ROADWORKS SUMMARY
Red Lion Close, HUNTINGDON, PE28 4EJ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Red Lion Close, PE28 4EJ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Red Lion Close, HUNTINGDON, PE28 4EJ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Red Lion Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Cambridgeshire County Council logo
LONG TERM
Until
26 Feb 2027
Details
View Map
Share
Follow
Ermine Street

Cambridgeshire County Council are carrying out Highway improvement works on Ermine Street, Little Stukeley.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 June 2026 at 09:30 and could run through until 26 February 2027. The works will impact the footway, carriageway, verge and footpath.

This roadwork event was last updated by Cambridgeshire County Council on 4 Sep 2026 at 12:38.

Cambridgeshire County Council logo
LONG TERM
Until
31 Oct 2026
Details
View Map
Share
Follow
Edison Bell Way

Cambridgeshire County Council are carrying out New service connection on Edison Bell Way, Huntingdon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 July 2026 at 12:25 and could run through until 31 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 14 Aug 2026 at 15:44.

Cambridgeshire County Council logo
LONG TERM
Until
31 Oct 2026
Details
View Map
Share
Follow
Edison Bell Way

Cambridgeshire County Council are carrying out Section 50 on Edison Bell Way, Huntingdon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 June 2026 at 08:00 and could run through until 31 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Aug 2026 at 15:44.

Cambridgeshire County Council logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Stukeley Bypass E/bound

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Stukeley Bypass E/bound, The Stukeleys.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 27 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 14 Sep 2026 at 16:31.

Cambridgeshire County Council logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Huntingdon Southern Bypass W/bound

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Huntingdon Southern Bypass W/bound, Huntingdon.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Sep 2026 at 16:31.

Cambridgeshire County Council logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Stukeley Bypass E/bound

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Stukeley Bypass E/bound, The Stukeleys.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 14 Sep 2026 at 16:31.

Cambridgeshire County Council logo
LONG TERM
Until
27 Sep 2026
Details
View Map
Share
Follow
Stukeley Bypass W/bound

Cambridgeshire County Council are carrying out Highway repair and maintenance works on Stukeley Bypass W/bound, The Stukeleys.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 July 2026 at 08:00 and could run through until 27 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 14 Sep 2026 at 16:31.

Cambridgeshire County Council logo
LONG TERM
Between
17 Aug and 27 Sep 2026
Details
View Map
Share
Follow
Spittals Way

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Spittals Way, The Stukeleys.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 August 2026 and could run through until 27 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 5 Jun 2026 at 13:56.

National Highways logo
LONG TERM
Between
1 Sep and 23 Nov 2026
Details
View Map
Share
Follow
Brampton Bypass A141(T) - W/bound

National Highways are proposing to carry out Works for road purposes on Brampton Bypass A141(T) - W/bound, Brampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 4 Aug 2026 at 08:44.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Barham Road

BT are carrying out Utility asset works on Barham Road, Alconbury Weston.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Sep 2026 at 09:26.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Alconbury Weston Street

BT are carrying out Utility asset works on Alconbury Weston Street, Buckworth.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 Sep 2026 at 15:56.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Alconbury Weston Lane

BT are carrying out Utility asset works on Alconbury Weston Lane, Barham.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 September 2026 at 09:30 and could run through until 18 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Sep 2026 at 09:25.

Cambridgeshire County Council logo
LONG TERM
Between
9 Sep and 13 Nov 2026
Details
View Map
Share
Follow
Ermine Street

Cambridgeshire County Council are proposing to carry out Highway improvement works on Ermine Street, Great Stukeley.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2026 and could run through until 13 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 26 Aug 2026 at 07:59.

BT logo
Finishing
Tuesday
Details
View Map
Share
Follow
The Wheatsheaves

BT are carrying out Utility asset works on The Wheatsheaves, Sawtry.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 15 September 2026 at 10:00 and could run through until 22 September 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 16 Sep 2026 at 09:23.

Cambridgeshire County Council logo
Between
25 and 28 Sep 2026
Details
View Map
Share
Follow
Brampton Road

Cambridgeshire County Council are proposing to carry out Highway improvement works on Brampton Road, Huntingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2026 and could run through until 28 September 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Cambridgeshire County Council on 8 Sep 2026 at 11:44.

