ROADWORKS SUMMARY
Morris Crescent, OXFORD, OX4 3ED
Introduction
View current and future planned roadworks and road closures for Morris Crescent, OX4 3ED and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Morris Crescent, OXFORD, OX4 3ED
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Morris Crescent are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
31 Mar 2025
Network Rail are carrying out Works for Rail Purposes on Cripley Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 January 2023 at 07:30 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 23 Sep 2024 at 12:04.
28 Nov 2024
Network Rail are carrying out Works for Rail Purposes on Roger Dudman Way, Oxford.
These works are categorised as Major.
The works started on 25 January 2023 at 07:00 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 5 Nov 2024 at 10:51.
28 Nov 2024
Network Rail are carrying out Works for Rail Purposes on Roger Dudman Way, Oxford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 13 March 2023 at 07:00 and could run through until 28 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 5 Nov 2024 at 10:49.
31 Mar 2025
Network Rail are carrying out Works for Rail Purposes on Becket Street, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 April 2023 at 00:01 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Sep 2024 at 16:13.
31 Mar 2025
Network Rail are carrying out Works for Rail Purposes on Botley Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 April 2023 at 00:01 and could run through until 31 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 19 Sep 2024 at 16:12.
31 Mar 2025
Network Rail are carrying out Works for Rail Purposes on Ferry Hinksey Road, Oxford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Sep 2024 at 11:40.
31 Mar 2025
Network Rail are carrying out Works for Rail Purposes on Botley Road, Oxford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 16 May 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 23 Sep 2024 at 11:39.
3 Sep 2023 and 30 Mar 2027
Oxfordshire County Council are proposing to carry out Highway improvement works on Kennington Roundabout, Oxford.
These works are categorised as Major.
The works will start on or after 3 September 2023 and could run through until 30 March 2027. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 25 Oct 2022 at 09:34.
31 Jan 2025
Thames Water are carrying out Utility asset works on Grenoble Road, Sandford-on-thames, Oxford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 19 February 2024 at 08:17 and could run through until 31 January 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 09:41.
31 Mar 2025
Thames Water are carrying out Utility asset works on Botley Road, Oxford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 11 March 2024 at 10:50 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Mar 2024 at 10:57.
6 Dec 2024
Oxfordshire County Council are carrying out Highway improvement works on Garsington Road, Oxford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 17 July 2024 at 09:30 and could run through until 6 December 2024. The works will impact the footway, carriageway and cycleway.
This roadwork event was last updated by Oxfordshire County Council on 17 Jul 2024 at 13:59.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Five Mile Drive, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 6 August 2024 at 12:40 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:50.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Little Clarendon Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 09:57.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on Little Clarendon Street, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:37.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Observatory Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:13.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on Observatory Street, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:37.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on St Bernard's Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:13.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on St Bernard's Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:36.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Bevington Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:14.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on Bevington Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:36.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Plantation Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:14.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on Plantation Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:35.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Leckford Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 09:30.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on Leckford Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:33.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Canterbury Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 09:30.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on Canterbury Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:33.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Farndon Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:56.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on Farndon Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:31.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on St Margaret's Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:41.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on St Margaret's Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:28.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on South Parade, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:32.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on South Parade, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:26.
12 Aug 2024 and 28 Feb 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Field House Drive, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:31.
28 Feb 2025
Oxfordshire County Council are carrying out Highway improvement works on Field House Drive, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:25.
9 Sep 2024 and 30 May 2029
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of Southern Bypass Between Hinksey Hill Roundabout And Kennington Roundabout, South Hinksey, Oxford.
These works are categorised as Major.
The works will start on or after 9 September 2024 and could run through until 30 May 2029. The works will impact the footway, carriageway, verge, cycleway and footpath.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 6 Mar 2024 at 09:44.
28 Jan 2025
Oxfordshire County Council are carrying out Highway repair and maintenance works on The Towing Path, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 07:30 and could run through until 28 January 2025. The works will impact the footway only.
This roadwork event was last updated by Oxfordshire County Council on 9 Sep 2024 at 09:25.
28 Jan 2025
Oxfordshire County Council are carrying out Highway repair and maintenance works on The Towing Path, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 9 September 2024 at 07:30 and could run through until 28 January 2025. The works will impact the footway only.
