ROADWORKS SUMMARY
Lime Grove, SPALDING, PE12 7NG
Introduction
View current and future planned roadworks and road closures for Lime Grove, PE12 7NG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Lime Grove, SPALDING, PE12 7NG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lime Grove are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
22 May 2024
Cadent Gas are carrying out Utility asset works on Spalding Road, Holbeach.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 07:45 and could run through until 22 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Mar 2024 at 07:57.
8 May 2024
Cadent Gas are carrying out Utility asset works on Fleet Road, Holbeach.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 March 2024 at 08:00 and could run through until 8 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 12 Mar 2024 at 09:34.
Today
Electricity Network Company are carrying out New service connection on Old Main Road, Fleet Hargate.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 08:00 and could run through until 28 April 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Electricity Network Company on 24 Apr 2024 at 06:38.
19 May 2024
Cadent Gas are carrying out Utility asset works on West Cob Gate, Moulton.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 15 April 2024 at 07:00 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 06:20.
Friday
Cadent Gas are proposing to carry out Utility asset works on Batemans Close, Gedney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 15 April 2024 and could run through until 3 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 3 Apr 2024 at 15:12.
18 Apr and 10 May 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Hatt Close, Moulton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 10 Apr 2024 at 07:34.
18 Apr and 10 May 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Burnstone Gardens, Moulton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 April 2024 and could run through until 10 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 10 Apr 2024 at 07:21.
21 Apr and 19 May 2024
Cadent Gas are proposing to carry out Utility asset works on Westmoreland Road, Moulton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 19 Apr 2024 at 06:22.
21 Apr and 4 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Fleet Road, Holbeach.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2024 and could run through until 4 August 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 11 Apr 2024 at 06:31.
22 Apr and 14 May 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Creewood Close, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 22 April 2024 and could run through until 14 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 10 Apr 2024 at 07:34.
17 May 2024
Lincolnshire County Council are carrying out Highway improvement works on Willders Garth, Holbeach.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 April 2024 at 15:03 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 26 Apr 2024 at 15:12.
17 May 2024
Lincolnshire County Council are carrying out Highway improvement works on North Parade, Holbeach.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 26 April 2024 at 08:21 and could run through until 17 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 26 Apr 2024 at 08:27.
23 Apr and 15 May 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Windsor Avenue, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 April 2024 and could run through until 15 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 10 Apr 2024 at 07:21.
24 Apr and 5 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Broad Lane, Moulton.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2024 and could run through until 5 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 10:57.
24 Apr and 16 May 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on King George V Avenue, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 April 2024 and could run through until 16 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 10 Apr 2024 at 07:34.
Wednesday
Anglian Water are carrying out Utility repair and maintenance works on High Road, Whaplode.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 26 April 2024 at 10:05 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 26 Apr 2024 at 11:43.
28 Apr and 19 May 2024
Cadent Gas are proposing to carry out Utility asset works on Northons Lane, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 28 April 2024 and could run through until 19 May 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 13:54.
Wednesday
Lincolnshire County Council are proposing to carry out Highway improvement works on Jarvis Gate, Sutton St James.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 25 Apr 2024 at 06:28.
6 May and 3 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Hall Gate, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 06:42.
6 May and 3 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Wignals Gate, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 May 2024 and could run through until 3 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 06:42.
16 and 21 May 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Villa Close, Lutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 13 Mar 2024 at 06:49.
19 May and 9 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Boston Road North, Holbeach.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 19 May 2024 and could run through until 9 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 26 Apr 2024 at 06:40.
27 May and 10 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Hawthorn Chase, Moulton.
These works are categorised as Major.
The works will start on or after 27 May 2024 and could run through until 10 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Jan 2024 at 07:17.
2 and 21 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Batemans Close, Gedney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 17 Apr 2024 at 11:00.
2 and 4 Jun 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Boston Road South, Lincolnshire County Council, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Apr 2024 at 14:02.
3 and 10 Jun 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Fleet Road Industrial Estate, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 10 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 11 Mar 2024 at 14:58.
3 and 21 Jun 2024
Cadent Gas are proposing to carry out Utility asset works on Churchgate, Gedney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 3 June 2024 and could run through until 21 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 18 Apr 2024 at 07:34.
