ROADWORKS SUMMARY
St. John Street, SKEGNESS, PE24 4DH

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for St. John Street, PE24 4DH and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to St. John Street, SKEGNESS, PE24 4DH

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for St. John Street are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Lincolnshire County Council logo
LONG TERM
Between
5 Aug and 30 Sep 2026
Details
View Map
Share
Follow
Sandbeck Avenue

Lincolnshire County Council are proposing to carry out Highway improvement works on Sandbeck Avenue, Skegness.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 5 August 2026 and could run through until 30 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Lincolnshire County Council on 19 Jun 2026 at 07:57.

Lincolnshire County Council logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Beresford Avenue

Lincolnshire County Council are carrying out Highway improvement works on Beresford Avenue, Skegness.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 5 Aug 2026 at 08:39.

Lincolnshire County Council logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Beckett Close

Lincolnshire County Council are carrying out Highway improvement works on Beckett Close, Skegness.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 5 Aug 2026 at 08:39.

Lincolnshire County Council logo
LONG TERM
Until
30 Sep 2026
Details
View Map
Share
Follow
Beresford Crescent

Lincolnshire County Council are carrying out Highway improvement works on Beresford Crescent, Skegness.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 August 2026 at 08:00 and could run through until 30 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 5 Aug 2026 at 08:39.

Quickline Commucations logo
Finishing
Tuesday
Details
View Map
Share
Follow
Pinchbeck Lane

Quickline Commucations are carrying out Utility repair and maintenance works on Pinchbeck Lane, Croft.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 September 2026 at 08:00 and could run through until 22 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 14 Sep 2026 at 09:40.

Anglian Water logo
Finishing
Tuesday
Details
View Map
Share
Follow
Dickon Hill Road

Anglian Water are carrying out Utility repair and maintenance works on Dickon Hill Road, Friskney.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 16 September 2026 at 06:18 and could run through until 22 September 2026. The works will impact the verge only.

This roadwork event was last updated by Anglian Water on 16 Sep 2026 at 07:54.

Lincolnshire County Council logo
Finishing
Tuesday
Details
View Map
Share
Follow
Briar Way

Lincolnshire County Council are carrying out Highway improvement works on Briar Way, Skegness.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 September 2026 at 08:00 and could run through until 22 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 17 Sep 2026 at 09:22.

Quickline Commucations logo
Finishing
Wednesday
Details
View Map
Share
Follow
Low Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Low Road, Wainfleet St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2026 and could run through until 23 September 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 13 Jul 2026 at 11:31.

Anglian Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Croft Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Croft Lane, Croft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 16 Jun 2026 at 14:01.

Anglian Water logo
Between
22 and 24 Sep 2026
Details
View Map
Share
Follow
Croft Lane

Anglian Water are proposing to carry out Utility repair and maintenance works on Croft Lane, Croft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2026 and could run through until 24 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 11 Sep 2026 at 08:38.

Quickline Commucations logo
Between
23 Sep and 6 Oct 2026
Details
View Map
Share
Thorpe Bank

Quickline Commucations were proposing to carry out Utility repair and maintenance works on Thorpe Bank, Little Steeping.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2026 and run through until 6 October 2026. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 16 Sep 2026 at 10:34.

Quickline Commucations logo
Between
28 Sep and 6 Oct 2026
Details
View Map
Share
Follow
Thorpe Bank

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Thorpe Bank, Little Steeping.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 September 2026 and could run through until 6 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 16 Sep 2026 at 10:37.

Lincolnshire County Council logo
Between
30 Sep and 2 Oct 2026
Details
View Map
Share
Follow
Wainfleet Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Wainfleet Road, Burgh Le Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 September 2026 and could run through until 2 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 11 Jun 2026 at 15:41.

Western Power Distribution (East Midlands) logo
Between
2 and 20 Oct 2026
Details
View Map
Share
Follow
Lancaster Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lancaster Avenue, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2026 and could run through until 20 October 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 11 Sep 2026 at 10:05.

BT logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Low Road

BT are proposing to carry out Utility repair and maintenance works on Low Road, Lincolnshire, Croft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the verge only.

