ROADWORKS SUMMARY
Warmington, BANBURY, OX17 1DF

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for OX17 1DF and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Warmington, BANBURY, OX17 1DF

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Thames Water logo
LONG TERM
Between
18 Dec 2023 and 31 Jul 2025
Details
View Map
Share
The Plain Road

Thames Water were proposing to carry out Utility asset works on The Plain Road, Shutford.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 18 December 2023 and run through until 31 July 2025. The works were due to impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 7 Jan 2025 at 11:06.

Oxfordshire County Council logo
LONG TERM
Until
22 Mar 2025
Details
View Map
Share
Follow
Dukes Meadow Drive

Oxfordshire County Council are carrying out Highway improvement works on Dukes Meadow Drive, Banbury.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 13 November 2024 at 08:00 and could run through until 22 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 30 Jan 2025 at 11:56.

Thames Water logo
Finishing
Today
Details
View Map
Share
Follow
Southam Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southam Road, Great Bourton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 31 January 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 27 Nov 2024 at 09:05.

Thames Water logo
LONG TERM
Until
14 Feb 2025
Details
View Map
Share
Follow
Southam Road

Thames Water are carrying out Disconnection or alteration of supply on Southam Road, Great Bourton.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 15 January 2025 at 09:20 and could run through until 14 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 15 Jan 2025 at 09:33.

Severn Trent Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
The Slade

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Slade, Fenny Compton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 18 Nov 2024 at 14:53.

Severn Trent Water logo
Between
5 and 7 Feb 2025
Details
View Map
Share
Follow
The Slade

Severn Trent Water are proposing to carry out Utility repair and maintenance works on The Slade, Fenny Compton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 February 2025 and could run through until 7 February 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 5 Nov 2024 at 14:33.

Thames Water logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Southam Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southam Road, Little Bourton.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 29 Jan 2025 at 14:02.

Thames Water logo
LONG TERM
Between
10 Feb and 14 Mar 2025
Details
View Map
Share
Southam Road

Thames Water were proposing to carry out Disconnection or alteration of supply on Southam Road, Little Bourton.

These works were categorised as Major.

Two-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 10 February 2025 and run through until 14 March 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 28 Nov 2024 at 08:08.

Thames Water logo
Between
10 Feb and 7 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Chapel Lane, Little Bourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 February 2025 and could run through until 7 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Nov 2024 at 10:17.

Warwickshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Southam Road

Warwickshire County Council were proposing to carry out Highway improvement works on Southam Road, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 20 Nov 2024 at 09:10.

Warwickshire County Council logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Banbury Road

Warwickshire County Council were proposing to carry out Highway improvement works on Banbury Road, Farnborough.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 12 February 2025 and run through until 14 February 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Warwickshire County Council on 20 Nov 2024 at 09:10.

Severn Trent Water logo
Between
12 and 14 Feb 2025
Details
View Map
Share
Follow
Kineton Road

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Kineton Road, Gaydon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 12 February 2025 and could run through until 14 February 2025. The works will impact the carriageway only.

This roadwork event was last updated by Severn Trent Water on 20 Nov 2024 at 12:23.

Severn Trent Water logo
Between
17 and 21 Feb 2025
Details
View Map
Share
Quarry Road

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Quarry Road, Hornton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 17 February 2025 and run through until 21 February 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 26 Nov 2024 at 12:40.

Thames Water logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Chapel Lane, Little Bourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Dec 2024 at 15:28.

Thames Water logo
Between
17 Feb and 14 Mar 2025
Details
View Map
Share
Follow
Chapel Lane

Thames Water are proposing to carry out Disconnection or alteration of supply on Chapel Lane, Little Bourton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 February 2025 and could run through until 14 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 9 Dec 2024 at 11:26.

National Highways logo
Between
24 and 26 Feb 2025
Details
View Map
Share
Follow
Dassett Road

National Highways are proposing to carry out Highway improvement works on Dassett Road, Avon Dassett.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 February 2025 and could run through until 26 February 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 17 Jan 2025 at 11:11.

Gigaclear logo
LONG TERM
Between
26 Feb and 29 Mar 2025
Details
View Map
Share
Follow
Main Street

Gigaclear are proposing to carry out Utility asset works on Main Street, Hanwell.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 February 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Jan 2025 at 14:49.

Gigaclear logo
Between
24 Mar and 18 Apr 2025
Details
View Map
Share
Hornton Lane

Gigaclear were proposing to carry out Utility asset works on Hornton Lane, Horley.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 Jan 2025 at 11:36.

Gigaclear logo
Between
24 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Street From Hornton To Bush Hill

Gigaclear are proposing to carry out Utility asset works on Street From Hornton To Bush Hill, Hornton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 Jan 2025 at 11:38.

