ROADWORKS SUMMARY
Byfield Road, BANBURY, OX17 1TP

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Byfield Road, OX17 1TP and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Byfield Road, BANBURY, OX17 1TP

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Byfield Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
Finishing
Friday
Details
View Map
Share
Follow
Banbury Road Through Wardington

Oxfordshire County Council are carrying out Works for road purposes on Banbury Road Through Wardington, Wardington.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 5 December 2024 at 09:00 and could run through until 20 December 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 6 Dec 2024 at 07:32.

West Northamptonshire Council logo
Between
6 and 10 Jan 2025
Details
View Map
Share
Follow
Warwick Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Warwick Road, Upper Boddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 1 Oct 2024 at 06:20.

Thames Water logo
Between
6 and 31 Jan 2025
Details
View Map
Share
Follow
Southam Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southam Road, Great Bourton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 09:05.

Thames Water logo
LONG TERM
Between
13 Jan and 14 Feb 2025
Details
View Map
Share
Follow
Southam Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southam Road, Great Bourton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 5 Dec 2024 at 11:27.

West Northamptonshire Council logo
Between
13 and 16 Jan 2025
Details
View Map
Share
Follow
Appletree Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Appletree Road, Chipping Warden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 January 2025 and could run through until 16 January 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 17 Sep 2024 at 13:46.

Anglian Water logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Boddington Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Boddington Road, Byfield.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 8 Nov 2024 at 13:57.

Warwickshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Southam Road

Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 24 Oct 2024 at 15:41.

Warwickshire County Council logo
Between
22 and 24 Jan 2025
Details
View Map
Share
Banbury Road

Warwickshire County Council were proposing to carry out Highway improvement works on Banbury Road, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 January 2025 and run through until 24 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 24 Oct 2024 at 15:51.

Anglian Water logo
Between
27 Jan and 19 Feb 2025
Details
View Map
Share
Banbury Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Banbury Road, Thorpe Mandeville.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 19 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 26 Nov 2024 at 10:55.

Anglian Water logo
Between
27 and 29 Jan 2025
Details
View Map
Share
Banbury Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Banbury Road, Thorpe Mandeville.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 January 2025 and run through until 29 January 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Anglian Water on 27 Nov 2024 at 12:50.

Anglian Water logo
Between
3 and 5 Feb 2025
Details
View Map
Share
Follow
Thenford Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Thenford Road, Marston St Lawrence.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 February 2025 and could run through until 5 February 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Anglian Water on 31 Oct 2024 at 07:51.

Thames Water logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Chapel Lane, Little Bourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:17.

Thames Water logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Southam Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Southam Road, Little Bourton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 08:08.

Warwickshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Southam Road

Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 20 Nov 2024 at 09:10.

Warwickshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Banbury Road

Warwickshire County Council were proposing to carry out Highway improvement works on Banbury Road, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 20 Nov 2024 at 09:10.

Thames Water logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Chapel Lane, Little Bourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:28.

Thames Water logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Chapel Lane, Little Bourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 11:26.

Thames Water logo
LONG TERM
Between
17 Feb and 21 Mar 2025
Details
View Map
Share
Follow
Southam Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southam Road, Little Bourton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 21 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 14:26.

West Northamptonshire Council logo
Between
24 and 28 Feb 2025
Details
View Map
Share
Follow
Townsend Lane

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Townsend Lane, Upper Boddington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 28 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 20 Nov 2024 at 12:20.

Anglian Water logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Banbury Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Banbury Road, Thorpe Mandeville.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 28 Nov 2024 at 05:29.

Oxfordshire County Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Street From Banbury To Williamscot

Oxfordshire County Council were proposing to carry out Highway improvement works on Street From Banbury To Williamscot, Banbury.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 8 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 5 Dec 2024 at 08:27.

Oxfordshire County Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Street From Banbury To Williamscot

Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Banbury To Williamscot, Banbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 13 Dec 2024 at 09:55.

Oxfordshire County Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Street From Banbury To Williamscot

Oxfordshire County Council are proposing to carry out Highway improvement works on Street From Banbury To Williamscot, Banbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 13 Dec 2024 at 10:02.

Oxfordshire County Council logo
Between
24 Feb and 7 Mar 2025
Details
View Map
Share
Street From Banbury To Williamscot

Oxfordshire County Council were proposing to carry out Highway improvement works on Street From Banbury To Williamscot, Banbury.

These works were categorised as Major.

A lane was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 February 2025 and run through until 7 March 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Dec 2024 at 16:02.

Oxfordshire County Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Unnamed A422 Dual Carriageway 6811289

Oxfordshire County Council are proposing to carry out Highway improvement works on Unnamed A422 Dual Carriageway 6811289, Banbury.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 10 Dec 2024 at 14:09.

Oxfordshire County Council logo
Between
24 Feb and 8 Mar 2025
Details
View Map
Share
Follow
Part Of A422 Through Banbury

Oxfordshire County Council are proposing to carry out Highway improvement works on Part Of A422 Through Banbury, Banbury.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 13 Dec 2024 at 10:01.

West Northamptonshire Council logo
Between
2 and 6 Mar 2025
Details
View Map
Share
Follow
Appletree Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Appletree Road, Chipping Warden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 4 Dec 2024 at 08:07.

