ROADWORKS SUMMARY
Green Lane, WITNEY, OX29 6TW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Green Lane, OX29 6TW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Green Lane, WITNEY, OX29 6TW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Green Lane are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Until
24 Jan 2025
Details
View Map
Share
Follow
Road Through Barnard Gate

Oxfordshire County Council are carrying out Highway repair and maintenance works on Road Through Barnard Gate, Barnard Gate, Witney.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:15 and could run through until 24 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 13 Dec 2024 at 14:04.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:21.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:09.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From Oxford Hill To A40

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From Oxford Hill To A40, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 11:47.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:28.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Unnamed A40 Section Running From 435136208675 To 435548208645

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed A40 Section Running From 435136208675 To 435548208645, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 12:11.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Boot Street

Thames Water are carrying out New service connection on Boot Street, Stonesfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 17 December 2024 at 15:00 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 15:41.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Boot Street

Thames Water are proposing to carry out New service connection on Boot Street, Stonesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 December 2024 and could run through until 19 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Sep 2024 at 11:21.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Lower End

Thames Water were proposing to carry out New service connection on Lower End, Leafield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 8 January 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 07:27.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Woodgreen

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Woodgreen, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Woodgreen

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Woodgreen, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:31.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Newland, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:29.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Newland

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Dec 2024 at 14:45.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:53.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dry Lane

Thames Water are proposing to carry out New service connection on Dry Lane, Crawley, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 1 Nov 2024 at 12:04.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Follow
Newland Mill

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland Mill, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Dec 2024 at 10:03.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dry Lane

Thames Water are proposing to carry out New service connection on Dry Lane, Crawley, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 22 Nov 2024 at 08:21.

Thames Water logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Dry Lane

Thames Water are proposing to carry out New service connection on Dry Lane, Crawley, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Nov 2024 at 15:36.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland Mill

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland Mill, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:52.

Neoscorp logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Cycle Track Adjacent Community Centre On Witan Way

Neoscorp are proposing to carry out Utility asset works on Cycle Track Adjacent Community Centre On Witan Way, Witney.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the cycleway and footpath.

This roadwork event was last updated by Neoscorp on 11 Oct 2024 at 12:47.

Neoscorp logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Cycle Track Adjacent Community Centre On Witan Way

Neoscorp are proposing to carry out Utility asset works on Cycle Track Adjacent Community Centre On Witan Way, Witney.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the cycleway and footpath.

This roadwork event was last updated by Neoscorp on 4 Oct 2024 at 13:46.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Browns Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Browns Lane, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 12 Sep 2024 at 14:57.

Thames Water logo
Between
6 and 8 Jan 2025
Details
View Map
Share
Follow
Browns Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Browns Lane, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 8 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Oct 2024 at 14:26.

Thames Water logo
Between
7 and 13 Jan 2025
Details
View Map
Share
Dry Lane

Thames Water were proposing to carry out New service connection on Dry Lane, Crawley, Witney.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 January 2025 and run through until 13 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Oct 2024 at 10:57.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Charlbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Charlbury Road, Fawler.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 15 Oct 2024 at 08:13.

Thames Water logo
Between
7 and 9 Jan 2025
Details
View Map
Share
Follow
Charlbury Road

Thames Water are proposing to carry out Utility repair and maintenance works on Charlbury Road, Fawler.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 9 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 11:28.

Southern Gas Networks logo
LONG TERM
Between
9 Jan and 27 Mar 2025
Details
View Map
Share
Follow
Dancers Hill

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Dancers Hill, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2025 and could run through until 27 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 24 Sep 2024 at 11:33.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Church Green

Southern Gas Networks are proposing to carry out New service connection on Church Green, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 08:48.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Church Green

Southern Gas Networks are proposing to carry out New service connection on Church Green, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:14.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Newland

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Newland, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:30.

Scottish Hydro Electric Power Dis logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Park Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Park Road, Combe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:57.

Scottish Hydro Electric Power Dis logo
Between
13 and 30 Jan 2025
Details
View Map
Share
The Green

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on The Green, Coombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:53.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Bladon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:18.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Witney Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Witney Lane, Stonesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 29 Oct 2024 at 12:50.

Oxfordshire County Council logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Section Of A44 From Slape Bridge To Manor Road

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Section Of A44 From Slape Bridge To Manor Road, Woodleys, Woodstock.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 16 Dec 2024 at 16:37.

Oxfordshire County Council logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Section Of A44 From Slape Bridge To Manor Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Section Of A44 From Slape Bridge To Manor Road, Woodleys, Woodstock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 16 Dec 2024 at 16:22.

Oxfordshire County Council logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Section Of A44 From Slape Bridge To Manor Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Section Of A44 From Slape Bridge To Manor Road, Woodleys, Woodstock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 16 Dec 2024 at 16:54.

Oxfordshire County Council logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Section Of A44 From Slape Bridge To Manor Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Section Of A44 From Slape Bridge To Manor Road, Woodleys, Woodstock.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 16 Dec 2024 at 16:51.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Church Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Church Lane, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Dec 2024 at 11:56.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Church Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Church Lane, Charlbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 10 Oct 2024 at 08:23.

Thames Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Follow
Witney Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Witney Lane, Stonesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 29 January 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 3 Dec 2024 at 14:40.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Woodgreen

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Woodgreen, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2024 at 15:59.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
The Green

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Green, Coombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:58.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
The Green

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Green, Coombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:31.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Park Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Park Road, Combe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Nov 2024 at 15:58.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Park Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Park Road, Combe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:32.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Newland Mill

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland Mill, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jul 2024 at 12:00.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Newland Mill

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland Mill, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 12:18.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Newland Mill

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland Mill, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Dec 2024 at 10:02.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Newland

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2024 at 15:59.

Oxfordshire County Council logo
LONG TERM
Between
2 Feb 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Dec 2024 at 11:28.

Oxfordshire County Council logo
LONG TERM
Between
2 Feb 2025 and 31 Mar 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Dec 2024 at 11:21.

Oxfordshire County Council logo
LONG TERM
Between
2 Feb 2025 and 31 Mar 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Dec 2024 at 11:22.

Oxfordshire County Council logo
LONG TERM
Between
2 Feb 2025 and 31 Mar 2026
Details
View Map
Share
Follow
Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Oxford Hill, Witney.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 February 2025 and could run through until 31 March 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Dec 2024 at 11:34.

Thames Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Peaks Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Peaks Lane, Stonesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Nov 2024 at 08:46.

Thames Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Follow
Union Street

Thames Water are proposing to carry out Utility repair and maintenance works on Union Street, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 February 2025 and could run through until 27 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 17 Dec 2024 at 10:23.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
The Green

Oxfordshire County Council are proposing to carry out Highway improvement works on The Green, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:39.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Eynsham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Eynsham Road, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:40.


Roadworks Map near to Green Lane, WITNEY, OX29 6TW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 06:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Green Lane, WITNEY, OX29 6TW (2 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
NEW YATT ROAD 
(0.1 miles)
Last Mile Electricity (formerly Global Utility Connections)
Utility repair and maintenance works - Footway, Carriageway - Two-way signals
In Progress
Since: 16 Dec 2024 10:00
(Scheduled: 16 Dec 2024 - 20 Dec 2024)
0.1
Details
Share
Follow
2
Virgin Media logo
WINDMILL ROAD 
(0.5 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Complete
17 Dec 2024 14:56 - 15:23
0.5
Details
Share

Contains public sector information licensed under the Open Government Licence v3.0.