ROADWORKS SUMMARY
Thornbury Road, WITNEY, OX29 4FW

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Thornbury Road, OX29 4FW and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Thornbury Road, WITNEY, OX29 4FW

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Thornbury Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
Five Mile Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Five Mile Drive, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 12:40 and could run through until 14 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Jan 2025 at 13:29.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
South Parade

Oxfordshire County Council are proposing to carry out Highway improvement works on South Parade, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:32.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
South Parade

Oxfordshire County Council are carrying out Highway improvement works on South Parade, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:26.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Field House Drive

Oxfordshire County Council are proposing to carry out Highway improvement works on Field House Drive, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:31.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Field House Drive

Oxfordshire County Council are carrying out Highway improvement works on Field House Drive, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:25.

Oxfordshire County Council logo
LONG TERM
Until
7 Feb 2025
Details
View Map
Share
Follow
Road Through Barnard Gate

Oxfordshire County Council are carrying out Highway repair and maintenance works on Road Through Barnard Gate, Barnard Gate, Witney.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:15 and could run through until 7 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 20 Jan 2025 at 14:07.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Unnamed A40 Section Running From 435136208675 To 435548208645

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed A40 Section Running From 435136208675 To 435548208645, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 12:11.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:21.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:09.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From Oxford Hill To A40

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From Oxford Hill To A40, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 11:47.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:28.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Hurst Rise Road

Thames Water are proposing to carry out Utility asset works on Hurst Rise Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:11.

Thames Water logo
LONG TERM
Until
17 Mar 2025
Details
View Map
Share
Follow
Hurst Rise Road

Thames Water are carrying out Utility asset works on Hurst Rise Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 12:00 and could run through until 17 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 10 Jan 2025 at 15:36.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland Mill

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland Mill, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:52.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland Mill

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland Mill, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Jan 2025 at 22:30.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:53.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Dec 2024 at 11:03.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Newland, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:29.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Woodgreen

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Woodgreen, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Woodgreen

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Woodgreen, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:31.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Schofield Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Schofield Avenue, Witney.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Jan 2025 at 09:18.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Wilsdon Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wilsdon Way, Kidlington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Oct 2024 at 08:11.

Oxfordshire County Council logo
LONG TERM
Between
7 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 10:35.

Oxfordshire County Council logo
LONG TERM
Until
16 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are carrying out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 07:00 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 7 Jan 2025 at 08:44.

Oxfordshire County Council logo
LONG TERM
Between
7 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 10:33.

Oxfordshire County Council logo
LONG TERM
Until
16 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are carrying out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 7 January 2025 at 07:00 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 7 Jan 2025 at 08:43.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Newland

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Newland, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:30.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
Park Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Park Road, Combe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:57.

Scottish Hydro Electric Power Dis logo
Finishing
Today
Details
View Map
Share
The Green

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on The Green, Coombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:53.

Thames Water logo
LONG TERM
Between
17 Jan and 28 Feb 2025
Details
View Map
Share
Standlake Road

Thames Water were proposing to carry out Utility asset works on Standlake Road, Northmoor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 January 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 16:10.

Thames Water logo
LONG TERM
Between
17 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Standlake Road

Thames Water are proposing to carry out Utility asset works on Standlake Road, Northmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:30.

Thames Water logo
LONG TERM
Until
3 Mar 2025
Details
View Map
Share
Follow
Standlake Road

Thames Water are carrying out Utility asset works on Standlake Road, Northmoor.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 20 January 2025 at 11:00 and could run through until 3 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 20 Jan 2025 at 11:48.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Bladon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:18.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Newland Mill

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland Mill, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jul 2024 at 12:00.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Newland Mill

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland Mill, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 12:18.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Newland Mill

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland Mill, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Dec 2024 at 10:02.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Newland

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2024 at 15:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Woodgreen

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Woodgreen, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2024 at 15:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Mar 2025
Details
View Map
Share
Follow
Schofield Avenue

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Schofield Avenue, Witney.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Jan 2025 at 10:09.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Park Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Park Road, Combe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:32.

