ROADWORKS SUMMARY
Standlake Road, WITNEY, OX29 5AZ

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Standlake Road, OX29 5AZ and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Standlake Road, WITNEY, OX29 5AZ

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Standlake Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Until
4 Apr 2025
Details
View Map
Share
Follow
Unnamed--single Carriageway (41608977)

Oxfordshire County Council are carrying out Highway improvement works on Unnamed--single Carriageway (41608977), Wantage.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 29 July 2024 at 08:20 and could run through until 4 April 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 13 Feb 2025 at 12:07.

Oxfordshire County Council logo
LONG TERM
Until
1 Apr 2025
Details
View Map
Share
Follow
Wantage Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Wantage Road, Frilford, Abingdon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 20:00 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 13 Feb 2025 at 12:07.

Oxfordshire County Council logo
LONG TERM
Until
1 Apr 2025
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Oxford Road, East Hanney, Wantage.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 August 2024 at 20:00 and could run through until 1 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 13 Feb 2025 at 12:06.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:28.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:21.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:09.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From Oxford Hill To A40

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From Oxford Hill To A40, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 11:47.

Oxfordshire County Council logo
LONG TERM
Until
17 Mar 2025
Details
View Map
Share
Follow
Marcham Road

Oxfordshire County Council are carrying out Highway improvement works on Marcham Road, Abingdon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 January 2025 at 07:00 and could run through until 17 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Jan 2025 at 14:10.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 17 Mar 2025
Details
View Map
Share
Follow
Marcham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Marcham Road, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 17 March 2025. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 18 Sep 2024 at 12:25.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Hurst Rise Road

Thames Water are proposing to carry out Utility asset works on Hurst Rise Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:11.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan and 8 Apr 2025
Details
View Map
Share
Springhill

Oxfordshire County Council were proposing to carry out Highway improvement works on Springhill, Longworth, Abingdon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 8 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Jan 2025 at 13:45.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Eynsham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eynsham Road, Farmoor, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:33.

Oxfordshire County Council logo
LONG TERM
Until
8 Apr 2025
Details
View Map
Share
Follow
Springhill

Oxfordshire County Council are carrying out Highway repair and maintenance works on Springhill, Longworth, Abingdon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 February 2025 at 08:00 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Feb 2025 at 10:00.

Oxfordshire County Council logo
LONG TERM
Between
4 Feb and 8 Apr 2025
Details
View Map
Share
Follow
Springhill

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Springhill, Longworth, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 8 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Jan 2025 at 14:53.

Oxfordshire County Council logo
LONG TERM
Until
17 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are carrying out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:30 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 12:12.

Oxfordshire County Council logo
LONG TERM
Until
17 Sep 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are carrying out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:30 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 12:12.

Oxfordshire County Council logo
LONG TERM
Until
17 Sep 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are carrying out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:30 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 12:12.

Oxfordshire County Council logo
LONG TERM
Until
17 Sep 2026
Details
View Map
Share
Follow
Oxford Hill

Oxfordshire County Council are carrying out Highway improvement works on Oxford Hill, Witney.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:30 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 12:13.

Scottish Hydro Electric Power Dis logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
West Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on West Way, Oxford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 15:13.

National Highways logo
Between
14 and 18 Mar 2025
Details
View Map
Share
Northbound A420 Between Cumnor And North Hinksey

National Highways were proposing to carry out Utility repair and maintenance works on Northbound A420 Between Cumnor And North Hinksey, Cumnor, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 March 2025 and run through until 18 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by National Highways on 27 Feb 2025 at 13:34.

Thames Water logo
LONG TERM
Between
24 Mar and 29 May 2025
Details
View Map
Share
Follow
Bampton Road

Thames Water are proposing to carry out Utility asset works on Bampton Road, Aston, Bampton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 15:03.

Thames Water logo
LONG TERM
Between
24 Mar and 29 May 2025
Details
View Map
Share
Bampton Road

Thames Water were proposing to carry out Utility asset works on Bampton Road, Aston, Bampton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 29 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 15:02.

Thames Water logo
LONG TERM
Between
24 Mar and 29 May 2025
Details
View Map
Share
Bampton Road

Thames Water were proposing to carry out Utility asset works on Bampton Road, Aston, Bampton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 29 May 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Mar 2025 at 09:54.

Thames Water logo
Between
31 Mar and 2 Apr 2025
Details
View Map
Share
White Barn

Thames Water were proposing to carry out Utility repair and maintenance works on White Barn, Boars Hill, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 2 April 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 8 Jan 2025 at 09:40.

Thames Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Main Road

Thames Water are proposing to carry out New service connection on Main Road, Stanton Harcourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 11:41.

Thames Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Main Road

Thames Water are proposing to carry out New service connection on Main Road, Stanton Harcourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 09:13.

Oxfordshire County Council logo
Between
7 and 11 May 2025
Details
View Map
Share
Follow
Eynsham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Eynsham Road, Sutton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Feb 2025 at 11:25.

Oxfordshire County Council logo
Between
7 and 11 May 2025
Details
View Map
Share
Eynsham Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Eynsham Road, Sutton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 May 2025 and run through until 11 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Feb 2025 at 09:58.

Oxfordshire County Council logo
Between
7 and 11 May 2025
Details
View Map
Share
Stanton Harcourt Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Stanton Harcourt Road, Eynsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 May 2025 and run through until 11 May 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Feb 2025 at 09:58.

Oxfordshire County Council logo
Between
7 and 11 May 2025
Details
View Map
Share
Follow
Stanton Harcourt Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Stanton Harcourt Road, Eynsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 11 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Feb 2025 at 11:28.

Oxfordshire County Council logo
Between
7 and 10 May 2025
Details
View Map
Share
Follow
Unnamed Oscar Street Running From 433308200854 To 435152201709

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed Oscar Street Running From 433308200854 To 435152201709, West Oxfordshire.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 May 2025 and could run through until 10 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Feb 2025 at 13:53.

National Highways logo
Between
26 and 28 May 2025
Details
View Map
Share
Follow
Northbound A420 Between Cumnor And North Hinksey

National Highways are proposing to carry out Utility repair and maintenance works on Northbound A420 Between Cumnor And North Hinksey, Cumnor, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2025 and could run through until 28 May 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 27 Feb 2025 at 13:33.

Thames Water logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Follow
Back Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Back Lane, Eynsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 23 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 5 Mar 2025 at 10:01.


Roadworks Map near to Standlake Road, WITNEY, OX29 5AZ

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 6 Mar 2025 23:30
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Standlake Road, WITNEY, OX29 5AZ (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.