ROADWORKS SUMMARY
Southfield Road, WITNEY, OX29 4FP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Southfield Road, OX29 4FP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Southfield Road, WITNEY, OX29 4FP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Southfield Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Cripley Road

Network Rail are carrying out Works for Rail Purposes on Cripley Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 8 January 2023 at 07:30 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 23 Sep 2024 at 12:04.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Roger Dudman Way

Network Rail are carrying out Works for Rail Purposes on Roger Dudman Way, Oxford.

These works are categorised as Major.

The works started on 25 January 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 13:05.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Roger Dudman Way

Network Rail are carrying out Works for Rail Purposes on Roger Dudman Way, Oxford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 March 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 13 Nov 2024 at 13:06.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Botley Road

Network Rail are carrying out Works for Rail Purposes on Botley Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2023 at 00:01 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Sep 2024 at 16:12.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Becket Street

Network Rail are carrying out Works for Rail Purposes on Becket Street, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 11 April 2023 at 00:01 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 19 Sep 2024 at 16:13.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Ferry Hinksey Road

Network Rail are carrying out Works for Rail Purposes on Ferry Hinksey Road, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Sep 2024 at 11:40.

Network Rail logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Botley Road

Network Rail are carrying out Works for Rail Purposes on Botley Road, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 16 May 2023 at 07:00 and could run through until 31 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 23 Sep 2024 at 11:39.

Thames Water logo
LONG TERM
Until
31 Mar 2025
Details
View Map
Share
Follow
Botley Road

Thames Water are carrying out Utility asset works on Botley Road, Oxford.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 11 March 2024 at 10:50 and could run through until 31 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 11 Mar 2024 at 10:57.

Southern Gas Networks logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Five Mile Drive

Southern Gas Networks are carrying out Utility repair and maintenance works on Five Mile Drive, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 August 2024 at 12:40 and could run through until 20 December 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 5 Nov 2024 at 14:50.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Plantation Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Plantation Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:14.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Observatory Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Observatory Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:13.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Observatory Street

Oxfordshire County Council are carrying out Highway improvement works on Observatory Street, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:37.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
St Bernard's Road

Oxfordshire County Council are proposing to carry out Highway improvement works on St Bernard's Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:13.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
St Bernard's Road

Oxfordshire County Council are carrying out Highway improvement works on St Bernard's Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:36.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Bevington Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Bevington Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 10:14.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Bevington Road

Oxfordshire County Council are carrying out Highway improvement works on Bevington Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:36.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
South Parade

Oxfordshire County Council are carrying out Highway improvement works on South Parade, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:26.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Plantation Road

Oxfordshire County Council are carrying out Highway improvement works on Plantation Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:35.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Leckford Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Leckford Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 09:30.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Leckford Road

Oxfordshire County Council are carrying out Highway improvement works on Leckford Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:33.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Canterbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Canterbury Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 31 May 2024 at 09:30.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Canterbury Road

Oxfordshire County Council are carrying out Highway improvement works on Canterbury Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:33.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Farndon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Farndon Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:56.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Farndon Road

Oxfordshire County Council are carrying out Highway improvement works on Farndon Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:31.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
St Margaret's Road

Oxfordshire County Council are proposing to carry out Highway improvement works on St Margaret's Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:41.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
St Margaret's Road

Oxfordshire County Council are carrying out Highway improvement works on St Margaret's Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:28.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
South Parade

Oxfordshire County Council are proposing to carry out Highway improvement works on South Parade, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:32.

Oxfordshire County Council logo
LONG TERM
Until
28 Feb 2025
Details
View Map
Share
Follow
Field House Drive

Oxfordshire County Council are carrying out Highway improvement works on Field House Drive, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:00 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 09:25.

Oxfordshire County Council logo
LONG TERM
Until
20 Dec 2024
Details
View Map
Share
Follow
Road Through Barnard Gate

Oxfordshire County Council are carrying out Highway repair and maintenance works on Road Through Barnard Gate, Barnard Gate, Witney.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 12 August 2024 at 08:15 and could run through until 20 December 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 12 Aug 2024 at 08:31.

Oxfordshire County Council logo
LONG TERM
Between
12 Aug 2024 and 28 Feb 2025
Details
View Map
Share
Follow
Field House Drive

Oxfordshire County Council are proposing to carry out Highway improvement works on Field House Drive, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2024 and could run through until 28 February 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 30 May 2024 at 13:31.

Southern Gas Networks logo
LONG TERM
Finishing
Today
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Oxford Road, Farmoor, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 19 August 2024 at 08:00 and could run through until 24 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 12 Nov 2024 at 10:15.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:21.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Unnamed A40 Section Running From 435136208675 To 435548208645

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed A40 Section Running From 435136208675 To 435548208645, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 12:11.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:09.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From Oxford Hill To A40

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From Oxford Hill To A40, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 11:47.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:28.

