ROADWORKS SUMMARY
Fieldmere Close, WITNEY, OX28 5DA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Fieldmere Close, OX28 5DA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Fieldmere Close, WITNEY, OX28 5DA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Fieldmere Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Unnamed A40 Section Running From 435136208675 To 435548208645

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed A40 Section Running From 435136208675 To 435548208645, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 12:11.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:21.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:09.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From Oxford Hill To A40

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From Oxford Hill To A40, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 11:47.

Oxfordshire County Council logo
LONG TERM
Between
7 Sep 2024 and 11 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:28.

Oxfordshire County Council logo
LONG TERM
Until
17 Sep 2026
Details
View Map
Share
Follow
Oxford Hill

Oxfordshire County Council are carrying out Highway improvement works on Oxford Hill, Witney.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:30 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 12:13.

Oxfordshire County Council logo
LONG TERM
Until
17 Sep 2026
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are carrying out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:30 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 12:12.

Oxfordshire County Council logo
LONG TERM
Until
17 Sep 2026
Details
View Map
Share
Follow
A40 Westbound Dual Carriageway To Downs Road Bridge

Oxfordshire County Council are carrying out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:30 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 12:12.

Oxfordshire County Council logo
LONG TERM
Until
17 Sep 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are carrying out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 10 February 2025 at 10:30 and could run through until 17 September 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Feb 2025 at 12:12.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
14 Apr and 22 Aug 2025
Details
View Map
Share
Follow
Cycle Track Adjacent Community Centre On Witan Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Cycle Track Adjacent Community Centre On Witan Way, Witney.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 14 April 2025 and could run through until 22 August 2025. The works will impact the cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 25 Feb 2025 at 09:46.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
28 Aug 2025
Details
View Map
Share
Follow
Cycle Track Adjacent Community Centre On Witan Way

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Cycle Track Adjacent Community Centre On Witan Way, Witney.

These works are categorised as Major.

The works should not impact the carriageway.

The works started on 17 April 2025 at 08:00 and could run through until 28 August 2025. The works will impact the carriageway, cycleway and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 May 2025 at 12:21.

Southern Gas Networks logo
LONG TERM
Between
21 Apr and 13 Jun 2025
Details
View Map
Share
Follow
Middletown

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Middletown, Hailey.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 13 June 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 13 Feb 2025 at 09:28.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Downs Road

Thames Water are carrying out New service connection on Downs Road, Witney.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:10 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:09.

Thames Water logo
LONG TERM
Finishing
Friday
Details
View Map
Share
Follow
Downs Road

Thames Water are carrying out New service connection on Downs Road, Curbridge, Witney.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 09:10 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 11:07.

Thames Water logo
Until
10 Jun 2025
Details
View Map
Share
Follow
Brize Norton Road

Thames Water are carrying out Utility repair and maintenance works on Brize Norton Road, Carterton.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 20 May 2025 at 10:00 and could run through until 10 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 28 May 2025 at 09:29.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Corbett Road

Thames Water are carrying out Disconnection or alteration of supply on Corbett Road, Carterton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 3 June 2025 at 08:30 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 3 Jun 2025 at 09:41.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Corbett Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Corbett Road, Carterton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2025 and could run through until 6 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 08:18.

Oxfordshire County Council logo
Between
9 and 25 Jun 2025
Details
View Map
Share
Follow
A40 Section From Barnard Gate To Eynsham Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Section From Barnard Gate To Eynsham Roundabout, Eynsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2025 at 16:46.

Thames Water logo
Between
10 and 12 Jun 2025
Details
View Map
Share
Follow
Road From Leafield Road To Fairspear Hill Farm

Thames Water are proposing to carry out Utility repair and maintenance works on Road From Leafield Road To Fairspear Hill Farm, Leafield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 June 2025 and could run through until 12 June 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 18 Mar 2025 at 14:09.

Oxfordshire County Council logo
Between
16 Jun and 2 Jul 2025
Details
View Map
Share
Follow
A40 Section From Barnard Gate To Eynsham Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Section From Barnard Gate To Eynsham Roundabout, Eynsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Jun 2025 at 10:07.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul 2025 and 22 May 2026
Details
View Map
Share
Follow
Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Oxford Hill, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 22 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 8 May 2025 at 09:31.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul 2025 and 22 May 2026
Details
View Map
Share
Follow
Section Of B4022 From A40 To Oxford Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 22 May 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 8 May 2025 at 09:31.

Oxfordshire County Council logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Main Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Main Road, Fawler.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Apr 2025 at 10:25.

Oxfordshire County Council logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Main Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Main Road, Fawler.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Apr 2025 at 08:51.

Oxfordshire County Council logo
Between
14 and 19 Aug 2025
Details
View Map
Share
Follow
A40 Section From Asthall Roundabout To Oxford Road

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Section From Asthall Roundabout To Oxford Road, Asthall, Burford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Apr 2025 at 08:18.

Oxfordshire County Council logo
Between
14 and 19 Aug 2025
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Oxford Road, Burford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 August 2025 and could run through until 19 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Apr 2025 at 08:17.

Oxfordshire County Council logo
Between
25 and 29 Aug 2025
Details
View Map
Share
Follow
A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 29 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 24 Apr 2025 at 15:03.


Roadworks Map near to Fieldmere Close, WITNEY, OX28 5DA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 11:48
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Fieldmere Close, WITNEY, OX28 5DA (7 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
THORNEY LEYS 
(0.5 miles)
BT
Utility asset works - Footway - No carriageway incursion
Planned
Scheduled: 2 Jun 2025 - 4 Jun 2025
0.5
Details
Share
Follow
2
Oxfordshire County Council logo
MAJOR
  
UNNAMED A40 SECTION RUNNING FROM 435136208675 TO 435548208645 
(0.7 miles)
Oxfordshire County Council
Highway improvement works - Carriageway - Lane closure
Planned
Scheduled: 7 Sep 2024 - 11 Sep 2026
0.7
Details
Share
Follow
3
Thames Water logo
MILL STREET 
(0.8 miles)
Thames Water
Permanent reinstatement - Carriageway - Two-way signals
Planned
Scheduled: 4 Jun 2025
0.8
Details
Share
Follow
4
Scottish Hydro Electric Power Dis logo
MAJOR
  
CYCLE TRACK ADJACENT COMMUNITY CENTRE ON WITAN WAY 
(0.8 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Cycleway, Footpath - No carriageway incursion
Planned
Scheduled: 14 Apr 2025 - 22 Aug 2025
0.8
Details
Share
Follow
5
Scottish Hydro Electric Power Dis logo
MAJOR
  
CYCLE TRACK ADJACENT COMMUNITY CENTRE ON WITAN WAY 
(0.8 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Carriageway, Cycleway, Footpath - No carriageway incursion
In Progress
Since: 17 Apr 2025 08:00
(Scheduled: 14 Apr 2025 - 28 Aug 2025)
0.8
Details
Share
Follow
6
Thames Water logo
URGENT
  
AVENUE TWO 
(0.8 miles)
Thames Water
Utility repair and maintenance works - Verge - Some carriageway incursion
In Progress
Since: 2 Jun 2025 19:29
(Scheduled: 2 Jun 2025 - 4 Jun 2025)
0.8
Details
Share
Follow
7
NEW CLOSE LANE 
(0.8 miles)
FRESHWAVE FACILITIES LIMITED
Utility asset works - Verge - Two-way signals
In Progress
Since: 27 May 2025 10:00
(Scheduled: 27 May 2025 - 9 Jun 2025)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.