ROADWORKS SUMMARY
Wallace Close, ABINGDON, OX14 5LL

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Wallace Close, OX14 5LL and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Major Roadworks near to Wallace Close, ABINGDON, OX14 5LL

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Wallace Close are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Between
9 Jan 2023 and 9 Jul 2024
Details
View Map
Share
Follow
Grenoble Road

Oxfordshire County Council are proposing to carry out roadworks on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 January 2023 and could run through until 9 July 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 16 Dec 2022 at 10:24.

Oxfordshire County Council logo
LONG TERM
Between
3 Sep 2023 and 30 Mar 2027
Details
View Map
Share
Follow
Kennington Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Kennington Roundabout, Oxford.

These works are categorised as Major.

The works will start on or after 3 September 2023 and could run through until 30 March 2027. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 25 Oct 2022 at 10:34.

Thames Water logo
LONG TERM
Until
19 Jul 2024
Details
View Map
Share
Follow
Grenoble Road

Thames Water are carrying out Utility asset works on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 19 February 2024 at 08:17 and could run through until 19 July 2024. The works will impact the carriageway and verge.

This roadwork event was last updated by Thames Water on 19 Feb 2024 at 09:00.

Oxfordshire County Council logo
LONG TERM
Between
25 Mar and 26 May 2024
Details
View Map
Share
Follow
Broad Street

Oxfordshire County Council are proposing to carry out Works for road purposes on Broad Street, Abingdon.

These works are categorised as Major.

A lane will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2024 and could run through until 26 May 2024. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 22 Mar 2024 at 08:55.

Oxfordshire County Council logo
LONG TERM
Between
26 Mar and 10 Jun 2024
Details
View Map
Share
Follow
Marcham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Marcham Road, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 March 2024 and could run through until 10 June 2024. The works will impact the carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 27 Feb 2024 at 10:03.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Follow
Bury Street

Thames Water are carrying out Utility repair and maintenance works on Bury Street, Abingdon.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 15 April 2024 at 12:00 and could run through until 30 April 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 09:10.

Oxfordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Steventon Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Apr 2024 at 11:05.

Oxfordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Steventon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Road, Drayton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Apr 2024 at 11:07.

Netomnia logo
Finishing
Wednesday
Details
View Map
Share
Follow
School Lane

Netomnia are proposing to carry out Utility asset works on School Lane, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Netomnia on 29 Jan 2024 at 12:16.

Netomnia logo
Finishing
Wednesday
Details
View Map
Share
Follow
Old Moor

Netomnia are proposing to carry out Utility asset works on Old Moor, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Netomnia on 29 Jan 2024 at 12:14.

Oxfordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Abingdon Road, Steventon, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Apr 2024 at 11:06.

Oxfordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
High Street

Oxfordshire County Council are proposing to carry out Highway improvement works on High Street, Steventon, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Apr 2024 at 11:05.

Oxfordshire County Council logo
Finishing
Wednesday
Details
View Map
Share
Follow
The Green

Oxfordshire County Council are proposing to carry out Highway improvement works on The Green, Drayton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 April 2024 and could run through until 1 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Apr 2024 at 11:04.

Thames Water logo
Between
30 Apr and 21 May 2024
Details
View Map
Share
Follow
Kennington Road

Thames Water are proposing to carry out Utility asset works on Kennington Road, Kennington, Oxford.

These works are categorised as Major.

The works are not expected to impact the carriageway.

The works will start on or after 30 April 2024 and could run through until 21 May 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 24 Apr 2024 at 13:32.

Oxfordshire County Council logo
Between
11 and 14 May 2024
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Oxford Road, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 24 Apr 2024 at 12:58.

Oxfordshire County Council logo
Between
11 and 14 May 2024
Details
View Map
Share
Follow
Frilford Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Frilford Road, Marcham, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 11 May 2024 and could run through until 14 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Apr 2024 at 11:12.

Southern Gas Networks logo
Between
12 and 30 May 2024
Details
View Map
Share
Follow
Brook Drive

Southern Gas Networks are proposing to carry out New service connection on Brook Drive, Milton, Abingdon.

These works are categorised as Major.

The works will start on or after 12 May 2024 and could run through until 30 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 17 Apr 2024 at 10:25.

Oxfordshire County Council logo
Between
19 and 21 May 2024
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Oxford Road, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 19 May 2024 and could run through until 21 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 25 Apr 2024 at 09:31.

Southern Gas Networks logo
LONG TERM
Between
26 May and 11 Jul 2024
Details
View Map
Share
Follow
Didcot A4130 Perimeter Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Didcot A4130 Perimeter Road, Didcot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 26 May 2024 and could run through until 11 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Apr 2024 at 17:42.

