ROADWORKS SUMMARY
Thesiger Road, ABINGDON, OX14 2DX

Introduction

Image of petrol pumps

View current and future planned roadworks and road closures for Thesiger Road, OX14 2DX and the surrounding area.

Our roadwork details are constantly updated and reflect the current situation and we offer both a map view and a listing. We also highlight the major and significant roadworks occuring near to you help you avoid the worst of the delays to your journey.

The roadworks shown below show all current and proposed works during the next 90 days and historical data is recorded since July 2020.

Please note that we re-publish this data and cannot provide any additional information pertaining to a roadwork event. If you require more information, please contact the organisation carrying out the work.

Data are provided by the Department for Transport.

Have we helped today?

If we have helped you today, please consider buying us a quick coffee to keep us going!

Transport for London Traffic cameras are currently unavailable whilst TfL resolve a data security issue.

Major Roadworks near to Thesiger Road, ABINGDON, OX14 2DX

Details of major roadworks, currently in progress or starting soon and resulting in road closures and/or traffic signal management for Thesiger Road are shown here covering a 5 mile radius. See further down for details of all roadworks in your area.

New Alerting Facility

We are pleased to announce our free new alerting faciity that will automatically notify you whenever there are future updates to a roadwork event that affects you.

Simply click on the Follow button to opt in and of course, you may cancel them at any time.

Please note that any Follow request only relates to that specific roadwork event and not to any other roadworks at that location.

Click to Dismiss

Oxfordshire County Council logo
LONG TERM
Between
3 Sep 2023 and 30 Mar 2027
Details
View Map
Share
Follow
Kennington Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Kennington Roundabout, Oxford.

These works are categorised as Major.

The works will start on or after 3 September 2023 and could run through until 30 March 2027. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 25 Oct 2022 at 09:34.

Oxfordshire County Council logo
LONG TERM
Between
9 Sep 2024 and 30 May 2029
Details
View Map
Share
Follow
Section Of Southern Bypass Between Hinksey Hill Roundabout And Kennington Roundabout

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of Southern Bypass Between Hinksey Hill Roundabout And Kennington Roundabout, South Hinksey, Oxford.

These works are categorised as Major.

The works will start on or after 9 September 2024 and could run through until 30 May 2029. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 6 Mar 2024 at 09:44.

Oxfordshire County Council logo
LONG TERM
Between
5 Jan and 1 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 5 January 2025 and could run through until 1 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Oxfordshire County Council logo
LONG TERM
Between
6 Jan and 10 Nov 2025
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Section 58 on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 January 2025 and could run through until 10 November 2025. The works will impact the footway, carriageway, verge, cycleway and footpath.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 23 Oct 2024 at 11:14.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Milton Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Milton Hill, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 21 Nov 2024 at 11:21.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Steventon Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Steventon Hill, Steventon, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Section Of A4130 Between Milton Interchange And Abingdon Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4130 Between Milton Interchange And Abingdon Road, Milton, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:55.

Oxfordshire County Council logo
LONG TERM
Between
27 Jan 2025 and 27 Mar 2026
Details
View Map
Share
Follow
Trenchard Avenue

Oxfordshire County Council are proposing to carry out Highway improvement works on Trenchard Avenue, Milton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 January 2025 and could run through until 27 March 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 20 Nov 2024 at 11:57.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 2 Oct 2025
Details
View Map
Share
Follow
Landseer Walk

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Landseer Walk, Abingdon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 3 March 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 3 Mar 2025 at 11:14.

Southern Gas Networks logo
LONG TERM
Between
3 Mar and 2 Oct 2025
Details
View Map
Share
Landseer Walk

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Landseer Walk, Abingdon.

These works were categorised as Major.

There were no traffic signals or road closures necessary for these works and traffic would have operated on a give-and-take basis. However, the works were cancelled.

The works were originally planned to start 3 March 2025 and run through until 2 October 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 10 Mar 2025 at 09:31.

Oxfordshire County Council logo
LONG TERM
Between
25 Mar 2025 and 1 Jun 2026
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Oxford Road, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 25 March 2025 and could run through until 1 June 2026. The works will impact the carriageway only.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 6 Feb 2025 at 13:13.

Oxfordshire County Council logo
LONG TERM
Until
1 Jun 2026
Details
View Map
Share
Follow
Oxford Road

Oxfordshire County Council are carrying out Highway repair and maintenance works on Oxford Road, Abingdon.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 March 2025 at 07:00 and could run through until 1 June 2026. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Apr 2025 at 09:11.

