ROADWORKS SUMMARY
Pensclose, WITNEY, OX28 2EG
Introduction
View current and future planned roadworks and road closures for Pensclose, OX28 2EG and the surrounding area.
Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.
The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.
Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.
Data are provided by the Department for Transport.
Have we helped today?
If we have helped you today, please consider buying us a quick coffee to keep us going!
Major Roadworks near to Pensclose, WITNEY, OX28 2EG
Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Pensclose are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.
7 Feb 2025
Oxfordshire County Council are carrying out Highway repair and maintenance works on Road Through Barnard Gate, Barnard Gate, Witney.
These works are categorised as Major.
Two-way signals are to be in place for some or all of the period and could cause delays to journeys.
The works started on 12 August 2024 at 08:15 and could run through until 7 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Oxfordshire County Council on 20 Jan 2025 at 14:07.
7 Sep 2024 and 11 Sep 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed A40 Section Running From 435136208675 To 435548208645, Witney.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 12:11.
7 Sep 2024 and 11 Sep 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:21.
7 Sep 2024 and 11 Sep 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:09.
7 Sep 2024 and 11 Sep 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From Oxford Hill To A40, Witney.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 15 May 2024 at 11:47.
7 Sep 2024 and 11 Sep 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 7 September 2024 and could run through until 11 September 2026. The works will impact the carriageway only.
*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.
This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2024 at 09:28.
6 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland, Witney.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 19 Dec 2024 at 11:03.
6 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland, Witney.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:53.
6 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Newland, Witney.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:29.
6 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland Mill, Witney.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Jan 2025 at 22:30.
6 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Woodgreen, Witney.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:51.
6 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland Mill, Witney.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Nov 2024 at 11:52.
6 Jan and 7 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Woodgreen, Witney.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 6 January 2025 and run through until 7 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 11 Dec 2024 at 12:31.
6 Jan and 28 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Schofield Avenue, Witney.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 6 January 2025 and could run through until 28 February 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 14 Jan 2025 at 09:18.
Today
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on The Green, Coombe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:53.
13 Jan and 14 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Newland, Witney.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 7 Nov 2024 at 09:30.
Today
Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Park Road, Combe.
These works were categorised as Major.
The road was planned to be closed for some or all of the period. However, the works were cancelled.
The works were originally planned to start 13 January 2025 and run through until 30 January 2025. The works were due to impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 21 Oct 2024 at 11:57.
27 Jan and 28 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Schofield Avenue, Witney.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 March 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Jan 2025 at 10:09.
27 Jan and 28 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Woodgreen, Witney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2024 at 15:59.
13 Feb 2025
Scottish Hydro Electric Power Dis are carrying out New service connection on Park Road, Combe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 10:10 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Jan 2025 at 11:10.
27 Jan and 13 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Park Road, Combe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:32.
27 Jan and 28 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland, Witney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Jul 2024 at 15:59.
27 Jan and 14 Feb 2025
Scottish Hydro Electric Power Dis were proposing to carry out Utility asset works on Newland Mill, Witney.
These works were categorised as Major.
Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.
The works were originally planned to start 27 January 2025 and run through until 14 February 2025. The works were due to impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 16 Dec 2024 at 10:02.
27 Jan and 14 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland Mill, Witney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 14 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Dec 2024 at 12:18.
27 Jan and 28 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Newland Mill, Witney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 28 February 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Jul 2024 at 12:00.
27 Jan and 13 Feb 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on The Green, Coombe.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 27 January 2025 and could run through until 13 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Nov 2024 at 15:31.
13 Feb 2025
Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on The Green, Coombe.
These works are categorised as Major.
The road is closed for some or all of the period and could cause delays to journeys.
The works started on 27 January 2025 at 10:10 and could run through until 13 February 2025. The works will impact the carriageway and verge.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Jan 2025 at 11:10.
7 Feb and 3 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Newland, Witney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 07:30.
7 Feb and 3 Mar 2025
Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Woodgreen, Witney.
These works are categorised as Major.
Multi-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 7 February 2025 and could run through until 3 March 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Jan 2025 at 07:35.
10 Feb 2025 and 17 Sep 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of B4022 From A40 To Oxford Hill, Witney.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Jan 2025 at 09:40.
10 Feb 2025 and 17 Sep 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Westbound Dual Carriageway To Downs Road Bridge, Witney.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Jan 2025 at 09:38.
10 Feb 2025 and 17 Sep 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Eastbound Dual Carriageway Running From Downs Road Bridge To B4022 Slip Road, Witney.
These works are categorised as Major.
A lane will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Jan 2025 at 09:39.
10 Feb 2025 and 17 Sep 2026
Oxfordshire County Council are proposing to carry out Highway improvement works on Oxford Hill, Witney.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 10 February 2025 and could run through until 17 September 2026. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 17 Jan 2025 at 09:48.
12 and 14 Feb 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Peaks Lane, Stonesfield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.
This roadwork event was last updated by Thames Water on 19 Nov 2024 at 08:46.
11 and 26 Mar 2025
Oxfordshire County Council are proposing to carry out Highway improvement works on Fairspear Road, Leafield.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 11 March 2025 and could run through until 26 March 2025. The works will impact the carriageway only.
This roadwork event was last updated by Oxfordshire County Council on 29 Jan 2025 at 14:02.
8 and 10 Apr 2025
Thames Water are proposing to carry out Utility repair and maintenance works on Road Between Lew And Bampton, Lew, Bampton.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 8 April 2025 and could run through until 10 April 2025. The works will impact the verge only.
This roadwork event was last updated by Thames Water on 10 Jan 2025 at 11:45.
14 and 18 Apr 2025
Thames Water are proposing to carry out New service connection on Main Road, Stanton Harcourt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Jan 2025 at 11:41.
14 and 18 Apr 2025
Thames Water are proposing to carry out New service connection on Main Road, Stanton Harcourt.
These works are categorised as Major.
The road will be closed for some or all of the period and could cause delays to journeys.
The works will start on or after 14 April 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.
This roadwork event was last updated by Thames Water on 17 Jan 2025 at 09:13.
21 Apr and 31 May 2025
Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Delly Hill, Hailey.
These works are categorised as Major.
Two-way signals will be in place for some or all of the period and could cause delays to journeys.
The works will start on or after 21 April 2025 and could run through until 31 May 2025. The works will impact the footway and carriageway.
This roadwork event was last updated by Southern Gas Networks on 23 Jan 2025 at 10:59.
Roadworks Map near to Pensclose, WITNEY, OX28 2EG
- Any red lines indicate the extent of the works.
- Clicking on the map will re-centre to the selected point.
- Within 1 mile, all roadworks are displayed.
- Within 2-3 miles, standard, urgent and major roadworks are displayed.
- For 3-5 miles, only major roadworks are shown.
- The higher the marker number, the further away the roadworks are from the centre of the postcode.
- Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.
Roadworks Listing near to Pensclose, WITNEY, OX28 2EG (35 Events)
(Scheduled Dates)
(miles)
Contains public sector information licensed under the Open Government Licence v3.0.