This roadwork event was last updated by Oxfordshire County Council on 9 Sep 2024 at 09:25.
16 Sep and 29 Nov 2024
Oxfordshire County Council were proposing to carry out Highway improvement works on Garsington Road, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 September 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 21 Aug 2024 at 12:05.
23 Sep and 29 Nov 2024
Oxfordshire County Council are proposing to carry out Highway improvement works on Blue Boar Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 23 September 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 21 May 2024 at 12:37.
6 Dec 2024
Oxfordshire County Council are carrying out roadworks on North Street, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 23 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 25 Sep 2024 at 08:31.
30 Sep and 20 Dec 2024
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wootton Road, Abingdon.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 30 September 2024 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Southern Gas Networks on 23 Jul 2024 at 14:30.
20 Dec 2024
Southern Gas Networks are carrying out Utility repair and maintenance works on Wootton Road, Abingdon.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 30 September 2024 at 08:00 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Southern Gas Networks on 30 Sep 2024 at 08:12.
5 Dec 2024
Oxfordshire County Council are carrying out Highway improvement works on Garsington Road, Oxford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 12:45 and could run through until 5 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 8 Oct 2024 at 08:31.
29 Nov 2024
Oxfordshire County Council are carrying out Highway improvement works on Phipps Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 12:45 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 7 Oct 2024 at 14:34.
29 Nov 2024
Oxfordshire County Council are carrying out Highway improvement works on Napier Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 12:45 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 7 Oct 2024 at 14:34.
29 Nov 2024
Oxfordshire County Council are carrying out Highway improvement works on St Luke's Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 October 2024 at 09:30 and could run through until 29 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 7 Oct 2024 at 10:01.
14 Oct and 2 Dec 2024
Oxfordshire County Council are proposing to carry out Section 50 on South Parks Road, Oxford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 14 October 2024 and could run through until 2 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 14 Oct 2024 at 09:23.
Monday
Oxfordshire County Council are carrying out Highway improvement works on Banbury Road, Oxford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 21 October 2024 at 08:00 and could run through until 18 November 2024. The works will impact the carriageway and cycleway.
This roadwork event was last updated by Oxfordshire County Council on 30 Oct 2024 at 16:19.
6 Dec 2024
Thames Water are carrying out Disconnection or alteration of supply on Underhill Circus, Oxford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 08:15 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 14:49.
Today
Thames Water are carrying out Disconnection or alteration of supply on Burchester Avenue, Oxford.
These works are categorised as Major.
A lane is closed for some or all of the period and could cause delays to journeys.
The works started on 23 October 2024 at 08:15 and could run through until 13 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 08:17.
Friday
Oxfordshire County Council are proposing to carry out Highway improvement works on St Swithuns Road, Kennington, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 26 October 2024 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 24 Jul 2024 at 10:16.
Tomorrow
Southern Gas Networks are carrying out Utility repair and maintenance works on Oxford Road, Abingdon.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 27 October 2024 at 23:03 and could run through until 14 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 7 Nov 2024 at 11:43.
Friday
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Whites Lane, Radley, Abingdon.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 28 October 2024 and could run through until 15 November 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 16 Oct 2024 at 15:34.
20 Dec 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Unnamed-b480-single Carriageway (36209964), South Oxfordshire.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:10 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Nov 2024 at 09:45.
Friday
Oxfordshire County Council are carrying out Highway improvement works on St Swithuns Road, Kennington, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 09:30 and could run through until 15 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 28 Oct 2024 at 09:32.
Monday
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Watlington Road, Cowley, Oxford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 08:10 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 14:42.
23 Nov 2024
Network Rail are carrying out Works for Rail Purposes on Park End Street, Oxford.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 28 October 2024 at 07:00 and could run through until 23 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Network Rail on 12 Nov 2024 at 14:54.
28 Oct and 29 Nov 2024
Thames Water were proposing to carry out Disconnection or alteration of supply on Crotch Crescent, Oxford.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 28 October 2024 and run through until 29 November 2024. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 30 Jul 2024 at 08:10.
Monday
Oxfordshire County Council are carrying out roadworks on Unnamed-a4074-single Carriageway (36209202), South Oxfordshire.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 4 November 2024 at 07:00 and could run through until 18 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 10:10.
4 and 29 Nov 2024
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Watlington Road, Cowley, Oxford.