Oxfordshire County Council logo
Between
27 and 31 May 2024
Details
View Map
Share
Follow
Old Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Old Abingdon Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 28 Mar 2024 at 12:18.

BT logo
Between
27 and 31 May 2024
Details
View Map
Share
Follow
Barrow Road

BT are proposing to carry out Utility repair and maintenance works on Barrow Road, Shippon, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 May 2024 and could run through until 31 May 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 25 Jan 2024 at 12:21.

Oxfordshire County Council logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Blenheim Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Blenheim Hill, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 15 Mar 2024 at 15:10.

Oxfordshire County Council logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Burr Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Burr Street, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 15 Mar 2024 at 15:09.

Oxfordshire County Council logo
Between
28 and 30 May 2024
Details
View Map
Share
Follow
Didcot Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot Road, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 May 2024 and could run through until 30 May 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 15 Mar 2024 at 15:09.

Oxfordshire County Council logo
Between
29 May and 1 Jun 2024
Details
View Map
Share
Follow
Section Of A417 Between Main Street West Hagbourne And Vowh Boundary Northwards

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A417 Between Main Street West Hagbourne And Vowh Boundary Northwards, West Hagbourne, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Mar 2024 at 16:28.

Oxfordshire County Council logo
Between
29 May and 1 Jun 2024
Details
View Map
Share
Follow
Reading Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Reading Road, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Mar 2024 at 13:38.

Oxfordshire County Council logo
Between
30 May and 1 Jun 2024
Details
View Map
Share
Follow
Lady Grove

Oxfordshire County Council are proposing to carry out Highway improvement works on Lady Grove, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 30 May 2024 and could run through until 1 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Apr 2024 at 09:48.

Oxfordshire County Council logo
Between
2 and 4 Jun 2024
Details
View Map
Share
Follow
Marcham Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Marcham Road, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 29 Feb 2024 at 13:39.

Oxfordshire County Council logo
Between
2 and 4 Jun 2024
Details
View Map
Share
Follow
Frilford Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Frilford Road, Marcham, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2024 and could run through until 4 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 26 Apr 2024 at 15:03.

Oxfordshire County Council logo
Between
3 and 5 Jun 2024
Details
View Map
Share
Follow
Section Of A417 Between Main Street West Hagbourne And Vowh Boundary Northwards

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A417 Between Main Street West Hagbourne And Vowh Boundary Northwards, West Hagbourne, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 29 Feb 2024 at 15:33.

Oxfordshire County Council logo
Between
3 and 5 Jun 2024
Details
View Map
Share
Follow
Reading Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Reading Road, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 29 Feb 2024 at 15:14.

Oxfordshire County Council logo
Between
3 and 5 Jun 2024
Details
View Map
Share
Follow
Didcot Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Didcot Road, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 29 Feb 2024 at 15:02.

Oxfordshire County Council logo
Between
3 and 5 Jun 2024
Details
View Map
Share
Follow
Blenheim Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Blenheim Hill, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 29 Feb 2024 at 14:27.

Oxfordshire County Council logo
Between
3 and 5 Jun 2024
Details
View Map
Share
Follow
Burr Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Burr Street, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 June 2024 and could run through until 5 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 29 Feb 2024 at 14:07.

Thames Water logo
Between
17 and 19 Jun 2024
Details
View Map
Share
Follow
Penlon Place

Thames Water are proposing to carry out Utility repair and maintenance works on Penlon Place, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 19 June 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 10:45.

Southern Gas Networks logo
LONG TERM
Between
17 Jun and 20 Sep 2024
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 17 June 2024 and could run through until 20 September 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jan 2024 at 12:47.

Southern Gas Networks logo
Between
18 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Drayton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Drayton Road, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 5 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Mar 2024 at 14:53.

Southern Gas Networks logo
Between
18 Jun and 5 Jul 2024
Details
View Map
Share
Follow
Gainsborough Green

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Gainsborough Green, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 June 2024 and could run through until 5 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 22 Mar 2024 at 14:52.

Thames Water logo
Between
23 Jun and 8 Jul 2024
Details
View Map
Share
Follow
Didcot A4130 Perimeter Road

Thames Water are proposing to carry out New service connection on Didcot A4130 Perimeter Road, Didcot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 23 June 2024 and could run through until 8 July 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 26 Apr 2024 at 12:26.

Thames Water logo
Between
25 and 27 Jun 2024
Details
View Map
Share
Follow
Bayworth Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Bayworth Lane, Boars Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 June 2024 and could run through until 27 June 2024. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 4 Mar 2024 at 10:19.

Southern Gas Networks logo
LONG TERM
Between
30 Jun and 8 Aug 2024
Details
View Map
Share
Follow
Oxford Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Oxford Road, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 30 June 2024 and could run through until 8 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Apr 2024 at 11:08.