Scottish Hydro Electric Power Dis logo
Until
13 Feb 2025
Details
View Map
Share
Follow
Park Road

Scottish Hydro Electric Power Dis are carrying out New service connection on Park Road, Combe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 10:10 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Jan 2025 at 11:10.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
The Green

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Green, Coombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:31.

Scottish Hydro Electric Power Dis logo
Until
13 Feb 2025
Details
View Map
Share
Follow
The Green

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on The Green, Coombe.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 January 2025 at 10:10 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Jan 2025 at 11:10.

Southern Gas Networks logo
Until
6 Feb 2025
Details
View Map
Share
Follow
Yarnton Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Yarnton Road, Cassington.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 29 January 2025 at 14:00 and could run through until 6 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 29 Jan 2025 at 15:14.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Eynsham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eynsham Road, Farmoor, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:33.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:01.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 14:09.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:00.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 14:21.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Oct 2024 at 11:41.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 14:24.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:03.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 7 Jan 2025 at 07:37.

Scottish Hydro Electric Power Dis logo
Between
7 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Newland

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Newland, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 07:30.

Scottish Hydro Electric Power Dis logo
Between
7 Feb and 3 Mar 2025
Details
View Map
Share
Follow
Woodgreen

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Woodgreen, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 7 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 07:35.

Oxfordshire County Council logo
LONG TERM
Between
10 Feb 2025 and 17 Sep 2026
Details
View Map
Share
Follow
Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Oxford Hill, Witney.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 17 Jan 2025 at 09:48.

Oxfordshire County Council logo
LONG TERM
Between
10 Feb 2025 and 17 Sep 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 17 Jan 2025 at 09:39.

Oxfordshire County Council logo
LONG TERM
Between
10 Feb 2025 and 17 Sep 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 17 Jan 2025 at 09:38.

Oxfordshire County Council logo
LONG TERM
Between
10 Feb 2025 and 17 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 17 Jan 2025 at 09:40.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 12:56.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 13 Jan 2025 at 11:15.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 12:57.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 13 Jan 2025 at 11:15.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 12:58.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 14:25.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:23.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 14:58.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:22.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 13:48.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:24.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 14:57.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Sunderland Avenue

BT are proposing to carry out Utility asset works on Sunderland Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 09:01.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Sunderland Avenue

BT are proposing to carry out Utility asset works on Sunderland Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 21 Nov 2024 at 11:06.

Oxfordshire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Oct 2024 at 09:31.

Oxfordshire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 13:30.

Oxfordshire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Oct 2024 at 09:29.

Oxfordshire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 13:29.

Oxfordshire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Oct 2024 at 09:30.

Oxfordshire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 6 Jan 2025 at 14:56.

Scottish Hydro Electric Power Dis logo
Between
24 Feb and 14 Mar 2025
Details
View Map
Share
West Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on West Way, Oxford.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 14 March 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 15:13.

Scottish Hydro Electric Power Dis logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Aristotle Lane

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Aristotle Lane, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 28 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Dec 2024 at 10:18.

Thames Water logo
Between
25 and 27 Feb 2025
Details
View Map
Share
Union Street

Thames Water were proposing to carry out Utility repair and maintenance works on Union Street, Woodstock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 February 2025 and run through until 27 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Dec 2024 at 13:51.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Eynsham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Eynsham Road, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:40.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
The Green

Oxfordshire County Council are proposing to carry out Highway improvement works on The Green, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:39.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Yarnton Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Yarnton Road, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:38.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Follow
Cassington Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Cassington Road, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 09:39.

Oxfordshire County Council logo
Between
10 and 21 Mar 2025
Details
View Map
Share
Cassington Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Cassington Road, Yarnton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 March 2025 and run through until 21 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 2 Dec 2024 at 14:28.

National Highways logo
Between
14 and 18 Mar 2025
Details
View Map
Share
Follow
Northbound A420 Between Cumnor And North Hinksey

National Highways are proposing to carry out Utility repair and maintenance works on Northbound A420 Between Cumnor And North Hinksey, Cumnor, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 March 2025 and could run through until 18 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 22 Jan 2025 at 14:42.

