at 16:19.
24 Feb and 4 Apr 2025
South West Water are proposing to carry out Utility repair and maintenance works on North Road West, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 29 Nov 2024 at 15:18.
24 Feb and 4 Apr 2025
South West Water are proposing to carry out Utility repair and maintenance works on North Road West, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 4 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 24 Jan 2025 at 08:57.
24 Feb and 21 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on James Street, Devonport, Plymouth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 10 Jan 2025 at 11:46.
24 Feb and 21 Mar 2025
South West Water were proposing to carry out Utility repair and maintenance works on James Street, Devonport, Plymouth.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 24 February 2025 and run through until 21 March 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Dec 2024 at 11:54.
24 Feb and 21 Mar 2025
South West Water are proposing to carry out Utility repair and maintenance works on St Michaels Close, Plymouth.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 February 2025 and could run through until 21 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 6 Dec 2024 at 15:21.
27 Feb and 2 Mar 2025
Plymouth City Council are proposing to carry out roadworks on Ker Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 February 2025 and could run through until 2 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Plymouth City Council on 10 Jan 2025 at 14:07.
17 Mar and 4 Apr 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Admiralty Street, Stonehouse, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 5 Nov 2024 at 07:46.
17 Mar and 4 Apr 2025
Western Power Distribution (South West) are proposing to carry out New service connection on Admiralty Street, Stonehouse, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 24 Oct 2024 at 09:45.
17 Mar and 4 Apr 2025
Western Power Distribution (South West) were proposing to carry out New service connection on Admiralty Street, Stonehouse, Plymouth.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 17 March 2025 and run through until 4 April 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Western Power Distribution (South West) on 15 Oct 2024 at 12:26.
24 Mar and 2 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Royal Navy Avenue, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:30.
24 Mar and 2 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Wingfield Way, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 14 Jan 2025 at 11:48.
24 Mar and 2 Jun 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Wingfield Road, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 14 Jan 2025 at 11:44.
24 Mar and 2 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on North Down Gardens, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:37.
24 Mar and 1 Apr 2025
South West Water are proposing to carry out Utility repair and maintenance works on Warfelton Crescent, Saltash.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 March 2025 and could run through until 1 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by South West Water on 16 Dec 2024 at 09:11.
31 Mar and 3 Apr 2025
BT are proposing to carry out Utility asset works on Stonehouse Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 21 Jan 2025 at 17:56.
31 Mar and 2 Jun 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on New Passage Hill, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:40.
31 Mar and 2 Jun 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Marlborough Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 2 June 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:43.
31 Mar and 3 Apr 2025
BT are proposing to carry out Utility asset works on Market Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 28 Jan 2025 at 17:34.
31 Mar and 3 Apr 2025
BT are proposing to carry out Utility asset works on Stonehouse Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 17 Jan 2025 at 09:35.
31 Mar and 3 Apr 2025
BT are proposing to carry out Utility asset works on Stonehouse Street, Plymouth.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 March 2025 and could run through until 3 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by BT on 15 Jan 2025 at 14:19.
9 and 11 Apr 2025
BT are proposing to carry out Utility asset works on Road To Rear Of 1 - 65 Sydney Road, Torpoint.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 8 Nov 2024 at 14:12.
9 and 11 Apr 2025
BT are proposing to carry out Utility asset works on Road To Rear Of 1 - 65 Sydney Road, Torpoint.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 April 2025 and could run through until 11 April 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by BT on 14 Nov 2024 at 07:23.
14 Apr and 2 May 2025
Wales And West Utilities are proposing to carry out Utility repair and maintenance works on Henderson Place, Plymouth.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Wales And West Utilities on 16 Jan 2025 at 12:34.
22 and 25 Apr 2025
BT were proposing to carry out Utility asset works on New Road, Cawsand.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 16 Jan 2025 at 11:12.
22 and 25 Apr 2025
BT were proposing to carry out Utility asset works on Green Park, Cawsand.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 25 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 16 Jan 2025 at 11:12.
22 and 24 Apr 2025
BT were proposing to carry out Utility asset works on New Road, Cawsand.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 22 April 2025 and run through until 24 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by BT on 16 Jan 2025 at 11:15.
23 and 29 Apr 2025
Wildanet were proposing to carry out Utility asset works on Road From Broad Lane To Liskeard Road, Trematon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wildanet on 30 Jan 2025 at 09:44.
23 and 29 Apr 2025
Wildanet were proposing to carry out Utility asset works on Road From Broad Lane To Liskeard Road, Trematon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 23 April 2025 and run through until 29 April 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Wildanet on 29 Jan 2025 at 12:30.
28 Apr and 2 May 2025
Western Power Distribution (South West) were proposing to carry out Utility repair and maintenance works on Tregunnus Lane, Downderry.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 April 2025 and run through until 2 May 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (South West) on 30 Jan 2025 at 12:18.
Roadworks Map near to Freathy Cliff, Millbrook, TORPOINT, PL10 1JT (3 Events)
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Freathy Cliff, Millbrook, TORPOINT, PL10 1JT (3 Events)
(Scheduled Dates)
(miles)
(Scheduled: 19 Mar 2024 - 9 Feb 2025)
Contains public sector information licensed under the Open Government Licence v3.0.