ROADWORKS SUMMARY
Lewisfield Way, WOODSTOCK, OX20 1DF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Lewisfield Way, OX20 1DF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Lewisfield Way, WOODSTOCK, OX20 1DF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Lewisfield Way are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Southern Gas Networks logo
LONG TERM
Between
28 Feb and 14 Oct 2025
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Long Hanborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 28 February 2025 and could run through until 14 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 08:55.

Oxfordshire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
A40 Cycle Path From Cherwell District Boundary To Wolvercote Roundabout

Oxfordshire County Council are carrying out Highway repair and maintenance works on A40 Cycle Path From Cherwell District Boundary To Wolvercote Roundabout, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 26 March 2025 at 08:00 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

This roadwork event was last updated by Oxfordshire County Council on 3 Jun 2025 at 09:14.

Oxfordshire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
A40 Cycle Path From Cherwell District Boundary To Wolvercote Roundabout

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on A40 Cycle Path From Cherwell District Boundary To Wolvercote Roundabout, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2025 and could run through until 4 September 2025. The works will impact the carriageway and cycleway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 8 Apr 2025 at 10:33.

Thames Water logo
LONG TERM
Until
10 Nov 2025
Details
View Map
Share
Follow
Cassington Road

Thames Water are carrying out Utility repair and maintenance works on Cassington Road, Yarnton.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 25 June 2025 at 00:00 and could run through until 10 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 11:36.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
High Street

Oxfordshire County Council are proposing to carry out Highway improvement works on High Street, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 11:13.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
High Street

Oxfordshire County Council were proposing to carry out Highway improvement works on High Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:16.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Middle Street

Oxfordshire County Council were proposing to carry out Highway improvement works on Middle Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:16.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Middle Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Middle Street, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 11:12.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Kings Head Lane

Oxfordshire County Council were proposing to carry out Highway improvement works on Kings Head Lane, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:15.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Kings Head Lane

Oxfordshire County Council are proposing to carry out Highway improvement works on Kings Head Lane, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 08:03.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
The Walk

Oxfordshire County Council were proposing to carry out Highway improvement works on The Walk, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:15.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
The Walk

Oxfordshire County Council are proposing to carry out Highway improvement works on The Walk, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 08:02.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Lower Street

Oxfordshire County Council were proposing to carry out Highway improvement works on Lower Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:14.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Lower Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Lower Street, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 08:04.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Mill Street

Oxfordshire County Council were proposing to carry out Highway improvement works on Mill Street, Islip.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 14 July 2025 and run through until 7 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 May 2025 at 10:14.

Oxfordshire County Council logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Mill Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Mill Street, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 July 2025 and could run through until 7 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 4 Mar 2025 at 08:01.

Electricity Network Company logo
LONG TERM
Finishing
Sunday
Details
View Map
Share
Follow
Oxford Street

Electricity Network Company are carrying out Utility asset works on Oxford Street, Woodstock.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 08:00 and could run through until 7 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 22 Aug 2025 at 12:30.

Scottish Hydro Electric Power Dis logo
Finishing
Friday
Details
View Map
Share
Wilsdon Way

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Wilsdon Way, Kidlington.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 August 2025 and run through until 5 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Mar 2025 at 16:10.

Thames Water logo
LONG TERM
Between
18 Aug and 24 Nov 2025
Details
View Map
Share
Follow
Cassington Road

Thames Water are proposing to carry out Utility repair and maintenance works on Cassington Road, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 24 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 27 May 2025 at 13:38.

Oxfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Banbury Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Banbury Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Jun 2025 at 15:08.

Oxfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Banbury Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Banbury Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 5 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Jun 2025 at 12:07.

Thames Water logo
Between
19 Aug and 10 Sep 2025
Details
View Map
Share
Woodstock Road

Thames Water were proposing to carry out roadworks on Woodstock Road, Yarnton.

These works were categorised as Major.

The works were not intending to impact the carriageway. However, the works were cancelled.

The works were originally planned to start 19 August 2025 and run through until 10 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 22 Aug 2025 at 11:52.

Scottish Hydro Electric Power Dis logo
Until
19 Sep 2025
Details
View Map
Share
Follow
Thorne Close

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Thorne Close, Kidlington.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 27 August 2025 at 07:50 and could run through until 19 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 27 Aug 2025 at 08:04.

Southern Gas Networks logo
LONG TERM
Between
25 Aug and 14 Nov 2025
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Kidlington.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 14 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 3 Jun 2025 at 08:07.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 3 Oct 2025
Details
View Map
Share
Minor Road From Grove Road To Oxford Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Minor Road From Grove Road To Oxford Road, Bladon.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 3 October 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 09:14.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Hill Rise

Thames Water were proposing to carry out Utility repair and maintenance works on Hill Rise, Woodstock.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 2 September 2025 and run through until 4 September 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Thames Water on 24 Jun 2025 at 14:00.