Oxfordshire County Council logo
LONG TERM
Finishing
Tomorrow
Details
View Map
Share
Follow
Knights Road

Oxfordshire County Council are carrying out Highway improvement works on Knights Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 14 April 2025 at 08:00 and could run through until 4 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Jul 2025 at 09:55.

Southern Gas Networks logo
LONG TERM
Between
2 Jun and 14 Dec 2025
Details
View Map
Share
Follow
Grenoble Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 June 2025 and could run through until 14 December 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 08:32.

Southern Gas Networks logo
LONG TERM
Until
24 Dec 2025
Details
View Map
Share
Follow
Grenoble Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 25 June 2025 at 12:50 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 25 Jun 2025 at 13:03.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Courtland Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Courtland Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 16 May 2025 at 11:13.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Westbury Crescent

Oxfordshire County Council are proposing to carry out Highway improvement works on Westbury Crescent, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 16 May 2025 at 11:12.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Iffley Turn

Oxfordshire County Council are proposing to carry out Highway improvement works on Iffley Turn, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 16 May 2025 at 11:14.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Rose Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Rose Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 9 May 2025 at 12:37.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Rose Hill

Oxfordshire County Council are proposing to carry out Highway improvement works on Rose Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 19 May 2025 at 08:38.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Cornwallis Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Cornwallis Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 16 May 2025 at 11:10.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Henley Avenue

Oxfordshire County Council are proposing to carry out Highway improvement works on Henley Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 9 May 2025 at 12:34.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Henley Avenue

Oxfordshire County Council are proposing to carry out Highway improvement works on Henley Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 19 May 2025 at 08:39.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Freelands Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Freelands Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 16 May 2025 at 11:15.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Freelands Road

Oxfordshire County Council were proposing to carry out Highway improvement works on Freelands Road, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 7 July 2025 and run through until 21 November 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 2 Jul 2025 at 14:03.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Iffley Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Iffley Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 9 May 2025 at 12:35.

Oxfordshire County Council logo
LONG TERM
Between
7 Jul and 21 Nov 2025
Details
View Map
Share
Follow
Iffley Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Iffley Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 7 July 2025 and could run through until 21 November 2025. The works will impact the footway and carriageway.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Oxfordshire County Council on 19 May 2025 at 08:40.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 30 Sep 2025
Details
View Map
Share
Fox Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fox Lane, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 30 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Apr 2025 at 12:32.

Southern Gas Networks logo
LONG TERM
Between
21 Jul and 30 Sep 2025
Details
View Map
Share
Fox Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fox Lane, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 21 July 2025 and run through until 30 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 May 2025 at 14:11.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Foxcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxcombe Road, Boars Hill, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 24 July 2025 and could run through until 9 September 2025. The works will impact the footway, carriageway and verge.

*These works were due to commence more than a month ago. It is possible that the works may still commence but it should also be considered that the works may have been cancelled and the roadworks data has not been updated to reflect this.

This roadwork event was last updated by Southern Gas Networks on 25 Jul 2025 at 14:37.

Thames Water logo
LONG TERM
Between
25 Jul and 12 Dec 2025
Details
View Map
Share
Road Running Through Lower Radley

Thames Water were proposing to carry out Utility asset works on Road Running Through Lower Radley, Lower Radley, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 25 July 2025 and run through until 12 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 29 Jul 2025 at 10:07.

Southern Gas Networks logo
LONG TERM
Finishing
Tuesday
Details
View Map
Share
Follow
Foxcombe Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Foxcombe Road, Boars Hill, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 28 July 2025 at 10:40 and could run through until 9 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 28 Jul 2025 at 10:40.

Scottish Hydro Electric Power Dis logo
LONG TERM
Until
20 Dec 2026
Details
View Map
Share
Follow
Grenoble Road

Scottish Hydro Electric Power Dis are carrying out Utility repair and maintenance works on Grenoble Road, Sandford-on-thames, Oxford.

These works are categorised as Major.

A lane is closed for some or all of the period and could cause delays to journeys.

The works started on 4 August 2025 at 10:00 and could run through until 20 December 2026. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 4 Aug 2025 at 11:33.

Finishing
Today
Details
View Map
Share
Follow
Sandford Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Sandford Road, Oxford.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 August 2025 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Jul 2025 at 08:39.

Finishing
Today
Details
View Map
Share
Follow
Sandford Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Sandford Road, Oxford.

These works are categorised as Major.

Multi-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 18 August 2025 at 10:30 and could run through until 3 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 18 Aug 2025 at 10:52.

Southern Gas Networks logo
Between
18 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Wimblestraw Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wimblestraw Road, Berinsfield, Wallingford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 12 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 21 May 2025 at 08:40.