Gigaclear logo
Between
24 Mar and 18 Apr 2025
Details
View Map
Share
Street From Hornton To Bush Hill

Gigaclear were proposing to carry out Utility asset works on Street From Hornton To Bush Hill, Hornton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 March 2025 and run through until 18 April 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 Jan 2025 at 11:38.

Gigaclear logo
Between
24 Mar and 18 Apr 2025
Details
View Map
Share
Follow
Hornton Lane

Gigaclear are proposing to carry out Utility asset works on Hornton Lane, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 18 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 Jan 2025 at 11:37.

Gigaclear logo
Between
24 and 29 Mar 2025
Details
View Map
Share
Follow
Church Lane

Gigaclear are proposing to carry out Utility asset works on Church Lane, Hanwell.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 29 March 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 28 Jan 2025 at 14:39.

Thames Water logo
LONG TERM
Between
24 Mar and 28 Apr 2025
Details
View Map
Share
Follow
Southam Road

Thames Water are proposing to carry out Disconnection or alteration of supply on Southam Road, Banbury.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 March 2025 and could run through until 28 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 6 Dec 2024 at 12:27.

Gigaclear logo
Between
25 Mar and 7 Apr 2025
Details
View Map
Share
Follow
School Lane

Gigaclear are proposing to carry out Utility asset works on School Lane, North Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 17 Jan 2025 at 09:55.

Gigaclear logo
Between
25 Mar and 7 Apr 2025
Details
View Map
Share
Follow
School Lane

Gigaclear are proposing to carry out Utility asset works on School Lane, North Newington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 7 April 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 28 Jan 2025 at 11:40.

Severn Trent Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Follow
Station Fields

Severn Trent Water are proposing to carry out Utility repair and maintenance works on Station Fields, Fenny Compton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 April 2025 and could run through until 17 April 2025. The works will impact the verge only.

This roadwork event was last updated by Severn Trent Water on 28 Oct 2024 at 11:31.

Severn Trent Water logo
Between
15 and 17 Apr 2025
Details
View Map
Share
Station Fields

Severn Trent Water were proposing to carry out Utility repair and maintenance works on Station Fields, Fenny Compton.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 April 2025 and run through until 17 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by Severn Trent Water on 13 Dec 2024 at 14:23.

Gigaclear logo
Between
18 Apr and 1 May 2025
Details
View Map
Share
Follow
Little Lane

Gigaclear are proposing to carry out Utility asset works on Little Lane, Horley.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 April 2025 and could run through until 1 May 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Gigaclear on 24 Jan 2025 at 15:38.

Gigaclear logo
Between
21 Apr and 3 May 2025
Details
View Map
Share
Follow
The Green

Gigaclear are proposing to carry out Utility asset works on The Green, Hornton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 3 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Jan 2025 at 14:23.

Gigaclear logo
Between
21 Apr and 3 May 2025
Details
View Map
Share
Follow
Eastgate

Gigaclear are proposing to carry out Utility asset works on Eastgate, Hornton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 3 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 30 Jan 2025 at 14:21.

Gigaclear logo
Between
21 Apr and 2 May 2025
Details
View Map
Share
Follow
Street From Bell Street To Balscote

Gigaclear are proposing to carry out Core Sampling on Street From Bell Street To Balscote, Hornton.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 April 2025 and could run through until 2 May 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Gigaclear on 27 Jan 2025 at 16:05.

Western Power Distribution (West Midlands) logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Street From Shenington Road To Sugarswell Lane

Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Street From Shenington Road To Sugarswell Lane, Shenington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 Jan 2025 at 09:43.

Western Power Distribution (West Midlands) logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Street From Shenington Road To Sugarswell Lane

Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Street From Shenington Road To Sugarswell Lane, Shenington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 Jan 2025 at 08:55.

Western Power Distribution (West Midlands) logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Rattlecombe Road

Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Rattlecombe Road, Shenington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 Jan 2025 at 09:54.

Western Power Distribution (West Midlands) logo
Between
28 Apr and 2 May 2025
Details
View Map
Share
Follow
Rattlecombe Road

Western Power Distribution (West Midlands) are proposing to carry out Remedial works on Rattlecombe Road, Shenington.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 April 2025 and could run through until 2 May 2025. The works will impact the carriageway only.

This roadwork event was last updated by Western Power Distribution (West Midlands) on 27 Jan 2025 at 08:56.

Anglian Water logo
Between
28 and 30 Apr 2025
Details
View Map
Share
Banbury Road

Anglian Water were proposing to carry out Utility repair and maintenance works on Banbury Road, Boddington.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 28 April 2025 and run through until 30 April 2025. The works were due to impact the verge only.

This roadwork event was last updated by Anglian Water on 29 Jan 2025 at 09:44.


Roadworks Map near to Warmington, BANBURY, OX17 1DF

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 31 Jan 2025 08:02
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Warmington, BANBURY, OX17 1DF (0 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)

Contains public sector information licensed under the Open Government Licence v3.0.