ROADWORKS SUMMARY
London Lane, CHIPPING NORTON, OX7 6AN

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for London Lane, OX7 6AN and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to London Lane, CHIPPING NORTON, OX7 6AN

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for London Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Road Through Brook End

Thames Water are proposing to carry out Utility asset works on Road Through Brook End, Brook End, Chadlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:58.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Road Through Green End

Thames Water are proposing to carry out Utility asset works on Road Through Green End, Green End, Chadlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:01.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Browns Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Browns Lane, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 14:26.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Browns Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Browns Lane, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:57.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Road Through Green End

Thames Water are proposing to carry out Utility asset works on Road Through Green End, Green End, Chadlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:59.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Daisy Bank

Thames Water are proposing to carry out Utility asset works on Daisy Bank, Green End, Chadlington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:02.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Daisy Bank

Thames Water are proposing to carry out Utility asset works on Daisy Bank, Green End, Chadlington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 12 Dec 2024 at 09:59.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Road Through Brook End

Thames Water are proposing to carry out Utility asset works on Road Through Brook End, Brook End, Chadlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:06.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Lower End

Thames Water were proposing to carry out New service connection on Lower End, Leafield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 07:27.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dry Lane

Thames Water are proposing to carry out New service connection on Dry Lane, Crawley, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 15:36.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dry Lane

Thames Water are proposing to carry out New service connection on Dry Lane, Crawley, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:21.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dry Lane

Thames Water are proposing to carry out New service connection on Dry Lane, Crawley, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 12:04.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Charlbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Charlbury Road, Fawler.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 08:13.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Charlbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Charlbury Road, Fawler.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 11:28.

Scottish Hydro Electric Power Dis logo
Between
7 and 14 Jan 2025
Details
View Map
Share
Follow
Church Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Church Road, Milton-under-wychwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Oct 2024 at 14:44.

Scottish Hydro Electric Power Dis logo
Between
7 and 14 Jan 2025
Details
View Map
Share
Follow
Church Road

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Church Road, Milton-under-wychwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 14 January 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 10 Oct 2024 at 13:49.

Thames Water logo
Between
7 and 13 Jan 2025
Details
View Map
Share
Dry Lane

Thames Water were proposing to carry out New service connection on Dry Lane, Crawley, Witney.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:57.

Southern Gas Networks logo
LONG TERM
Between
9 Jan and 27 Mar 2025
Details
View Map
Share
Follow
Dancers Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dancers Hill, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 11:33.

Oxfordshire County Council logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Chipping Norton Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Chipping Norton Road, Chadlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 4 Dec 2024 at 10:57.

Oxfordshire County Council logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Chipping Norton Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Chipping Norton Road, Chadlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 5 Nov 2024 at 14:46.

Oxfordshire County Council logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Chipping Norton Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Chipping Norton Road, Chadlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 3 Dec 2024 at 15:01.

Gloucestershire County Council logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Icomb Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Icomb Road, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Nov 2024 at 07:08.

Gloucestershire County Council logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
The Green

Gloucestershire County Council are proposing to carry out Highway improvement works on The Green, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Nov 2024 at 07:07.

Gloucestershire County Council logo
Between
15 and 21 Jan 2025
Details
View Map
Share
Follow
Church Street

Gloucestershire County Council are proposing to carry out Highway improvement works on Church Street, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 28 Nov 2024 at 07:08.

Gloucestershire County Council logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Church Street

Gloucestershire County Council are proposing to carry out Highway improvement works on Church Street, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:13.

Gloucestershire County Council logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
Icomb Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Icomb Road, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:19.

Gloucestershire County Council logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Icomb Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Icomb Road, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:07.

Gloucestershire County Council logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Icomb Road

Gloucestershire County Council are proposing to carry out Highway improvement works on Icomb Road, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Oct 2024 at 11:54.

Gloucestershire County Council logo
Between
16 and 22 Jan 2025
Details
View Map
Share
Follow
The Green

Gloucestershire County Council are proposing to carry out Highway improvement works on The Green, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 27 Nov 2024 at 11:13.

Gloucestershire County Council logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
The Green

Gloucestershire County Council are proposing to carry out Highway improvement works on The Green, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:01.

Gloucestershire County Council logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
The Green

Gloucestershire County Council are proposing to carry out Highway improvement works on The Green, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Oct 2024 at 11:54.

Gloucestershire County Council logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Church Street

Gloucestershire County Council are proposing to carry out Highway improvement works on Church Street, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 7 Nov 2024 at 13:01.

Gloucestershire County Council logo
Between
16 and 21 Jan 2025
Details
View Map
Share
Follow
Church Street

Gloucestershire County Council are proposing to carry out Highway improvement works on Church Street, Bledington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 January 2025 and could run through until 21 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gloucestershire County Council on 11 Oct 2024 at 11:54.

Thames Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Follow
Fiddlers Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Fiddlers Hill, Shipton-under-wychwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 January 2025 and could run through until 24 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 28 Oct 2024 at 08:58.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Church Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Church Lane, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:23.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Church Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Church Lane, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 11:56.

Thames Water logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Milton-under-wychwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 08:39.

Thames Water logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Church Road

Thames Water are proposing to carry out New service connection on Church Road, Milton-under-wychwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:12.

Thames Water logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Road From A424 To Idbury

Thames Water are proposing to carry out New service connection on Road From A424 To Idbury, Idbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 08:38.

Thames Water logo
Between
29 Jan and 1 Feb 2025
Details
View Map
Share
Follow
Road From A424 To Idbury

Thames Water are proposing to carry out New service connection on Road From A424 To Idbury, Idbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 January 2025 and could run through until 1 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 21 Nov 2024 at 11:16.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Lane Through Shorthampton

Thames Water are proposing to carry out Utility repair and maintenance works on Lane Through Shorthampton, Shorthampton, Chipping Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 08:13.

Thames Water logo
Between
5 and 7 Mar 2025
Details
View Map
Share
Follow
The Sands

Thames Water are proposing to carry out Utility repair and maintenance works on The Sands, Milton Under Wychwood.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 March 2025 and could run through until 7 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Dec 2024 at 12:33.

Scottish Hydro Electric Power Dis logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Street Through Swinbrook

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Street Through Swinbrook, Swinbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Dec 2024 at 10:07.

Scottish Hydro Electric Power Dis logo
Between
10 and 13 Mar 2025
Details
View Map
Share
Follow
Street Through Swinbrook

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Street Through Swinbrook, Swinbrook.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 13 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Nov 2024 at 08:14.


Roadworks Map near to London Lane, CHIPPING NORTON, OX7 6AN

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 04:56
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to London Lane, CHIPPING NORTON, OX7 6AN (1 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Oxfordshire County Council logo
LONDON LANE 
(0.1 miles)
Oxfordshire County Council
Highway repair and maintenance works - Verge - Two-way signals
In Progress
Since: 16 Dec 2024 07:30
(Scheduled: 16 Dec 2024 - 18 Dec 2024)
0.1
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.