4 and 6 Jun 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Cross Street, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 June 2024 and could run through until 6 June 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Anglian Water on 1 Mar 2024 at 13:31.
5 and 18 Jun 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Holbeach Footpath 9/1, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 5 June 2024 and could run through until 18 June 2024. The works will impact the footpath only.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 24 Apr 2024 at 14:31.
12 and 28 Jun 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Wignals Gate, Holbeach.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Apr 2024 at 14:07.
12 and 28 Jun 2024
Western Power Distribution (East Midlands) are proposing to carry out Utility asset works on Hall Gate, Holbeach.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 12 June 2024 and could run through until 28 June 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Western Power Distribution (East Midlands) on 17 Apr 2024 at 14:06.
16 and 21 Jun 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Branches Lane, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 21 June 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 24 Apr 2024 at 14:39.
16 Jun and 28 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Cecil Pywell Avenue, Holbeach.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 16 June 2024 and could run through until 28 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 14:00.
24 Jun and 1 Jul 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Blazegate, Gedney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 1 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 10 Apr 2024 at 07:46.
24 Jun and 14 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Kennedy Road, Holbeach.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 24 June 2024 and could run through until 14 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2024 at 07:29.
30 Jun and 5 Jul 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Stotons Gate, Holbeach St Johns.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 5 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 26 Apr 2024 at 10:43.
30 Jun and 17 Jul 2024
Cadent Gas are proposing to carry out Utility asset works on Welbourne Lane North, Holbeach.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 June 2024 and could run through until 17 July 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 16 Apr 2024 at 07:29.
1 and 3 Jul 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Station Road, Moulton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 1 July 2024 and could run through until 3 July 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Anglian Water on 4 Apr 2024 at 14:48.
4 and 18 Jul 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Ravens Bank, Holbeach St Johns.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 July 2024 and could run through until 18 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 19 Apr 2024 at 12:53.
7 and 9 Jul 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Stonegate, Gedney.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 9 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 9 Apr 2024 at 08:31.
7 and 12 Jul 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Lowgate, Lutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 July 2024 and could run through until 12 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 26 Apr 2024 at 12:16.
14 Jul and 4 Aug 2024
Cadent Gas are proposing to carry out Utility asset works on Footpath From Foxes Low Road To Willders Garth, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 July 2024 and could run through until 4 August 2024. The works will impact the footway only.
This roadwork event was last updated by Cadent Gas on 24 Apr 2024 at 11:11.
15 and 17 Jul 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on Ravens Gate, Fleet.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 17 July 2024. The works will impact the verge only.
This roadwork event was last updated by Anglian Water on 5 Apr 2024 at 08:50.
15 and 24 Jul 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Cackle Hill Lane, Holbeach.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 24 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 6 Mar 2024 at 15:01.
15 and 17 Jul 2024
Anglian Water are proposing to carry out Utility repair and maintenance works on St Marks Road, Holbeach St Marks.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 July 2024 and could run through until 17 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Anglian Water on 8 Apr 2024 at 14:28.
17 and 29 Jul 2024
Lincolnshire County Council are proposing to carry out Highway improvement works on Dockings Holt, Long Sutton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 17 July 2024 and could run through until 29 July 2024. The works will impact the carriageway only.
This roadwork event was last updated by Lincolnshire County Council on 6 Mar 2024 at 14:59.
21 Jul and 1 Sep 2024
Cadent Gas are proposing to carry out Utility asset works on Boston Road South, Holbeach.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 July 2024 and could run through until 1 September 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Cadent Gas on 15 Apr 2024 at 14:00.
Roadworks Map near to Lime Grove, SPALDING, PE12 7NG
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Lime Grove, SPALDING, PE12 7NG (12 Events)
(Scheduled Dates)
(miles)
(Scheduled: 11 Mar 2024 - 22 May 2024)
(Scheduled: 23 Apr 2024 - 17 May 2024)
(Scheduled: 22 Apr 2024 - 17 May 2024)
(Scheduled: 11 Mar 2024 - 8 May 2024)
Contains public sector information licensed under the Open Government Licence v3.0.