This roadwork event was last updated by BT on 9 Jun 2026 at 10:19.

Anglian Water logo
Between
5 and 16 Oct 2026
Details
View Map
Share
Follow
Lyndhurst Avenue

Anglian Water are proposing to carry out Utility repair and maintenance works on Lyndhurst Avenue, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 16 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 27 Feb 2026 at 14:36.

Quickline Commucations logo
Between
5 and 7 Oct 2026
Details
View Map
Share
Follow
Outfield Lane

Quickline Commucations are proposing to carry out Utility asset works on Outfield Lane, Bratoft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 7 October 2026. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 31 Jul 2026 at 10:07.

Quickline Commucations logo
Between
5 and 8 Oct 2026
Details
View Map
Share
Follow
Low Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Low Road, Wainfleet St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2026 and could run through until 8 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 13 Jul 2026 at 11:43.

Anglian Water logo
Between
7 and 9 Oct 2026
Details
View Map
Share
Follow
Station Road

Anglian Water are proposing to carry out New service connection on Station Road, Thorpe St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 9 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 22 Jul 2026 at 11:14.

Lincolnshire County Council logo
Between
7 and 27 Oct 2026
Details
View Map
Share
Follow
The Meadows

Lincolnshire County Council are proposing to carry out Highway improvement works on The Meadows, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 25 Aug 2026 at 08:50.

Lincolnshire County Council logo
Between
7 and 27 Oct 2026
Details
View Map
Share
Follow
The Meadows

Lincolnshire County Council are proposing to carry out Highway improvement works on The Meadows, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 19 Aug 2026 at 10:50.

Lincolnshire County Council logo
Between
7 and 27 Oct 2026
Details
View Map
Share
Follow
Moss Drive

Lincolnshire County Council are proposing to carry out Highway improvement works on Moss Drive, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 25 Aug 2026 at 08:50.

Lincolnshire County Council logo
Between
7 and 27 Oct 2026
Details
View Map
Share
Follow
Moss Drive

Lincolnshire County Council are proposing to carry out Highway improvement works on Moss Drive, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 19 Aug 2026 at 10:50.

Lincolnshire County Council logo
Between
7 and 27 Oct 2026
Details
View Map
Share
Follow
Johnson Close

Lincolnshire County Council are proposing to carry out Highway improvement works on Johnson Close, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 19 Aug 2026 at 10:50.

Lincolnshire County Council logo
Between
7 and 27 Oct 2026
Details
View Map
Share
Follow
Johnson Close

Lincolnshire County Council are proposing to carry out Highway improvement works on Johnson Close, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 October 2026 and could run through until 27 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 25 Aug 2026 at 08:50.

Quickline Commucations logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Vicarage Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Vicarage Lane, Wainfleet St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 27 Jul 2026 at 10:00.

Quickline Commucations logo
Between
12 and 14 Oct 2026
Details
View Map
Share
Follow
Low Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Low Road, Croft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 October 2026 and could run through until 14 October 2026. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 27 Jul 2026 at 10:11.

Quickline Commucations logo
Between
19 and 21 Oct 2026
Details
View Map
Share
Follow
West Gate

Quickline Commucations are proposing to carry out Utility repair and maintenance works on West Gate, Wainfleet All Saints.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 October 2026 and could run through until 21 October 2026. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 24 Jul 2026 at 09:26.

Lincolnshire County Council logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Churchill Avenue

Lincolnshire County Council are proposing to carry out Highway improvement works on Churchill Avenue, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 19 Aug 2026 at 09:52.

Western Power Distribution (East Midlands) logo
Between
26 and 30 Oct 2026
Details
View Map
Share
Follow
Wainfleet Road

Western Power Distribution (East Midlands) are proposing to carry out New service connection on Wainfleet Road, Burgh Le Marsh.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 October 2026 and could run through until 30 October 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Aug 2026 at 11:20.

