ROADWORKS SUMMARY
George Gardens, PETERBOROUGH, PE7 1RQ
Introduction
View current and future planned roadworks and road closures for George Gardens, PE7 1RQ and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to George Gardens, PETERBOROUGH, PE7 1RQ
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for George Gardens are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 May 2024
Cambridgeshire County Council are carrying out Highway improvement works on Benwick Road, Whittlesey.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 5 October 2023 at 12:00 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 31 Jan 2024 at 08:11.
24 May 2024
Peterborough City Council are carrying out Highway improvement works on Edgerley Drain Road, Fengate, Peterborough.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 09:51 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 11 Apr 2024 at 18:02.
24 May 2024
Peterborough City Council are carrying out Highway improvement works on Vicarage Farm Road, Fengate, Peterborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 09:51 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 11 Apr 2024 at 18:02.
24 May 2024
Peterborough City Council are carrying out Highway improvement works on Storeys Bar Road, Fengate, Peterborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 13 November 2023 at 09:51 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 11 Apr 2024 at 17:57.
Wednesday
Cadent Gas are carrying out Utility asset works on Stonald Road, Whittlesey.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2024 at 11:41 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cadent Gas on 7 Mar 2024 at 11:44.
Friday
Peterborough City Council are carrying out Highway improvement works on North Bank To Fitzwilliam Bridge Cyclepath, Peterborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 March 2024 at 13:35 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 25 Apr 2024 at 12:40.
31 May 2024
Cambridgeshire County Council are carrying out Highway repair and maintenance works on East Delph, Whittlesey.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 March 2024 at 18:00 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 19 Apr 2024 at 07:18.
Friday
Peterborough City Council are carrying out Highway improvement works on Pearces Road To The River Nene Cyclepath, Peterborough.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 18 March 2024 at 09:40 and could run through until 3 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 23 Apr 2024 at 11:26.
Tomorrow
Anglian Water are proposing to carry out Utility repair and maintenance works on Rayner Avenue, Stanground, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 11 Apr 2024 at 16:41.
Tomorrow
Peterborough City Council are proposing to carry out Highway improvement works on Frank Perkins Parkway Roundabout 5 Southbound Off Slip Road, Fengate, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 30 April 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 16 Apr 2024 at 18:06.
Wednesday
Anglian Water are proposing to carry out Utility repair and maintenance works on Wright Avenue, Stanground, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 1 Feb 2024 at 14:56.
30 Apr and 7 May 2024
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Andrewes Close, Farcet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 7 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 17 Apr 2024 at 14:57.
30 Apr and 7 May 2024
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Marshalls Way, Farcet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 April 2024 and could run through until 7 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 17 Apr 2024 at 14:58.
6 and 13 May 2024
Peterborough City Council are proposing to carry out Highway improvement works on Old Knarr Fen Drove, Thorney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 15 Apr 2024 at 15:16.
7 and 13 May 2024
Peterborough City Council are proposing to carry out Highway improvement works on Laurel Drive, Thorney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 11 Mar 2024 at 08:45.
7 and 13 May 2024
Virgin Media are proposing to carry out Utility asset works on Princes Road, Fletton, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Virgin Media on 17 Apr 2024 at 12:17.
7 and 13 May 2024
UK Power Networks Eastern & London are proposing to carry out New service connection on Princes Road, Fletton, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 May 2024 and could run through until 13 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by UK Power Networks Eastern & London on 27 Feb 2024 at 21:38.
10 and 12 May 2024
Peterborough City Council are proposing to carry out Highway improvement works on Broadway, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 May 2024 and could run through until 12 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 17 Apr 2024 at 13:00.
12 and 14 May 2024
Peterborough City Council are proposing to carry out Highway improvement works on Whittlesey Road, Thorney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 17 Apr 2024 at 12:43.
13 and 15 May 2024
Peterborough City Council are proposing to carry out Highway improvement works on Frank Perkins Parkway Junction 7 Southbound On Slip Road, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 May 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 16 Apr 2024 at 18:11.
14 and 17 May 2024
Peterborough City Council are proposing to carry out Highway improvement works on Whittlesey Road, Thorney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 26 Apr 2024 at 10:25.
14 and 16 May 2024
Peterborough City Council are proposing to carry out Highway improvement works on Fletton Parkway Junction 3a Westbound On Slip Road, Kingston Park, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 May 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 16 Apr 2024 at 18:11.
15 and 20 May 2024
Peterborough City Council are proposing to carry out Remedial works on Cavendish Street, Eastfield, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 May 2024 and could run through until 20 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 24 Apr 2024 at 15:47.
20 and 29 May 2024
Peterborough City Council are proposing to carry out Highway improvement works on Broadway, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 May 2024 and could run through until 29 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 25 Apr 2024 at 14:40.
21 and 24 May 2024
Peterborough City Council are proposing to carry out Remedial works on Eastfield Grove, Eastfield, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 May 2024 and could run through until 24 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 24 Apr 2024 at 15:47.
26 and 28 May 2024
Hutchinson 3G are proposing to carry out Utility asset works on Norman Road, Eastfield, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 May 2024 and could run through until 28 May 2024. The works will impact the verge only.
This roadwork event was last updated by Hutchinson 3G on 25 Apr 2024 at 15:17.