National Highways logo
LONG TERM
Between
28 Sep and 23 Nov 2026
Details
View Map
Share
Follow
Brampton Bypass A141(T) - W/bound

National Highways are proposing to carry out Works for road purposes on Brampton Bypass A141(T) - W/bound, Brampton.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 23 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 2 Sep 2026 at 14:32.

BT logo
Between
1 and 7 Oct 2026
Details
View Map
Share
Follow
Durham Close

BT are proposing to carry out Utility asset works on Durham Close, Sawtry.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2026 and could run through until 7 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 16 Sep 2026 at 15:28.

Cambridgeshire County Council logo
Between
2 and 6 Oct 2026
Details
View Map
Share
Follow
Mill Road

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Mill Road, Hartford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 6 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 27 Aug 2026 at 11:20.

Cambridgeshire County Council logo
Between
5 and 30 Oct 2026
Details
View Map
Share
Follow
Godmanchester Footpath 14

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on Godmanchester Footpath 14, Godmanchester.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 30 October 2026. The works will impact the footpath only.

This roadwork event was last updated by Cambridgeshire County Council on 3 Sep 2026 at 15:27.

Cambridgeshire County Council logo
Between
5 and 9 Oct 2026
Details
View Map
Share
Follow
Brampton Bypass Westbound On Slip From Brampton

Cambridgeshire County Council are proposing to carry out Core Sampling on Brampton Bypass Westbound On Slip From Brampton, Brampton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 9 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 24 Aug 2026 at 11:35.

Cambridgeshire County Council logo
Between
19 and 23 Oct 2026
Details
View Map
Share
Follow
The Walks East

Cambridgeshire County Council are proposing to carry out Highway repair and maintenance works on The Walks East, Huntingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 23 October 2026. The works will impact the footway only.

This roadwork event was last updated by Cambridgeshire County Council on 10 Jun 2026 at 12:17.

Cambridgeshire County Council logo
LONG TERM
Between
26 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Brampton Road

Cambridgeshire County Council are proposing to carry out Core Sampling on Brampton Road, Huntingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 27 Aug 2026 at 12:59.

Cambridgeshire County Council logo
LONG TERM
Between
26 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Thrapston Road (B1514)

Cambridgeshire County Council are proposing to carry out Core Sampling on Thrapston Road (B1514), Brampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 27 Aug 2026 at 09:39.

Cambridgeshire County Council logo
LONG TERM
Between
26 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Huntingdon Road

Cambridgeshire County Council are proposing to carry out Core Sampling on Huntingdon Road, Brampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Cambridgeshire County Council on 27 Aug 2026 at 09:49.

Cambridgeshire County Council logo
LONG TERM
Between
26 Oct and 27 Nov 2026
Details
View Map
Share
Follow
Church Road

Cambridgeshire County Council are proposing to carry out Core Sampling on Church Road, Brampton.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 27 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Cambridgeshire County Council on 27 Aug 2026 at 09:44.

Anglian Water logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Main Street

Anglian Water are proposing to carry out Utility repair and maintenance works on Main Street, Upton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 5 Aug 2026 at 08:17.


Roadworks Map near to Red Lion Close, HUNTINGDON, PE28 4EJ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 16 Sep 2026 21:06
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Red Lion Close, HUNTINGDON, PE28 4EJ (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Cambridgeshire County Council logo
MAJOR
  
ERMINE STREET 
(0.8 miles)
Cambridgeshire County Council
Highway improvement works - Footway, Carriageway, Verge, Footpath - Road closure
In Progress
Since: 1 Jun 2026 09:30
(Scheduled: 10 May 2026 - 26 Feb 2027)
0.8
Details
Share
Follow
2
Cambridgeshire County Council logo
ERMINE STREET 
(0.9 miles)
Cambridgeshire County Council
Highway improvement works - Footway, Verge - Two-way signals
Complete
8 Sep 2026 20:00 - 16 Sep 2026 01:00
0.9
Details
Share
3
Anglian Water logo
HIGH STREET 
(0.9 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 15 Sep 2026 - 17 Sep 2026)
0.9
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.