Anglian Water logo
Between
28 and 30 Oct 2026
Details
View Map
Share
Follow
Station Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Station Road, Thorpe St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2026 and could run through until 30 October 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 13 Jul 2026 at 16:00.

Lincolnshire County Council logo
Between
29 Oct and 12 Nov 2026
Details
View Map
Share
Follow
Burgh Old Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Burgh Old Road, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 October 2026 and could run through until 12 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 20 Aug 2026 at 10:20.

Quickline Commucations logo
Between
2 and 4 Nov 2026
Details
View Map
Share
Follow
Low Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Low Road, Croft.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 4 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 30 Jul 2026 at 09:51.

Western Power Distribution (East Midlands) logo
Between
2 and 20 Nov 2026
Details
View Map
Share
Follow
Lancaster Avenue

Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Lancaster Avenue, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2026 and could run through until 20 November 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Western Power Distribution (East Midlands) on 16 Sep 2026 at 11:53.

Lincolnshire County Council logo
Between
18 and 20 Nov 2026
Details
View Map
Share
Follow
Lumley Road

Lincolnshire County Council are proposing to carry out Highway improvement works on Lumley Road, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2026 and could run through until 20 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 19 Aug 2026 at 12:11.

Quickline Commucations logo
Between
23 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Eaudyke

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Eaudyke, Friskney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 14 Aug 2026 at 07:57.

Quickline Commucations logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Church Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Church Lane, Friskney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 10 Aug 2026 at 09:28.

Quickline Commucations logo
Between
23 Nov and 4 Dec 2026
Details
View Map
Share
Follow
Eaudyke Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Eaudyke Road, Friskney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 4 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 14 Aug 2026 at 07:47.

Quickline Commucations logo
Between
23 and 27 Nov 2026
Details
View Map
Share
Follow
Howgarth Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Howgarth Lane, Friskney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 November 2026 and could run through until 27 November 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Aug 2026 at 07:32.

Lincolnshire County Council logo
Between
30 Nov and 4 Dec 2026
Details
View Map
Share
Follow
St Margarets Avenue

Lincolnshire County Council are proposing to carry out Highway improvement works on St Margarets Avenue, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 November 2026 and could run through until 4 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Lincolnshire County Council on 15 Sep 2026 at 08:42.

Anglian Water logo
Between
1 and 3 Dec 2026
Details
View Map
Share
Follow
Steeping Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Steeping Road, Thorpe St Peter.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2026 and could run through until 3 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 7 Sep 2026 at 11:24.

Quickline Commucations logo
Between
7 and 17 Dec 2026
Details
View Map
Share
Follow
Matt Pits Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Matt Pits Lane, Wainfleet All Saints.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 17 December 2026. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2026 at 10:27.

Quickline Commucations logo
Between
7 and 17 Dec 2026
Details
View Map
Share
Follow
Brewster Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Brewster Lane, Wainfleet All Saints.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 December 2026 and could run through until 17 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 11 Sep 2026 at 10:27.

Quickline Commucations logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Warth Lane

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Warth Lane, Skegness.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the carriageway and verge.

This roadwork event was last updated by Quickline Commucations on 18 Aug 2026 at 08:32.

Quickline Commucations logo
Between
14 and 18 Dec 2026
Details
View Map
Share
Follow
Low Road

Quickline Commucations are proposing to carry out Utility repair and maintenance works on Low Road, Wainfleet St Mary.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 December 2026 and could run through until 18 December 2026. The works will impact the verge only.

This roadwork event was last updated by Quickline Commucations on 10 Sep 2026 at 10:35.


Roadworks Map near to St. John Street, SKEGNESS, PE24 4DH

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 17 Sep 2026 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to St. John Street, SKEGNESS, PE24 4DH (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Quickline Commucations logo
STATION ROAD 
(0.2 miles)
Quickline Commucations
Utility repair and maintenance works - Footway, Verge - Two-way signals
Complete
15 Sep 2026 19:30 - 16 Sep 2026 00:05
0.2
Details
Share
2
Anglian Water logo
CROFT BANK 
(0.3 miles)
Anglian Water
Utility repair and maintenance works - Carriageway - Two-way signals