ROADWORKS SUMMARY
The Homestead, WOODSTOCK, OX20 1XA

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for The Homestead, OX20 1XA and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to The Homestead, WOODSTOCK, OX20 1XA

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for The Homestead are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
28 Feb and 14 Oct 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Long Hanborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 08:55.

Oxfordshire County Council logo
LONG TERM
Between
26 Mar and 4 Sep 2025
Details
View Map
Share
Follow
A40 Cycle Path From Cherwell District Boundary To Wolvercote Roundabout

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on A40 Cycle Path From Cherwell District Boundary To Wolvercote Roundabout, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 8 Apr 2025 at 10:33.

Oxfordshire County Council logo
LONG TERM
Until
4 Sep 2025
Details
View Map
Share
Follow
A40 Cycle Path From Cherwell District Boundary To Wolvercote Roundabout

Oxfordshire County Council are carrying out Highway repair and maintenance works on A40 Cycle Path From Cherwell District Boundary To Wolvercote Roundabout, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 08:00 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Oxfordshire County Council on 3 Jun 2025 at 09:14.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
31 Mar and 30 Jun 2025
Details
View Map
Share
Wilsdon Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wilsdon Way, Kidlington.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 31 March 2025 and run through until 30 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Jan 2025 at 15:44.

Southern Gas Networks logo
LONG TERM
Until
13 Jun 2025
Details
View Map
Share
Follow
Middle Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Middle Way, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 08:40 and could run through until 13 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 6 May 2025 at 08:49.

Southern Gas Networks logo
LONG TERM
Between
6 May and 13 Jun 2025
Details
View Map
Share
Middle Way

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Middle Way, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 May 2025 and run through until 13 June 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 10 Mar 2025 at 15:17.

Thames Water logo
LONG TERM
Until
6 Jul 2025
Details
View Map
Share
Follow
Wheatley Road

Thames Water are carrying out Utility asset works on Wheatley Road, Islip.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 6 May 2025 at 10:30 and could run through until 6 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 6 May 2025 at 11:32.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
St Marys Close

Thames Water are carrying out Utility repair and maintenance works on St Marys Close, Kidlington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 May 2025 at 08:30 and could run through until 6 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 28 May 2025 at 14:10.

Gigaclear logo
Until
12 Jun 2025
Details
View Map
Share
Follow
Witney Lane

Gigaclear are carrying out Utility asset works on Witney Lane, Stonesfield.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 May 2025 at 08:00 and could run through until 12 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 May 2025 at 08:58.

Gigaclear logo
Between
23 May and 11 Jun 2025
Details
View Map
Share
Follow
Witney Lane

Gigaclear are proposing to carry out Utility asset works on Witney Lane, Stonesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 May 2025 and could run through until 11 June 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 17 Feb 2025 at 09:49.

Oxfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Main Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Main Road, Over Kiddington, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 11 Mar 2025 at 11:56.

Oxfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Section Of A44 From B4027 To Slape Bridge

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A44 From B4027 To Slape Bridge, Glympton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 31 May 2025 and could run through until 3 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 11 Mar 2025 at 11:56.

Oxfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Upper Campsfield Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Upper Campsfield Road, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 11 Mar 2025 at 11:33.

Oxfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Shipton Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Shipton Road, Shipton On Cherwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 11 Mar 2025 at 11:32.

Oxfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Shipton Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Shipton Road, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 11 Mar 2025 at 11:31.

Oxfordshire County Council logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Banbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 June 2025 and could run through until 4 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 11 Mar 2025 at 11:10.

Thames Water logo
Between
2 and 23 Jun 2025
Details
View Map
Share
Back Lane

Thames Water were proposing to carry out Utility repair and maintenance works on Back Lane, Eynsham.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 June 2025 and run through until 23 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 15:03.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Green Road

Thames Water are carrying out New service connection on Green Road, Kidlington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 June 2025 at 13:15 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 2 Jun 2025 at 15:01.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Green Road

Thames Water are proposing to carry out New service connection on Green Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 6 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 31 Mar 2025 at 10:33.

BT logo
Finishing
Friday
Details
View Map
Share
Follow
Swan Lane

BT are proposing to carry out Utility asset works on Swan Lane, Long Hanborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 June 2025 and could run through until 6 June 2025. The works will impact the verge only.

This roadwork event was last updated by BT on 27 Mar 2025 at 11:47.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Green Road

Thames Water are proposing to carry out Utility repair and maintenance works on Green Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 15 May 2025 at 12:13.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Green Road

Thames Water are proposing to carry out Utility repair and maintenance works on Green Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 3 Apr 2025 at 07:09.