Southern Gas Networks logo
LONG TERM
Between
18 Aug and 26 Sep 2025
Details
View Map
Share
Follow
Andersey Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Andersey Way, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 18 August 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 12:25.

Oxfordshire County Council logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Courtland Road

Oxfordshire County Council are carrying out Highway improvement works on Courtland Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 08:00 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 08:28.

Oxfordshire County Council logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Westbury Crescent

Oxfordshire County Council are carrying out Highway improvement works on Westbury Crescent, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 08:00 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 08:28.

Oxfordshire County Council logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Iffley Turn

Oxfordshire County Council are carrying out Highway improvement works on Iffley Turn, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 08:00 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 08:28.

Oxfordshire County Council logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Rose Hill

Oxfordshire County Council are carrying out Highway improvement works on Rose Hill, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 08:27.

Oxfordshire County Council logo
LONG TERM
Until
24 Nov 2025
Details
View Map
Share
Follow
Cornwallis Road

Oxfordshire County Council are carrying out Highway improvement works on Cornwallis Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 08:00 and could run through until 24 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 08:28.

Oxfordshire County Council logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Henley Avenue

Oxfordshire County Council are carrying out Highway improvement works on Henley Avenue, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 08:27.

Oxfordshire County Council logo
LONG TERM
Until
21 Nov 2025
Details
View Map
Share
Follow
Iffley Road

Oxfordshire County Council are carrying out Highway improvement works on Iffley Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 19 August 2025 at 08:00 and could run through until 21 November 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 08:27.

Southern Gas Networks logo
LONG TERM
Between
21 Aug and 2 Oct 2025
Details
View Map
Share
Follow
Andersey Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Andersey Way, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 21 August 2025 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 08:43.

Southern Gas Networks logo
LONG TERM
Until
2 Oct 2025
Details
View Map
Share
Follow
Andersey Way

Southern Gas Networks are carrying out Utility repair and maintenance works on Andersey Way, Abingdon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 21 August 2025 at 08:50 and could run through until 2 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 09:00.

Southern Gas Networks logo
Between
25 Aug and 12 Sep 2025
Details
View Map
Share
Follow
Footpath Between Preston Road And Unnamed--single Carriageway (41603056)

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Between Preston Road And Unnamed--single Carriageway (41603056), Abingdon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 25 August 2025 and could run through until 12 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 12:29.

Southern Gas Networks logo
Until
18 Sep 2025
Details
View Map
Share
Follow
Footpath Between Preston Road And Unnamed--single Carriageway (41603056)

Southern Gas Networks are carrying out Utility repair and maintenance works on Footpath Between Preston Road And Unnamed--single Carriageway (41603056), Abingdon.

These works are categorised as Major.

There are no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works started on 1 September 2025 at 13:00 and could run through until 18 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 13:00.

Thames Water logo
LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Follow
Road Running Through Lower Radley

Thames Water are proposing to carry out Utility asset works on Road Running Through Lower Radley, Lower Radley, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Jun 2025 at 09:32.

Thames Water logo
LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Follow
Road Running Through Lower Radley

Thames Water are proposing to carry out Utility asset works on Road Running Through Lower Radley, Lower Radley, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Jul 2025 at 14:15.

Thames Water logo
LONG TERM
Between
25 Aug and 12 Dec 2025
Details
View Map
Share
Follow
Road Running Through Lower Radley

Thames Water are proposing to carry out Utility asset works on Road Running Through Lower Radley, Lower Radley, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 August 2025 and could run through until 12 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 14 Aug 2025 at 10:50.

Oxfordshire County Council logo
Finishing
Today
Details
View Map
Share
Follow
Field Avenue

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Field Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 August 2025 and could run through until 3 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Jun 2025 at 09:37.

Southern Gas Networks logo
Finishing
Monday
Details
View Map
Share
Follow
Broadway

Southern Gas Networks are carrying out Utility repair and maintenance works on Broadway, Didcot.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 11:40 and could run through until 8 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 1 Sep 2025 at 12:50.

Thames Water logo
Finishing
Tomorrow
Details
View Map
Share
Drayton Road

Thames Water were proposing to carry out New service connection on Drayton Road, Sutton Courtenay, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 September 2025 and run through until 4 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 25 Jun 2025 at 13:19.

Southern Gas Networks logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Wilsham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilsham Road, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 12:08.

Southern Gas Networks logo
Between
1 and 26 Sep 2025
Details
View Map
Share
Follow
Wilsham Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Wilsham Road, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 26 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 10:12.