Anglian Water logo
Between
3 and 5 Mar 2025
Details
View Map
Share
Follow
Farndon Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Farndon Road, Chipping Warden.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 5 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 26 Nov 2024 at 12:57.

West Northamptonshire Council logo
Between
3 and 8 Mar 2025
Details
View Map
Share
Follow
A422 Middleton Cheney Bypass

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on A422 Middleton Cheney Bypass, Middleton Cheney.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 March 2025 and could run through until 8 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 16 Oct 2024 at 06:10.

Anglian Water logo
Between
4 and 6 Mar 2025
Details
View Map
Share
Follow
Townsend

Anglian Water are proposing to carry out Utility repair and maintenance works on Townsend, Woodford Halse.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 4 March 2025 and could run through until 6 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by Anglian Water on 29 Nov 2024 at 10:59.

Anglian Water logo
Between
10 and 12 Mar 2025
Details
View Map
Share
Follow
Middleton Road

Anglian Water are proposing to carry out Utility repair and maintenance works on Middleton Road, Chacombe.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 12 March 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Anglian Water on 26 Nov 2024 at 06:49.

West Northamptonshire Council logo
Between
10 and 14 Mar 2025
Details
View Map
Share
Follow
Culworth Road

West Northamptonshire Council are proposing to carry out Highway repair and maintenance works on Culworth Road, Eydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 March 2025 and could run through until 14 March 2025. The works will impact the carriageway only.

This roadwork event was last updated by West Northamptonshire Council on 13 Dec 2024 at 11:24.


Roadworks Map near to Byfield Road, BANBURY, OX17 1TP

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 18 Dec 2024 07:00
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Byfield Road, BANBURY, OX17 1TP (10 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
HS2 logo
FOOTPATH AA7 APPLETREE LANE SE VIA OLD AIRFIELD TO CHIPPING WARDEN PARISH BOUNDARY 
(0.1 miles)
HS2
Works for Rail Purposes - Footpath - No carriageway incursion
Planned
Scheduled: 29 Mar 2021 - 31 Mar 2025
0.1
Details
Share
Follow
2
HS2 logo
BYFIELD ROAD 
(0.1 miles)
HS2
Works for Rail Purposes - Verge - No carriageway incursion
In Progress
Since: 18 Mar 2022 08:00
(Scheduled: 18 Mar 2022 - 19 Dec 2026)
0.1
Details
Share
Follow
3
HS2 logo
BYFIELD ROAD 
(0.2 miles)
HS2
Works for Rail Purposes - Carriageway, Verge - No carriageway incursion
In Progress
Since: 4 Jan 2022 08:00
(Scheduled: 4 Jan 2022 - 31 May 2025)
0.2
Details
Share
Follow
4
HS2 logo
FOOTPATH AE20 BYFIELD ROAD ADJACENT PRIMARY SCHOOL E THENCE S TO CULWORTH ROAD 
(0.2 miles)
HS2
Works for Rail Purposes - Footpath - No carriageway incursion
Planned
Scheduled: 20 Apr 2022 - 30 Apr 2025
0.2
Details
Share
Follow
5
Southern Gas Networks logo
EMERGENCY
  
BANBURY ROAD 
(0.2 miles)
Southern Gas Networks
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 16 Dec 2024 21:56
(Scheduled: 16 Dec 2024 - 24 Dec 2024)
0.2
Details
Share
Follow
6
HS2 logo
FOOTPATH AE16 BYFIELD ROAD NE VIA OLD CLAY PIT TO FARNDON ROAD 
(0.3 miles)
HS2
Works for Rail Purposes - Footpath - No carriageway incursion
Planned
Scheduled: 26 Jan 2022 - 30 May 2025
0.3
Details
Share
Follow
7
HS2 logo
BYFIELD ROAD 
(0.4 miles)
HS2
Works for Rail Purposes - Carriageway, Verge - Multi-way signals
In Progress
Since: 8 Aug 2022 07:00
(Scheduled: 8 Aug 2022 - 31 Dec 2024)
0.4
Details
Share
Follow
8
HS2 logo
FOOTPATH AE28 CULWORTH ROAD NE TO JUNCTION WITH AE12 OF CALVES CLOSE SPINNEY 
(0.5 miles)
HS2
Works for Rail Purposes - Footpath - No carriageway incursion
In Progress
Since: 1 Mar 2023 08:00
(Scheduled: 1 Mar 2023 - 24 Dec 2025)
0.5
Details
Share
Follow
9
HS2 logo
CULWORTH ROAD 
(0.7 miles)
HS2
Works for Rail Purposes - Carriageway, Verge - Multi-way signals
In Progress
Since: 5 Sep 2022 09:00
(Scheduled: 5 Sep 2022 - 20 Dec 2025)
0.7
Details
Share
Follow
10
HS2 logo
APPLETREE LANE, APPLETREE 
(1.0 miles)
HS2
Works for Rail Purposes - Carriageway - Road closure
In Progress
Since: 13 Apr 2021 09:00
(Scheduled: 13 Apr 2021 - 20 Dec 2025)
1.0
Details
Share
Follow