Electricity Network Company logo
LONG TERM
Until
6 Oct 2025
Details
View Map
Share
Follow
Manor Road

Electricity Network Company are carrying out Utility asset works on Manor Road, Woodstock.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 12:00 and could run through until 6 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 2 Sep 2025 at 12:12.

Electricity Network Company logo
Between
2 and 17 Sep 2025
Details
View Map
Share
Follow
The Causeway

Electricity Network Company are proposing to carry out Utility asset works on The Causeway, Woodstock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 17 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 13 Jun 2025 at 12:36.

Oxfordshire County Council logo
Finishing
Monday
Details
View Map
Share
Follow
Wheatley Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Wheatley Road, Islip.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 September 2025 and could run through until 8 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 11:26.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
8 Sep and 17 Oct 2025
Details
View Map
Share
High Street

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on High Street, Woodstock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 8 September 2025 and run through until 17 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 18 Jul 2025 at 20:28.

Thames Water logo
Between
10 Sep and 1 Oct 2025
Details
View Map
Share
Follow
Woodstock Road

Thames Water are proposing to carry out roadworks on Woodstock Road, Yarnton.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 10 September 2025 and could run through until 1 October 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 3 Sep 2025 at 10:40.

Scottish Hydro Electric Power Dis logo
Between
19 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Wilsdon Way

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Wilsdon Way, Kidlington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 September 2025 and could run through until 13 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Aug 2025 at 08:05.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
22 Sep and 24 Oct 2025
Details
View Map
Share
High Street

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on High Street, Woodstock.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 24 October 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Apr 2025 at 13:06.

Electricity Network Company logo
LONG TERM
Between
23 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Manor Road

Electricity Network Company are proposing to carry out Utility asset works on Manor Road, Woodstock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 13 Jun 2025 at 14:28.

Electricity Network Company logo
LONG TERM
Between
23 Sep and 27 Oct 2025
Details
View Map
Share
Follow
Manor Road

Electricity Network Company are proposing to carry out Utility asset works on Manor Road, Woodstock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 27 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 20 Jun 2025 at 09:30.

Thames Water logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Minor Road From Grove Road To Oxford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Minor Road From Grove Road To Oxford Road, Bladon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 11 Jul 2025 at 12:41.

Thames Water logo
Between
1 and 3 Oct 2025
Details
View Map
Share
Follow
Minor Road From Grove Road To Oxford Road

Thames Water are proposing to carry out Utility repair and maintenance works on Minor Road From Grove Road To Oxford Road, Bladon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 14:18.

Oxfordshire County Council logo
Between
5 and 8 Oct 2025
Details
View Map
Share
Follow
High Street

Oxfordshire County Council are proposing to carry out roadworks on High Street, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 October 2025 and could run through until 8 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 14 Aug 2025 at 08:22.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
13 Oct and 21 Nov 2025
Details
View Map
Share
Follow
High Street

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on High Street, Woodstock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Apr 2025 at 09:08.

Southern Gas Networks logo
Between
20 Oct and 15 Nov 2025
Details
View Map
Share
Follow
Witney Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Witney Road, Long Hanborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 15 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 10:42.

Southern Gas Networks logo
LONG TERM
Between
3 Nov 2025 and 19 Jan 2026
Details
View Map
Share
Follow
Main Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Main Road, Long Hanborough.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 19 January 2026. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 18 Jul 2025 at 10:46.

Oxfordshire County Council logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Plane Tree Way

Oxfordshire County Council are proposing to carry out Section 50 on Plane Tree Way, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 5 Aug 2025 at 13:39.

Oxfordshire County Council logo
Between
3 and 7 Nov 2025
Details
View Map
Share
Follow
Plane Tree Way

Oxfordshire County Council are proposing to carry out Section 50 on Plane Tree Way, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 7 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 11 Aug 2025 at 08:43.

Electricity Network Company logo
Between
3 and 28 Nov 2025
Details
View Map
Share
Follow
The Causeway

Electricity Network Company are proposing to carry out Utility asset works on The Causeway, Woodstock.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 28 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Electricity Network Company on 29 Aug 2025 at 10:44.

Network Rail logo
LONG TERM
Between
8 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Sandy Lane

Network Rail are proposing to carry out Works for Rail Purposes on Sandy Lane, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Mar 2025 at 11:40.