Southern Gas Networks logo
Until
30 Sep 2025
Details
View Map
Share
Follow
Wilsham Road

Southern Gas Networks are carrying out Utility repair and maintenance works on Wilsham Road, Abingdon.

These works are categorised as Major.

Two-way signals are to be in place for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 13:20 and could run through until 30 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 13:25.

Southern Gas Networks logo
LONG TERM
Between
1 Sep and 11 Nov 2025
Details
View Map
Share
Follow
Fox Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fox Lane, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 11 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Jun 2025 at 11:40.

Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Oxford Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Oxford Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 20 Jun 2025 at 08:42.

Between
1 and 22 Sep 2025
Details
View Map
Share
Follow
Oxford Road

Last Mile Electricity (formerly Global Utility Connections) are proposing to carry out Utility asset works on Oxford Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 September 2025 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 12 Aug 2025 at 14:22.

Until
22 Sep 2025
Details
View Map
Share
Follow
Oxford Road

Last Mile Electricity (formerly Global Utility Connections) are carrying out Utility asset works on Oxford Road, Oxford.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 1 September 2025 at 08:00 and could run through until 22 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Last Mile Electricity (formerly Global Utility Connections) on 1 Sep 2025 at 09:05.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Drayton Road

Thames Water are proposing to carry out New service connection on Drayton Road, Sutton Courtenay, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 September 2025 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 27 Jun 2025 at 11:40.

Thames Water logo
Finishing
Friday
Details
View Map
Share
Follow
Drayton Road

Thames Water are carrying out New service connection on Drayton Road, Sutton Courtenay, Abingdon.

These works are categorised as Major.

The road is closed for some or all of the period and could cause delays to journeys.

The works started on 2 September 2025 at 11:20 and could run through until 5 September 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 2 Sep 2025 at 11:29.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
West Quay

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Quay, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:55.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
West Quay

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Quay, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 14:44.

Southern Gas Networks logo
LONG TERM
Between
8 Sep and 24 Oct 2025
Details
View Map
Share
Follow
West Quay

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on West Quay, Abingdon.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 24 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 3 Sep 2025 at 12:01.

Thames Water logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Church Way

Thames Water are proposing to carry out Utility repair and maintenance works on Church Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 2 Jul 2025 at 13:53.

Thames Water logo
Between
8 and 10 Sep 2025
Details
View Map
Share
Follow
Church Way

Thames Water are proposing to carry out Utility repair and maintenance works on Church Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 8 September 2025 and could run through until 10 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:56.

Southern Gas Networks logo
LONG TERM
Between
9 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Foxcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxcombe Road, Boars Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 15 Aug 2025 at 11:51.

Southern Gas Networks logo
LONG TERM
Between
9 Sep and 19 Dec 2025
Details
View Map
Share
Follow
Foxcombe Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Foxcombe Road, Boars Hill, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 9 September 2025 and could run through until 19 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 14:13.

Scottish Hydro Electric Power Dis logo
Between
15 and 17 Sep 2025
Details
View Map
Share
Barrow Road

Scottish Hydro Electric Power Dis were proposing to carry out Disconnection or alteration of supply on Barrow Road, Shippon, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 17 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 8 Aug 2025 at 15:26.

Scottish Hydro Electric Power Dis logo
Between
15 Sep and 13 Oct 2025
Details
View Map
Share
Little Bury

Scottish Hydro Electric Power Dis were proposing to carry out Utility repair and maintenance works on Little Bury, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 15 September 2025 and run through until 13 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Feb 2025 at 20:08.

Scottish Hydro Electric Power Dis logo
Between
15 Sep and 13 Oct 2025
Details
View Map
Share
Follow
Little Bury

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Little Bury, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 13 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 28 Feb 2025 at 08:34.

Oxfordshire County Council logo
Between
15 and 26 Sep 2025
Details
View Map
Share
Follow
Field Avenue

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Field Avenue, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 15 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 20 Aug 2025 at 11:50.

Oxfordshire County Council logo
Between
21 and 27 Sep 2025
Details
View Map
Share
Follow
Howard Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Howard Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 21 September 2025 and could run through until 27 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 11:15.

Oxfordshire County Council logo
Between
22 and 30 Sep 2025
Details
View Map
Share
Follow
Drayton Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Drayton Road, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 22 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 4 Jun 2025 at 13:58.

BT logo
Between
22 and 25 Sep 2025
Details
View Map
Share
Foxborough Road

BT were proposing to carry out Utility asset works on Foxborough Road, Radley, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 25 September 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by BT on 19 Jun 2025 at 08:04.