These works were categorised as Major.
Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 4 November 2024 and run through until 29 November 2024. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Nov 2024 at 12:02.
Today
Oxfordshire County Council are carrying out Highway improvement works on Garsington Road, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 19:30 and could run through until 13 November 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 8 Nov 2024 at 20:46.
20 Nov 2024
Thames Water are carrying out Utility repair and maintenance works on New Cross Road, Oxford.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 7 November 2024 at 10:00 and could run through until 20 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 8 Nov 2024 at 09:20.
20 Dec 2024
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Watlington Road, Garsington, Oxford.
These works are categorised as Major.
Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 8 November 2024 at 10:00 and could run through until 20 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 14:09.
Today
Thames Water are carrying out Utility repair and maintenance works on The Hill, Garsington, Oxford.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 06:08 and could run through until 13 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 07:52.
11 Nov and 3 Dec 2024
Oxfordshire County Council are proposing to carry out Section 50 on Cornmarket Street, Oxford.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 7 Nov 2024 at 14:55.
3 Dec 2024
Oxfordshire County Council are carrying out Section 50 on Cornmarket Street, Oxford.
These works are categorised as Major.
The works started on 12 November 2024 at 09:00 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 12 Nov 2024 at 09:21.
11 Nov and 3 Dec 2024
Oxfordshire County Council are proposing to carry out Section 50 on Market Street, Oxford.
These works are categorised as Major.
The works will start on or after 11 November 2024 and could run through until 3 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 11 Nov 2024 at 14:00.
Today
Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Noke To Islip, Noke.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 November 2024 and could run through until 13 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 9 Aug 2024 at 11:35.
Today
Oxfordshire County Council are carrying out Highway improvement works on Street From Noke To Islip, Noke.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 11 November 2024 at 20:30 and could run through until 13 November 2024. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 11 Nov 2024 at 22:03.
Saturday
Oxfordshire County Council were proposing to carry out Highway improvement works on Oxford Road, Abingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 November 2024 and run through until 16 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 1 Oct 2024 at 15:08.
Saturday
Oxfordshire County Council were proposing to carry out Highway improvement works on Bagley Wood, Kennington, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 14 November 2024 and run through until 16 November 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 1 Oct 2024 at 15:08.
18 and 20 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Heyford Hill Roundabout, Sandford-on-thames, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 27 Aug 2024 at 17:49.
18 and 20 Nov 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Heyford Hill Roundabout, Sandford-on-thames, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 20 November 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 07:51.
18 Nov and 6 Dec 2024
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Watlington Road, Cowley, Oxford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 Nov 2024 at 14:42.
18 Nov and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Crown Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 21 Aug 2024 at 12:45.
18 Nov and 6 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Crown Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 6 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Aug 2024 at 09:38.
18 Nov 2024 and 25 Apr 2025
Thames Water are proposing to carry out Section 58 on Botley Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:08.
18 Nov 2024 and 25 Apr 2025
Thames Water are proposing to carry out Section 58 on Botley Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 18 November 2024 and could run through until 25 April 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:51.
25 and 29 Nov 2024
Oxfordshire County Council are proposing to carry out Highway improvement works on Westminster Way, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 16 Sep 2024 at 11:54.
27 Nov and 10 Dec 2024
Thames Water are proposing to carry out Utility asset works on Jack Straw's Lane, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 November 2024 and could run through until 10 December 2024. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:07.
2 Dec 2024 and 10 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Botley Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 1 Nov 2024 at 10:09.
2 Dec 2024 and 10 Jan 2025
Network Rail are proposing to carry out Works for Rail Purposes on Botley Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Network Rail on 11 Nov 2024 at 10:47.
4 and 6 Dec 2024
Oxfordshire County Council are proposing to carry out Highway improvement works on Cornmarket Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 4 December 2024 and could run through until 6 December 2024. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 4 Sep 2024 at 15:17.
9 and 11 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Swinburne Road, Abingdon.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 9 December 2024 and run through until 11 December 2024. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 12:08.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Bayworth Lane, Boars Hill, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 2 Sep 2024 at 15:58.
9 and 11 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Bayworth Lane, Boars Hill, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 9 December 2024 and could run through until 11 December 2024. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 11 Oct 2024 at 10:07.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Road Running Through Elsfield, Elsfield, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 4 Sep 2024 at 10:29.