Oxfordshire County Council logo
LONG TERM
Until
6 Dec 2024
Details
View Map
Share
Follow
North Street

Oxfordshire County Council are carrying out roadworks on North Street, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 23 September 2024 at 07:00 and could run through until 6 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Sep 2024 at 08:31.

Oxfordshire County Council logo
LONG TERM
Until
6 Nov 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are carrying out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 06:00 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 09:09.

Oxfordshire County Council logo
LONG TERM
Until
6 Nov 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are carrying out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 06:00 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 09:10.

Oxfordshire County Council logo
LONG TERM
Until
6 Nov 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are carrying out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 November 2024 at 06:00 and could run through until 6 November 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Nov 2024 at 09:10.

Southern Gas Networks logo
Finishing
Friday
Details
View Map
Share
Follow
High Street

Southern Gas Networks are carrying out Utility repair and maintenance works on High Street, Cumnor, Oxford.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 14 November 2024 at 11:00 and could run through until 29 November 2024. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 22 Nov 2024 at 08:51.

Thames Water logo
LONG TERM
Between
18 Nov 2024 and 25 Apr 2025
Details
View Map
Share
Follow
Botley Road

Thames Water are proposing to carry out Section 58 on Botley Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 November 2024 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 22 Oct 2024 at 10:08.

Thames Water logo
LONG TERM
Until
25 Apr 2025
Details
View Map
Share
Follow
Botley Road

Thames Water are carrying out Section 58 on Botley Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 18 November 2024 at 11:00 and could run through until 25 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 11:15.

Oxfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Westminster Way

Oxfordshire County Council are proposing to carry out Highway improvement works on Westminster Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 16 Sep 2024 at 11:54.

Oxfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Westminster Way

Oxfordshire County Council are proposing to carry out Highway improvement works on Westminster Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 November 2024 and could run through until 29 November 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 11:44.

Network Rail logo
LONG TERM
Between
2 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Botley Road

Network Rail are proposing to carry out Works for Rail Purposes on Botley Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 1 Nov 2024 at 10:09.

Network Rail logo
LONG TERM
Between
2 Dec 2024 and 10 Jan 2025
Details
View Map
Share
Follow
Botley Road

Network Rail are proposing to carry out Works for Rail Purposes on Botley Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 December 2024 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by Network Rail on 11 Nov 2024 at 10:47.

Thames Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
New Yatt Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Yatt Road, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Sep 2024 at 15:22.

Thames Water logo
Between
11 and 13 Dec 2024
Details
View Map
Share
Follow
New Yatt Road

Thames Water are proposing to carry out Utility repair and maintenance works on New Yatt Road, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 December 2024 and could run through until 13 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Sep 2024 at 11:20.

Southern Gas Networks logo
LONG TERM
Between
13 Dec 2024 and 17 Jan 2025
Details
View Map
Share
Eynsham Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Eynsham Road, Farmoor, Oxford.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 December 2024 and run through until 17 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:29.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:53.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Woodgreen

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Woodgreen, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:51.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 7 Feb 2025
Details
View Map
Share
Newland Mill

Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland Mill, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:52.

Neoscorp logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Cycle Track Adjacent Community Centre On Witan Way

Neoscorp are proposing to carry out Utility asset works on Cycle Track Adjacent Community Centre On Witan Way, Witney.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the cycleway and footpath.

This roadwork event was last updated by Neoscorp on 11 Oct 2024 at 12:47.

Neoscorp logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Cycle Track Adjacent Community Centre On Witan Way

Neoscorp are proposing to carry out Utility asset works on Cycle Track Adjacent Community Centre On Witan Way, Witney.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the cycleway and footpath.

This roadwork event was last updated by Neoscorp on 4 Oct 2024 at 13:46.

Scottish Hydro Electric Power Dis logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Hollybush Row

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Hollybush Row, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 11:50.

Scottish Hydro Electric Power Dis logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
St Thomas Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on St Thomas Street, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Nov 2024 at 11:30.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Hurst Rise Road

Thames Water are proposing to carry out Utility asset works on Hurst Rise Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 15:40.

Thames Water logo
LONG TERM
Between
6 Jan and 16 Mar 2025
Details
View Map
Share
Follow
Hurst Rise Road

Thames Water are proposing to carry out Utility asset works on Hurst Rise Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 16 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Nov 2024 at 10:11.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
6 Jan and 31 Mar 2025
Details
View Map
Share
Follow
Wilsdon Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wilsdon Way, Kidlington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 March 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 31 Oct 2024 at 08:11.

Oxfordshire County Council logo
LONG TERM
Between
7 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 10:35.

Oxfordshire County Council logo
LONG TERM
Between
7 Jan and 16 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 January 2025 and could run through until 16 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 10:33.

Thames Water logo
Between
8 and 13 Jan 2025
Details
View Map
Share
Woodstock Road

Thames Water were proposing to carry out Utility repair and maintenance works on Woodstock Road, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 January 2025 and run through until 13 January 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 7 Oct 2024 at 11:44.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Church Green

Southern Gas Networks are proposing to carry out New service connection on Church Green, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 Nov 2024 at 11:14.