Thames Water logo
Finishing
Monday
Details
View Map
Share
Follow
Green Road

Thames Water are proposing to carry out Utility repair and maintenance works on Green Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 June 2025 and could run through until 9 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 20 Mar 2025 at 07:56.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Boot Street

Thames Water are proposing to carry out New service connection on Boot Street, Stonesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 14:46.

Oxfordshire County Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Godstow Road

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Godstow Road, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 9 June 2025 and run through until 20 June 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 21 Feb 2025 at 09:35.

Oxfordshire County Council logo
Between
9 and 25 Jun 2025
Details
View Map
Share
Follow
A40 Section From Barnard Gate To Eynsham Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Section From Barnard Gate To Eynsham Roundabout, Eynsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 25 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 15 May 2025 at 16:46.

Thames Water logo
Between
9 and 12 Jun 2025
Details
View Map
Share
Follow
Boot Street

Thames Water are proposing to carry out New service connection on Boot Street, Stonesfield.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 12 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 13 Mar 2025 at 15:02.

Oxfordshire County Council logo
Between
9 and 20 Jun 2025
Details
View Map
Share
Follow
Godstow Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Godstow Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 June 2025 and could run through until 20 June 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Mar 2025 at 10:16.

Oxfordshire County Council logo
Between
16 Jun and 2 Jul 2025
Details
View Map
Share
Follow
A40 Section From Barnard Gate To Eynsham Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on A40 Section From Barnard Gate To Eynsham Roundabout, Eynsham.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 16 June 2025 and could run through until 2 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Jun 2025 at 10:07.

BT logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Oxford Road

BT are proposing to carry out Utility asset works on Oxford Road, Kidlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 13 May 2025 at 13:10.

BT logo
Between
20 and 24 Jun 2025
Details
View Map
Share
Follow
Oxford Road

BT are proposing to carry out Utility asset works on Oxford Road, Kidlington.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 June 2025 and could run through until 24 June 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 24 Mar 2025 at 10:01.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Springwell Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Springwell Hill, Bletchingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 23 Apr 2025 at 12:16.

Thames Water logo
Between
23 Jun and 4 Jul 2025
Details
View Map
Share
Follow
Springwell Hill

Thames Water are proposing to carry out Utility repair and maintenance works on Springwell Hill, Bletchingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 4 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 08:58.

Southern Gas Networks logo
LONG TERM
Between
23 Jun and 31 Jul 2025
Details
View Map
Share
Follow
Grove Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grove Road, Bladon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2025 and could run through until 31 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 May 2025 at 11:17.

Thames Water logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Follow
Back Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Back Lane, Eynsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 11 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Mar 2025 at 15:18.

Scottish Hydro Electric Power Dis logo
Between
30 Jun and 11 Jul 2025
Details
View Map
Share
Fairfax Road

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Fairfax Road, Kidlington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 30 June 2025 and run through until 11 July 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Apr 2025 at 08:28.

Thames Water logo
Between
30 Jun and 2 Jul 2025
Details
View Map
Share
Follow
Carlton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Carlton Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2025 and could run through until 2 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 9 Apr 2025 at 08:25.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
High Street

Oxfordshire County Council were proposing to carry out Highway improvement works on High Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 11 Feb 2025 at 11:05.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Kings Head Lane

Oxfordshire County Council were proposing to carry out Highway improvement works on Kings Head Lane, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 11 Feb 2025 at 11:05.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
The Walk

Oxfordshire County Council were proposing to carry out Highway improvement works on The Walk, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 11 Feb 2025 at 11:05.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Middle Street

Oxfordshire County Council were proposing to carry out Highway improvement works on Middle Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 11 Feb 2025 at 11:05.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Lower Street

Oxfordshire County Council were proposing to carry out Highway improvement works on Lower Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 11 Feb 2025 at 11:05.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Mill Street

Oxfordshire County Council were proposing to carry out Highway improvement works on Mill Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 11 Feb 2025 at 11:05.

Scottish Hydro Electric Power Dis logo
Between
7 and 11 Jul 2025
Details
View Map
Share
Follow
Mill Street

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Mill Street, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 11 July 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 24 Apr 2025 at 12:49.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 31 Aug 2025
Details
View Map
Share
Wheatley Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Wheatley Road, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 31 August 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 17 Jan 2025 at 12:46.

BT logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Oxford Road

BT are proposing to carry out Utility asset works on Oxford Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 15 May 2025 at 13:27.