10 and 12 Dec 2024
Thames Water are proposing to carry out Utility repair and maintenance works on Road Running Through Elsfield, Elsfield, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 December 2024 and could run through until 12 December 2024. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 14:04.
16 and 18 Dec 2024
Thames Water were proposing to carry out Utility repair and maintenance works on Merton Street, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 16 December 2024 and run through until 18 December 2024. The works were due to impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 09:35.
6 Jan and 16 May 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Lower Road, Garsington, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 May 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 Aug 2024 at 10:34.
6 and 8 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Ock Street, Abingdon.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 11 Sep 2024 at 10:23.
6 Jan and 16 Mar 2025
Thames Water are proposing to carry out Utility asset works on Hurst Rise Road, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 11 Nov 2024 at 15:38.
6 Jan and 11 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Cowley Road, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 11 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 6 Nov 2024 at 10:56.
6 Jan and 4 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on St Michael's Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 19 Jun 2024 at 08:56.
6 Jan and 4 Apr 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on St Michael's Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 20 Aug 2024 at 08:17.
6 and 9 Jan 2025
Thames Water are proposing to carry out Disconnection or alteration of supply on Pusey Lane, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 08:18.
6 and 17 Jan 2025
Thames Water are proposing to carry out Utility asset works on Stowford Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 23 Sep 2024 at 08:26.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Old Boars Hill, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 30 Sep 2024 at 15:49.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Merton Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 12 Sep 2024 at 10:00.
7 and 9 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Merton Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 16 Sep 2024 at 13:59.
8 and 13 Jan 2025
Thames Water were proposing to carry out Utility repair and maintenance works on Woodstock Road, Oxford.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 8 January 2025 and run through until 13 January 2025. The works were due to impact the verge only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:44.
13 Jan and 4 Apr 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Road Running Through Nuneham Courtenay, Nuneham Courtenay, Oxford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 16 Oct 2024 at 10:04.
13 and 15 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on York Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 17 Sep 2024 at 12:53.
13 and 15 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on York Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 15 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 27 Sep 2024 at 15:30.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Gardiner Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 10 Oct 2024 at 11:24.
13 and 17 Jan 2025
Thames Water are proposing to carry out New service connection on Gardiner Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 18 Oct 2024 at 08:09.
15 and 17 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Church Way, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 15 January 2025 and could run through until 17 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:51.
20 and 22 Jan 2025
Thames Water are proposing to carry out New service connection on Sawpit Road, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 20 January 2025 and could run through until 22 January 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 5 Nov 2024 at 11:05.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Charles Street, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 31 Oct 2024 at 11:42.
21 and 23 Jan 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Saxon Way, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 21 January 2025 and could run through until 23 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 23 Oct 2024 at 09:30.
27 Jan and 18 Apr 2025
Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Road Running Through Nuneham Courtenay, Nuneham Courtenay, Oxford.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 18 April 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Oxfordshire County Council on 22 Oct 2024 at 14:13.
27 Jan and 14 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on St Thomas Street, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jul 2024 at 10:00.
27 Jan and 14 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Hollybush Row, Oxford.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jul 2024 at 10:00.
27 and 31 Jan 2025
Thames Water are proposing to carry out New service connection on Old Road, Shotover Hill, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 31 January 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 28 Oct 2024 at 11:28.
30 Jan and 2 Feb 2025
Thames Water are proposing to carry out New service connection on Hollow Way, Oxford.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 30 January 2025 and could run through until 2 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Thames Water on 6 Nov 2024 at 16:37.
Roadworks Map near to Morris Crescent, OXFORD, OX4 3ED
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Morris Crescent, OXFORD, OX4 3ED (18 Events)
(Scheduled Dates)
(miles)
(Scheduled: 12 Nov 2024 - 18 Nov 2024)
(Scheduled: 11 Nov 2024 - 13 Nov 2024)
(Scheduled: 7 Nov 2024 - 13 Nov 2024)
(Scheduled: 7 Oct 2024 - 29 Nov 2024)
(Scheduled: 7 Oct 2024 - 29 Nov 2024)
(Scheduled: 7 Oct 2024 - 29 Nov 2024)
Contains public sector information licensed under the Open Government Licence v3.0.