Southern Gas Networks logo
Between
13 and 17 Jan 2025
Details
View Map
Share
Follow
Church Green

Southern Gas Networks are proposing to carry out New service connection on Church Green, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 17 January 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 19 Nov 2024 at 08:48.

Scottish Hydro Electric Power Dis logo
Between
13 and 30 Jan 2025
Details
View Map
Share
Park Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Park Road, Combe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:57.

Scottish Hydro Electric Power Dis logo
Between
13 and 30 Jan 2025
Details
View Map
Share
The Green

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on The Green, Coombe.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:53.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Newland

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Newland, Witney.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:30.

Thames Water logo
LONG TERM
Between
17 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Standlake Road

Thames Water are proposing to carry out Utility asset works on Standlake Road, Northmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 08:30.

Thames Water logo
LONG TERM
Between
17 Jan and 28 Feb 2025
Details
View Map
Share
Standlake Road

Thames Water were proposing to carry out Utility asset works on Standlake Road, Northmoor.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 January 2025 and run through until 28 February 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Oct 2024 at 16:10.

Thames Water logo
LONG TERM
Between
17 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Standlake Road

Thames Water are proposing to carry out Utility asset works on Standlake Road, Northmoor.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 January 2025 and could run through until 28 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 5 Nov 2024 at 16:26.

Southern Gas Networks logo
LONG TERM
Between
20 Jan and 14 Mar 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Bladon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 January 2025 and could run through until 14 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 8 Nov 2024 at 11:18.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Woodgreen

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Woodgreen, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2024 at 15:59.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
The Green

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Green, Coombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 10:58.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
The Green

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Green, Coombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:31.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Park Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Park Road, Combe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 5 Nov 2024 at 15:58.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 13 Feb 2025
Details
View Map
Share
Follow
Park Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Park Road, Combe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:32.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
St Thomas Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on St Thomas Street, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jul 2024 at 10:00.

Scottish Hydro Electric Power Dis logo
Between
27 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Hollybush Row

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Hollybush Row, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 3 Jul 2024 at 10:00.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Newland

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2024 at 15:59.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
27 Jan and 28 Feb 2025
Details
View Map
Share
Follow
Newland Mill

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland Mill, Witney.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jul 2024 at 12:00.

Southern Gas Networks logo
LONG TERM
Between
3 Feb and 28 Apr 2025
Details
View Map
Share
Follow
Eynsham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Eynsham Road, Farmoor, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 28 April 2025. The works will impact the carriageway only.

This roadwork event was last updated by Southern Gas Networks on 18 Nov 2024 at 08:33.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:03.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Oct 2024 at 11:41.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:00.

Oxfordshire County Council logo
Between
4 and 7 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 February 2025 and could run through until 7 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:01.

Thames Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
North Hinksey Lane

Thames Water are proposing to carry out Utility repair and maintenance works on North Hinksey Lane, North Hinksey, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 13 Nov 2024 at 15:13.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:23.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:22.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 11:24.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 12:57.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 12:56.

Oxfordshire County Council logo
Between
11 and 13 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 February 2025 and could run through until 13 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Aug 2024 at 12:58.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Sunderland Avenue

BT are proposing to carry out Utility asset works on Sunderland Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 18 Nov 2024 at 09:01.

BT logo
Between
17 and 19 Feb 2025
Details
View Map
Share
Follow
Sunderland Avenue

BT are proposing to carry out Utility asset works on Sunderland Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 19 February 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 21 Nov 2024 at 11:06.

Oxfordshire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Woodstock Road West

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road West, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Oct 2024 at 09:31.

Oxfordshire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Woodstock Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Oct 2024 at 09:30.

Oxfordshire County Council logo
Between
18 and 20 Feb 2025
Details
View Map
Share
Follow
Woodstock Road East

Oxfordshire County Council are proposing to carry out Highway improvement works on Woodstock Road East, Begbroke.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 February 2025 and could run through until 20 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Oct 2024 at 09:29.


Roadworks Map near to Southfield Road, WITNEY, OX29 4FP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 24 Nov 2024 07:27
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Southfield Road, WITNEY, OX29 4FP (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Virgin Media logo
GREENS ROAD 
(0.8 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Cancelled
(Scheduled: 22 Nov 2024 - 25 Nov 2024)
0.8
Details
Share
2
Virgin Media logo
GREENS ROAD 
(0.8 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 26 Nov 2024
0.8
Details
Share
Follow
3
Virgin Media logo
GREENS ROAD 
(0.8 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Cancelled
(Scheduled: 22 Nov 2024 - 25 Nov 2024)
0.8
Details
Share
4
Virgin Media logo
GREENS ROAD 
(0.8 miles)
Virgin Media
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 25 Nov 2024 - 26 Nov 2024
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.