BT logo
Between
7 and 9 Jul 2025
Details
View Map
Share
Follow
Oxford Road

BT are proposing to carry out Utility asset works on Oxford Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 9 July 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by BT on 3 Apr 2025 at 07:50.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
High Street

Oxfordshire County Council were proposing to carry out Highway improvement works on High Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:16.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Follow
High Street

Oxfordshire County Council are proposing to carry out Highway improvement works on High Street, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 11:13.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Middle Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Middle Street, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 11:12.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Middle Street

Oxfordshire County Council were proposing to carry out Highway improvement works on Middle Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:16.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Mill Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Mill Street, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 08:01.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Kings Head Lane

Oxfordshire County Council were proposing to carry out Highway improvement works on Kings Head Lane, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:15.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Kings Head Lane

Oxfordshire County Council are proposing to carry out Highway improvement works on Kings Head Lane, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 08:03.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
The Walk

Oxfordshire County Council were proposing to carry out Highway improvement works on The Walk, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:15.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Follow
The Walk

Oxfordshire County Council are proposing to carry out Highway improvement works on The Walk, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 08:02.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Lower Street

Oxfordshire County Council were proposing to carry out Highway improvement works on Lower Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:14.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Follow
Lower Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Lower Street, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 08:04.

Oxfordshire County Council logo
LONG TERM
Between
14 Jul and 7 Sep 2025
Details
View Map
Share
Mill Street

Oxfordshire County Council were proposing to carry out Highway improvement works on Mill Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:14.

Scottish Hydro Electric Power Dis logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Thorne Close

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Thorne Close, Kidlington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 1 August 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Feb 2025 at 13:32.

Scottish Hydro Electric Power Dis logo
Between
21 Jul and 8 Aug 2025
Details
View Map
Share
Follow
Thorne Close

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Thorne Close, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 8 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Apr 2025 at 08:54.

Scottish Hydro Electric Power Dis logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Oxford Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Oxford Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 17 Apr 2025 at 13:45.

Scottish Hydro Electric Power Dis logo
Between
21 Jul and 1 Aug 2025
Details
View Map
Share
Follow
Oxford Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Oxford Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 July 2025 and could run through until 1 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Apr 2025 at 09:55.

Oxfordshire County Council logo
Between
22 and 24 Jul 2025
Details
View Map
Share
Follow
Main Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Main Road, Fawler.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2025 and could run through until 24 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 23 Apr 2025 at 10:25.

Oxfordshire County Council logo
Between
24 and 26 Jul 2025
Details
View Map
Share
Follow
Main Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Main Road, Fawler.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 26 July 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Apr 2025 at 08:51.

Scottish Hydro Electric Power Dis logo
Between
28 and 31 Jul 2025
Details
View Map
Share
Pigeon House Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Pigeon House Lane, Church Hanborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 July 2025 and run through until 31 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 12 May 2025 at 16:39.

Electricity Network Company logo
Between
28 Jul and 26 Aug 2025
Details
View Map
Share
Follow
Oxford Street

Electricity Network Company are proposing to carry out Utility asset works on Oxford Street, Woodstock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 July 2025 and could run through until 26 August 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 16 May 2025 at 08:35.

Oxfordshire County Council logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Banbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Mar 2025 at 14:41.

Oxfordshire County Council logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Langford Lane

Oxfordshire County Council are proposing to carry out Highway improvement works on Langford Lane, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Mar 2025 at 15:04.

Oxfordshire County Council logo
Between
30 Jul and 2 Aug 2025
Details
View Map
Share
Follow
Banbury Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Banbury Road, Thrupp.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 July 2025 and could run through until 2 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Mar 2025 at 14:59.

Oxfordshire County Council logo
Between
4 and 6 Aug 2025
Details
View Map
Share
Follow
Grovelands

Oxfordshire County Council are proposing to carry out Highway improvement works on Grovelands, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 August 2025 and could run through until 6 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 22 Apr 2025 at 09:34.

Scottish Hydro Electric Power Dis logo
Between
5 and 8 Aug 2025
Details
View Map
Share
Pigeon House Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Pigeon House Lane, Church Hanborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 5 August 2025 and run through until 8 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 May 2025 at 12:42.

Thames Water logo
Between
11 and 22 Aug 2025
Details
View Map
Share
Follow
Back Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Back Lane, Eynsham.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 22 August 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 14 Apr 2025 at 13:36.

Scottish Hydro Electric Power Dis logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Church Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Lane, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 May 2025 at 14:33.