Network Rail logo
LONG TERM
Between
8 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Sandy Lane

Network Rail are proposing to carry out Works for Rail Purposes on Sandy Lane, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 27 Jun 2025 at 10:20.

Network Rail logo
LONG TERM
Between
8 Nov and 14 Dec 2025
Details
View Map
Share
Follow
Sandy Lane

Network Rail are proposing to carry out Works for Rail Purposes on Sandy Lane, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 14 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Feb 2025 at 07:01.

Network Rail logo
Between
8 and 24 Nov 2025
Details
View Map
Share
Follow
Green Lane

Network Rail are proposing to carry out Works for Rail Purposes on Green Lane, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 10 Mar 2025 at 15:58.

Network Rail logo
Between
8 and 24 Nov 2025
Details
View Map
Share
Follow
Green Lane

Network Rail are proposing to carry out Works for Rail Purposes on Green Lane, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 5 Mar 2025 at 08:55.

Network Rail logo
Between
8 and 24 Nov 2025
Details
View Map
Share
Follow
Green Lane

Network Rail are proposing to carry out Works for Rail Purposes on Green Lane, Yarnton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 November 2025 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Network Rail on 25 Feb 2025 at 07:01.

Scottish Hydro Electric Power Dis logo
Between
1 and 6 Dec 2025
Details
View Map
Share
Follow
Flemings Road

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Flemings Road, Woodstock.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 December 2025 and could run through until 6 December 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Aug 2025 at 10:26.

Scottish Hydro Electric Power Dis logo
Between
1 and 19 Dec 2025
Details
View Map
Share
Follow
Footpath Between Wilsdon Way And Chorefields

Scottish Hydro Electric Power Dis are proposing to carry out Utility asset works on Footpath Between Wilsdon Way And Chorefields, Kidlington.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 1 December 2025 and could run through until 19 December 2025. The works will impact the verge and footpath.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 29 Aug 2025 at 10:57.


Roadworks Map near to Lewisfield Way, WOODSTOCK, OX20 1DF (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Lewisfield Way, WOODSTOCK, OX20 1DF (9 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Scottish Hydro Electric Power Dis logo
PLANE TREE WAY 
(0.3 miles)
Scottish Hydro Electric Power Dis
Utility asset works - Footway - Some carriageway incursion
Complete
27 Aug 2025 10:30 - 2 Sep 2025 14:30
0.3
Details
Share
2
Thames Water logo
FLEMINGS ROAD 
(0.3 miles)
Thames Water
New service connection - Footway - Give and take
In Progress
Since: 2 Sep 2025 11:00
(Scheduled: 2 Sep 2025 - 4 Sep 2025)
0.3
Details
Share
Follow
3
Electricity Network Company logo
MAJOR
  
OXFORD STREET 
(0.7 miles)
Electricity Network Company
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 4 Aug 2025 08:00
(Scheduled: 4 Aug 2025 - 7 Sep 2025)
0.7
Details
Share
Follow
4
Thames Water logo
OXFORD STREET 
(0.7 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Multi-way signals
Planned
Scheduled: 3 Sep 2025 - 5 Sep 2025
0.7
Details
Share
Follow
5
Thames Water logo
OXFORD STREET 
(0.8 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Two-way signals
Planned
Scheduled: 3 Sep 2025 - 5 Sep 2025
0.8
Details
Share
Follow
6
Southern Gas Networks logo
MAJOR
  
MINOR ROAD FROM GROVE ROAD TO OXFORD ROAD 
(0.9 miles)
Southern Gas Networks
Utility repair and maintenance works - Carriageway, Verge - Two-way signals
Cancelled
(Scheduled: 1 Sep 2025 - 3 Oct 2025)
0.9
Details
Share
7
Scottish Hydro Electric Power Dis logo
MAJOR
  
PARK STREET 
(0.9 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
Cancelled
(Scheduled: 21 Aug 2025 - 26 Sep 2025)
0.9
Details
Share
8
Electricity Network Company logo
MAJOR
  
THE CAUSEWAY 
(0.9 miles)
Electricity Network Company
Utility asset works - Footway, Carriageway - Multi-way signals
Planned
Scheduled: 2 Sep 2025 - 17 Sep 2025
0.9
Details
Share
Follow
9
Electricity Network Company logo
MAJOR
  
MANOR ROAD 
(0.9 miles)
Electricity Network Company
Utility asset works - Footway, Carriageway - Multi-way signals
In Progress
Since: 2 Sep 2025 12:00
(Scheduled: 2 Sep 2025 - 6 Oct 2025)
0.9
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.