ROADWORKS SUMMARY
Fox Close, CHIPPING NORTON, OX7 5BZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fox Close, OX7 5BZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fox Close, CHIPPING NORTON, OX7 5BZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fox Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Barrats Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Barrats Hill, Whichford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 26 Sep 2024 at 10:06.

Severn Trent Water logo
Between
16 and 18 Dec 2024
Details
View Map
Share
Follow
Barrats Hill

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Barrats Hill, Whichford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 16 December 2024 and could run through until 18 December 2024. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 16 Sep 2024 at 15:58.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Road Through Green End

Thames Water are proposing to carry out Utility asset works on Road Through Green End, Green End, Chadlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:56.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Daisy Bank

Thames Water are proposing to carry out Utility asset works on Daisy Bank, Green End, Chadlington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:52.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Road Through Brook End

Thames Water are proposing to carry out Utility asset works on Road Through Brook End, Brook End, Chadlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:47.

Oxfordshire County Council logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Chipping Norton Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Chipping Norton Road, Chadlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 5 Nov 2024 at 14:46.

Oxfordshire County Council logo
Between
13 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Chipping Norton Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Chipping Norton Road, Chadlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 5 Nov 2024 at 14:49.

Thames Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
East End

Thames Water are proposing to carry out Utility repair and maintenance works on East End, Hook Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 07:39.

Thames Water logo
Between
20 and 22 Jan 2025
Details
View Map
Share
Follow
East End

Thames Water are proposing to carry out Utility repair and maintenance works on East End, Hook Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Nov 2024 at 11:06.

Western Power Distribution (West Midlands) logo
Between
27 and 31 Jan 2025
Details
View Map
Share
Follow
Hook Norton Road

Western Power Distribution (West Midlands) are proposing to carry out New service connection on Hook Norton Road, Whichford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 5 Nov 2024 at 13:46.

Thames Water logo
Between
28 and 31 Jan 2025
Details
View Map
Share
Main Street

Thames Water were proposing to carry out New service connection on Main Street, Over Norton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 January 2025 and run through until 31 January 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 14:20.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
West Street

Thames Water are proposing to carry out New service connection on West Street, Chipping Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 20 Nov 2024 at 13:47.

Thames Water logo
Between
28 and 30 Jan 2025
Details
View Map
Share
Follow
West Street

Thames Water are proposing to carry out New service connection on West Street, Chipping Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 January 2025 and could run through until 30 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 14:09.

Oxfordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Road From The A44 To The Rollright Stones

Oxfordshire County Council were proposing to carry out Core Sampling on Road From The A44 To The Rollright Stones, Salford, Chipping Norton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 February 2025 and run through until 7 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 1 Nov 2024 at 10:44.

Oxfordshire County Council logo
Between
3 and 7 Feb 2025
Details
View Map
Share
Follow
Road From The A44 To The Rollright Stones

Oxfordshire County Council are proposing to carry out Core Sampling on Road From The A44 To The Rollright Stones, Salford, Chipping Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 5 Nov 2024 at 08:29.

BT logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Whichford Road

BT are proposing to carry out Utility asset works on Whichford Road, Ascott, Whichford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Nov 2024 at 09:21.

BT logo
Between
3 and 21 Feb 2025
Details
View Map
Share
Follow
Ascott Road

BT are proposing to carry out Utility asset works on Ascott Road, Ascott, Whichford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 4 Nov 2024 at 09:24.

Thames Water logo
Between
4 and 7 Feb 2025
Details
View Map
Share
West Street

Thames Water were proposing to carry out New service connection on West Street, Chipping Norton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 4 February 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 12 Nov 2024 at 15:48.

Thames Water logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Road Through Lidstone

Thames Water are proposing to carry out Utility repair and maintenance works on Road Through Lidstone, West Oxfordshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 08:40.

Thames Water logo
Between
13 and 17 Feb 2025
Details
View Map
Share
Follow
Enstone Road

Thames Water are proposing to carry out New service connection on Enstone Road, Little Tew.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 February 2025 and could run through until 17 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 12:23.

Thames Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Follow
Enstone Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Enstone Road, Heythrop, Chipping Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 February 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 15 Nov 2024 at 14:44.

Thames Water logo
Between
19 and 21 Feb 2025
Details
View Map
Share
Follow
Lane Through Shorthampton

Thames Water are proposing to carry out Utility repair and maintenance works on Lane Through Shorthampton, Shorthampton, Chipping Norton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 February 2025 and could run through until 21 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 09:01.


Roadworks Map near to Fox Close, CHIPPING NORTON, OX7 5BZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 16:59
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fox Close, CHIPPING NORTON, OX7 5BZ (3 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Scottish Hydro Electric Power Dis logo
URGENT
  
DISTONS LANE 
(0.3 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Carriageway - Some carriageway incursion
In Progress
Since: 23 Nov 2024 17:52
(Scheduled: 23 Nov 2024 - 29 Nov 2024)
0.3
Details
Share
Follow
2
Thames Water logo
CROSS LEYS 
(0.4 miles)
Thames Water
Utility repair and maintenance works - Footway - Give and take
Planned
Scheduled: 22 Nov 2024 - 26 Nov 2024
0.4
Details
Share
Follow
3
Scottish Hydro Electric Power Dis logo
MAJOR
  
FOOTPATH FROM CROSS LEYS TO LEWIS ROAD 
(0.5 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Footpath - Give and take
Planned
Scheduled: 11 Dec 2023 - 17 Jan 2025
0.5
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.