Scottish Hydro Electric Power Dis logo
Between
11 and 15 Aug 2025
Details
View Map
Share
Follow
Church Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Church Lane, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 August 2025 and could run through until 15 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 23 May 2025 at 11:24.

Oxfordshire County Council logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Section Of A44 From B4027 To Slape Bridge

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Section Of A44 From B4027 To Slape Bridge, Glympton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 August 2025 and run through until 14 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 3 Jun 2025 at 14:13.

Oxfordshire County Council logo
Between
12 and 14 Aug 2025
Details
View Map
Share
Follow
Section Of A44 From B4027 To Slape Bridge

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Section Of A44 From B4027 To Slape Bridge, Glympton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 August 2025 and could run through until 14 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 3 Jun 2025 at 14:25.

BT logo
Between
13 and 15 Aug 2025
Details
View Map
Share
Swan Lane

BT were proposing to carry out Utility asset works on Swan Lane, Long Hanborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 13 August 2025 and run through until 15 August 2025. The works were due to impact the verge only.

This roadwork event was last updated by BT on 28 May 2025 at 15:46.

Scottish Hydro Electric Power Dis logo
Between
18 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Wilsdon Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wilsdon Way, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 1 Apr 2025 at 08:53.

Scottish Hydro Electric Power Dis logo
Between
18 Aug and 5 Sep 2025
Details
View Map
Share
Wilsdon Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wilsdon Way, Kidlington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Mar 2025 at 16:10.

Thames Water logo
LONG TERM
Between
18 Aug and 24 Nov 2025
Details
View Map
Share
Follow
Cassington Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cassington Road, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 13:38.

Oxfordshire County Council logo
Between
18 Aug and 5 Sep 2025
Details
View Map
Share
Follow
Banbury Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Banbury Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 29 May 2025 at 13:45.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Kidlington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 08:07.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Flemings Road

Thames Water are proposing to carry out New service connection on Flemings Road, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 22 May 2025 at 14:13.

Scottish Hydro Electric Power Dis logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Follow
Pigeon House Lane

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Pigeon House Lane, Church Hanborough.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 29 August 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 2 Jun 2025 at 08:50.

Scottish Hydro Electric Power Dis logo
Between
26 and 29 Aug 2025
Details
View Map
Share
Pigeon House Lane

Scottish Hydro Electric Power Dis were proposing to carry out New service connection on Pigeon House Lane, Church Hanborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 26 August 2025 and run through until 29 August 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 30 May 2025 at 15:55.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Flemings Road

Thames Water are proposing to carry out New service connection on Flemings Road, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:31.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Plane Tree Way

Thames Water are proposing to carry out New service connection on Plane Tree Way, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 22 May 2025 at 14:25.

Thames Water logo
Between
26 and 28 Aug 2025
Details
View Map
Share
Follow
Plane Tree Way

Thames Water are proposing to carry out New service connection on Plane Tree Way, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 28 August 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 16 May 2025 at 10:30.

Oxfordshire County Council logo
Between
30 Aug and 1 Sep 2025
Details
View Map
Share
Follow
Wheatley Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Wheatley Road, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 August 2025 and could run through until 1 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 3 Jun 2025 at 10:11.


Roadworks Map near to The Homestead, WOODSTOCK, OX20 1XA (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Jun 2025 14:01
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to The Homestead, WOODSTOCK, OX20 1XA (4 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Gigaclear logo
OXFORD ROAD 
(0.5 miles)
Gigaclear
Utility asset works - Verge - Multi-way signals
Planned
Scheduled: 4 Jun 2025 - 6 Jun 2025
0.5
Details
Share
Follow
2
Oxfordshire County Council logo
MAJOR
  
UPPER CAMPSFIELD ROAD 
(0.6 miles)
Oxfordshire County Council
Highway improvement works - Carriageway - Road closure
Planned
Scheduled: 1 Jun 2025 - 4 Jun 2025
0.6
Details
Share
Follow
3
Oxfordshire County Council logo
MAJOR
  
UPPER CAMPSFIELD ROAD 
(0.6 miles)
Oxfordshire County Council
Highway improvement works - Carriageway - Road closure
Complete
2 Jun 2025 06:30 - 11:05
0.6
Details
Share
4
Oxfordshire County Council logo
MAJOR
  
PLANE TREE WAY 
(0.9 miles)
Oxfordshire County Council
Highway improvement works - Footway, Carriageway - Some carriageway incursion
Planned
Scheduled: 27 May 2025 - 13 Jun 2025
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.