Thames Water logo
Between
17 and 21 Mar 2025
Details
View Map
Share
Follow
Finmore Road

Thames Water are proposing to carry out Utility repair and maintenance works on Finmore Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 March 2025 and could run through until 21 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Dec 2024 at 07:14.

National Highways logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Follow
West Way

National Highways are proposing to carry out Utility repair and maintenance works on West Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 March 2025 and could run through until 20 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 17 Jan 2025 at 14:23.

Thames Water logo
Between
18 and 20 Mar 2025
Details
View Map
Share
Union Street

Thames Water were proposing to carry out Utility repair and maintenance works on Union Street, Woodstock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 March 2025 and run through until 20 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Jan 2025 at 08:10.

Oxfordshire County Council logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Eynsham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Eynsham Road, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:42.

Oxfordshire County Council logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
The Green

Oxfordshire County Council are proposing to carry out Highway improvement works on The Green, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:42.

Oxfordshire County Council logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Yarnton Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Yarnton Road, Cassington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 10:40.

Oxfordshire County Council logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Cassington Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Cassington Road, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 9 Dec 2024 at 09:37.

Scottish Hydro Electric Power Dis logo
Between
31 Mar and 4 Apr 2025
Details
View Map
Share
Follow
Aristotle Lane

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Aristotle Lane, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 March 2025 and could run through until 4 April 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 20 Jan 2025 at 10:23.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
31 Mar and 30 Jun 2025
Details
View Map
Share
Wilsdon Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wilsdon Way, Kidlington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jan 2025 at 15:44.

Southern Gas Networks logo
LONG TERM
Between
3 Apr and 16 May 2025
Details
View Map
Share
Middle Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Middle Way, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 3 April 2025 and run through until 16 May 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Jan 2025 at 11:05.

Southern Gas Networks logo
LONG TERM
Between
3 Apr and 16 May 2025
Details
View Map
Share
Follow
Middle Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Middle Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 April 2025 and could run through until 16 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 20 Jan 2025 at 11:06.

Thames Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Main Road

Thames Water are proposing to carry out New service connection on Main Road, Stanton Harcourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 09:13.

Thames Water logo
Between
14 and 18 Apr 2025
Details
View Map
Share
Follow
Main Road

Thames Water are proposing to carry out New service connection on Main Road, Stanton Harcourt.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 17 Jan 2025 at 11:41.

Thames Water logo
Between
21 and 23 Apr 2025
Details
View Map
Share
Follow
Union Street

Thames Water are proposing to carry out Utility repair and maintenance works on Union Street, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 23 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 Jan 2025 at 09:57.


Roadworks Map near to Thornbury Road, WITNEY, OX29 4FW

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 30 Jan 2025 04:37
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Thornbury Road, WITNEY, OX29 4FW (5 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
MAJOR
  
FREELAND ROAD 
(0.4 miles)
Thames Water
New service connection - Carriageway, Verge - Road closure
Planned
Scheduled: 29 Jan 2025 - 30 Jan 2025
0.4
Details
Share
Follow
2
Thames Water logo
MAJOR
  
FREELAND ROAD 
(0.4 miles)
Thames Water
New service connection - Carriageway, Verge - Road closure
Planned
Scheduled: 29 Jan 2025 - 30 Jan 2025
0.4
Details
Share
Follow
3
Thames Water logo
QUEENS CLOSE 
(0.6 miles)
Thames Water
Utility asset works - Footway - Some carriageway incursion
Complete
29 Jan 2025 12:23 - 13:37
0.6
Details
Share
4
Scottish Hydro Electric Power Dis logo
URGENT
  
BEECH ROAD 
(0.6 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 18 Jan 2025 22:51
(Scheduled: 18 Jan 2025 - 31 Jan 2025)
0.6
Details
Share
Follow
5
Thames Water logo
DOVEHOUSE CLOSE 
(0.7 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Give and take
Planned
Scheduled: 29 Jan 2025 - 31 Jan 2025
0.7
Details
Share
Follow