27 May and 19 Jul 2024
Peterborough City Council are proposing to carry out Highway improvement works on Henshaw, Parnwell, Peterborough.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 19 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 25 Apr 2024 at 16:46.
27 May and 8 Jul 2024
Peterborough City Council are proposing to carry out Highway improvement works on Oxney Road, Peterborough.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 8 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 23 Apr 2024 at 14:41.
27 May and 19 Jul 2024
Peterborough City Council are proposing to carry out Highway improvement works on Finchfield To Oxney Road Cyclepath, Parnwell, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 May 2024 and could run through until 19 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 25 Apr 2024 at 16:57.
28 May and 11 Jun 2024
National Highways are proposing to carry out Works for road purposes on A1139 Link Road Between Peterborough Road And Eye Bypass, Eye.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Apr 2024 at 12:36.
28 May and 11 Jun 2024
National Highways are proposing to carry out Works for road purposes on Crowland Road, Eye.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Apr 2024 at 12:46.
28 May and 11 Jun 2024
National Highways are proposing to carry out Works for road purposes on White Post Road South, Eye.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Apr 2024 at 12:33.
28 May and 11 Jun 2024
National Highways are proposing to carry out Works for road purposes on Crowland Road, Eye Green.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Apr 2024 at 12:42.
28 May and 11 Jun 2024
National Highways are proposing to carry out Works for road purposes on The Causeway, Thorney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Apr 2024 at 12:52.
28 May and 11 Jun 2024
National Highways are proposing to carry out Works for road purposes on Station Road, Thorney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 May 2024 and could run through until 11 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by National Highways on 24 Apr 2024 at 13:02.
29 and 31 May 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Wype Road, Eastrea.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 3 Apr 2024 at 10:41.
31 May and 4 Jun 2024
Peterborough City Council are proposing to carry out Highway improvement works on The Woodlands, Eastfield, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 31 May 2024 and could run through until 4 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 4 Apr 2024 at 16:57.
3 and 7 Jun 2024
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Peterborough Road (A605), Whittlesey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 7 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 20 Mar 2024 at 11:51.
3 and 5 Jun 2024
Peterborough City Council are proposing to carry out Highway improvement works on Milton Road, Fletton, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 4 Apr 2024 at 16:57.
11 and 13 Jun 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Park Road, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 27 Feb 2024 at 09:20.
11 and 13 Jun 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Fitzwilliam Street, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 13 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 4 Mar 2024 at 09:36.
11 and 21 Jun 2024
Peterborough City Council are proposing to carry out Highway improvement works on Northminster To Stanley Recreation Ground Cyclepath, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 19 Apr 2024 at 11:07.
23 Jun and 9 Jul 2024
Peterborough City Council are proposing to carry out Highway improvement works on Whittlesey Road, Stanground, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 9 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 25 Apr 2024 at 10:57.
23 and 28 Jun 2024
Peterborough City Council are proposing to carry out Highway improvement works on Chestnut Avenue, Dogsthorpe, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 18 Apr 2024 at 14:38.
24 and 28 Jun 2024
Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Ramsey Road, Pondersbridge.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 28 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Cambridgeshire County Council on 18 Apr 2024 at 13:44.
24 Jun and 13 Jul 2024
Peterborough City Council are proposing to carry out Highway repair and maintenance works on Frank Perkins Parkway Roundabout 5 Northbound On Slip Road, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 13 July 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Peterborough City Council on 22 Apr 2024 at 15:24.
27 and 29 Jun 2024
Peterborough City Council are proposing to carry out Highway improvement works on Newark Road, Fengate, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 June 2024 and could run through until 29 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 18 Apr 2024 at 14:16.
30 Jun and 15 Nov 2024
Peterborough City Council are proposing to carry out Highway improvement works on Peterborough 45 Section 1 Footpath, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 19 Apr 2024 at 12:19.
5 and 9 Jul 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Park Road, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 24 Apr 2024 at 09:36.
9 Jul 2024
UK Power Networks Eastern & London are proposing to carry out Utility repair and maintenance works on Whittlesey Bridleway 3, Whittlesey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works are scheduled for 9 July 2024 and are due to last for only one day. The works will impact the verge only.
This roadwork event was last updated by UK Power Networks Eastern & London on 10 Apr 2024 at 13:25.
9 and 11 Jul 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Peterborough Road, Farcet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 July 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 9 Apr 2024 at 12:44.
14 and 24 Jul 2024
Peterborough City Council are proposing to carry out Highway improvement works on North Side, Thorney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 10 Apr 2024 at 10:56.
14 Jul and 5 Aug 2024
Peterborough City Council are proposing to carry out Highway improvement works on South Street, Stanground, Peterborough.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 5 August 2024. The works will impact the carriageway only.
This roadwork event was last updated by Peterborough City Council on 26 Apr 2024 at 11:37.
21 and 23 Jul 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Whittlesey Byway 31, Whittlesey.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 23 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 26 Apr 2024 at 11:45.
26 and 28 Jul 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Peterborough Road, Farcet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 July 2024 and could run through until 28 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 17 Apr 2024 at 14:30.
Roadworks Map near to George Gardens, PETERBOROUGH, PE7 1RQ
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to George Gardens, PETERBOROUGH, PE7 1RQ (6 Events)
(Scheduled Dates)
(miles)
(Scheduled: 8 Jan 2024 - 1 May 2024)
Contains public sector information licensed under the Open Government Licence v3.0.