National Highways logo
LONG TERM
Between
1 Jul and 31 Aug 2024
Details
View Map
Share
Follow
Oxford Road

National Highways are proposing to carry out Highway repair and maintenance works on Oxford Road, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 July 2024 and could run through until 31 August 2024. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by National Highways on 23 Apr 2024 at 13:25.

Thames Water logo
Between
7 and 11 Jul 2024
Details
View Map
Share
Follow
Hagbourne Road

Thames Water are proposing to carry out New service connection on Hagbourne Road, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2024 and could run through until 11 July 2024. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 11 Apr 2024 at 12:58.

Thames Water logo
Between
18 and 22 Jul 2024
Details
View Map
Share
Follow
Grove Road

Thames Water are proposing to carry out Utility repair and maintenance works on Grove Road, Harwell, Didcot.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 18 July 2024 and could run through until 22 July 2024. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 18 Apr 2024 at 13:04.

Oxfordshire County Council logo
LONG TERM
Between
22 Jul and 12 Sep 2024
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Oxford Road, East Hanney, Wantage.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 12 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 24 Apr 2024 at 12:58.

Oxfordshire County Council logo
LONG TERM
Between
22 Jul and 12 Sep 2024
Details
View Map
Share
Follow
Wantage Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Wantage Road, Frilford, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 22 July 2024 and could run through until 12 September 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 24 Apr 2024 at 12:46.

Oxfordshire County Council logo
Between
26 Jul and 2 Aug 2024
Details
View Map
Share
Follow
The Avenue

Oxfordshire County Council are proposing to carry out Highway improvement works on The Avenue, Kennington, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 July 2024 and could run through until 2 August 2024. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 18 Apr 2024 at 10:26.


Roadworks Map near to Wallace Close, ABINGDON, OX14 5LL

Colour Codes
Planned
In Progress
Completed
Cancelled
Last Updated: 29 Apr 2024 03:19
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Wallace Close, ABINGDON, OX14 5LL (14 Events)

Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
BT logo
DRAYTON ROAD 
(0.5 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 29 Apr 2024 - 1 May 2024
0.5
Details
Share
Follow
2
BT logo
DRAYTON ROAD 
(0.6 miles)
BT
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 29 Apr 2024 - 1 May 2024
0.6
Details
Share
Follow
3
Scottish Hydro Electric Power Dis logo
URGENT
  
MILL ROAD 
(0.6 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway, Carriageway - Some carriageway incursion
In Progress
Since: 25 Apr 2024 09:28
(Scheduled: 25 Apr 2024 - 30 Apr 2024)
0.6
Details
Share
Follow
4
Thames Water logo
URGENT
  
HIGH STREET 
(0.7 miles)
Thames Water
Utility repair and maintenance works - Footway - Lane closure
In Progress
Since: 27 Apr 2024 18:41
(Scheduled: 27 Apr 2024 - 1 May 2024)
0.7
Details
Share
Follow
5
Virgin Media logo
MARCHAM ROAD 
(0.7 miles)
Virgin Media
Utility asset works - Footway, Verge - No carriageway incursion
Planned
Scheduled: 29 Apr 2024 - 1 May 2024
0.7
Details
Share
Follow
6
Oxfordshire County Council logo
FOOTPATH BETWEEN STERT STREET AND ABBEY CLOSE 
(0.7 miles)
Oxfordshire County Council
Highway repair and maintenance works - Footway - No carriageway incursion
Planned
Scheduled: 25 Apr 2024 - 8 May 2024
0.7
Details
Share
Follow
7
Thames Water logo
URGENT
  
BURY STREET 
(0.7 miles)
Thames Water
Utility repair and maintenance works - Footway, Carriageway - Give and take
In Progress
Since: 15 Apr 2024 12:00
(Scheduled: 15 Apr 2024 - 30 Apr 2024)
0.7
Details
Share
Follow
8
Oxfordshire County Council logo
MAJOR
  
STERT STREET 
(0.7 miles)
Oxfordshire County Council
Highway repair and maintenance works - Footway - No carriageway incursion
In Progress
Since: 19 Apr 2024 11:00
(Scheduled: 19 Apr 2024 - 10 May 2024)
0.7
Details
Share
Follow
9
Thames Water logo
SPRING ROAD 
(0.7 miles)
Thames Water
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 29 Apr 2024 - 1 May 2024
0.7
Details
Share
Follow
10
Oxfordshire County Council logo
MAJOR
  
STERT STREET 
(0.8 miles)
Oxfordshire County Council
Highway repair and maintenance works - Carriageway - No carriageway incursion
In Progress
Since: 25 Mar 2024 07:00
(Scheduled: 25 Mar 2024 - 2 Jun 2024)
0.8
Details
Share
Follow

Contains public sector information licensed under the Open Government Licence v3.0.