Thames Water logo
Between
22 and 24 Sep 2025
Details
View Map
Share
Road Running Through Besselsleigh Village

Thames Water were proposing to carry out Utility repair and maintenance works on Road Running Through Besselsleigh Village, Besselsleigh, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 22 September 2025 and run through until 24 September 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 13:02.

Oxfordshire County Council logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Follow
Church Street

Oxfordshire County Council are proposing to carry out Highway improvement works on Church Street, Appleford, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 25 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 14:11.

Oxfordshire County Council logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Manor Close

Oxfordshire County Council are proposing to carry out Highway improvement works on Manor Close, Appleford, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 14:14.

Thames Water logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Orchard Way

Thames Water are proposing to carry out New service connection on Orchard Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 21 Jul 2025 at 09:58.

Thames Water logo
Between
23 and 26 Sep 2025
Details
View Map
Share
Follow
Orchard Way

Thames Water are proposing to carry out New service connection on Orchard Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 23 September 2025 and could run through until 26 September 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 1 Sep 2025 at 11:57.

Thames Water logo
Between
23 and 25 Sep 2025
Details
View Map
Share
Appleton Road

Thames Water were proposing to carry out Utility repair and maintenance works on Appleton Road, Cumnor, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 23 September 2025 and run through until 25 September 2025. The works were due to impact the footway and carriageway.

This roadwork event was last updated by Thames Water on 4 Jul 2025 at 11:32.

Oxfordshire County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
School Lane

Oxfordshire County Council are proposing to carry out Highway improvement works on School Lane, Appleford, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 14:07.

Oxfordshire County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Galley Field

Oxfordshire County Council are proposing to carry out Highway improvement works on Galley Field, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 15:10.

Oxfordshire County Council logo
Between
24 and 26 Sep 2025
Details
View Map
Share
Follow
Stockey End

Oxfordshire County Council are proposing to carry out Highway improvement works on Stockey End, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 September 2025 and could run through until 26 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 15:30.

Oxfordshire County Council logo
Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
St James Road

Oxfordshire County Council are proposing to carry out Highway improvement works on St James Road, Radley, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 16:10.

Oxfordshire County Council logo
Between
25 and 29 Sep 2025
Details
View Map
Share
Follow
Rainbow Way

Oxfordshire County Council are proposing to carry out Highway improvement works on Rainbow Way, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 25 September 2025 and could run through until 29 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 15:45.

Oxfordshire County Council logo
Between
26 and 30 Sep 2025
Details
View Map
Share
Follow
Berrymere Road

Oxfordshire County Council are proposing to carry out Highway improvement works on Berrymere Road, Wootton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 26 September 2025 and could run through until 30 September 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2025 at 11:24.

Southern Gas Networks logo
LONG TERM
Between
29 Sep and 7 Nov 2025
Details
View Map
Share
Follow
Footpath Between Preston Road And Hogarth Place

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Between Preston Road And Hogarth Place, Abingdon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 29 September 2025 and could run through until 7 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 13:53.

Southern Gas Networks logo
Between
29 Sep and 17 Oct 2025
Details
View Map
Share
Follow
Jarn Way

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Jarn Way, Boars Hill, Oxford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 17 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:53.

Oxfordshire County Council logo
Between
29 Sep and 3 Oct 2025
Details
View Map
Share
Follow
Howard Street

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Howard Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 29 September 2025 and could run through until 3 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 27 Aug 2025 at 10:31.

Gigaclear logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Pebble Hill

Gigaclear are proposing to carry out Utility asset works on Pebble Hill, Toot Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 17 Jul 2025 at 15:56.

Gigaclear logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Pebble Hill

Gigaclear are proposing to carry out Utility asset works on Pebble Hill, Toot Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Gigaclear on 1 Aug 2025 at 13:42.

Gigaclear logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Pebble Hill

Gigaclear were proposing to carry out Utility asset works on Pebble Hill, Marsh Baldon, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 1 October 2025 and run through until 15 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 9 Jul 2025 at 13:42.

Gigaclear logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Pebble Hill

Gigaclear are proposing to carry out Utility asset works on Pebble Hill, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 17 Jul 2025 at 15:55.

Gigaclear logo
Between
1 and 15 Oct 2025
Details
View Map
Share
Follow
Pebble Hill

Gigaclear are proposing to carry out Utility asset works on Pebble Hill, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 1 October 2025 and could run through until 15 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 1 Aug 2025 at 11:33.

Oxfordshire County Council logo
Between
2 and 20 Oct 2025
Details
View Map
Share
Follow
Basil Hill Road

Oxfordshire County Council are proposing to carry out Works for road purposes on Basil Hill Road, Didcot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 21 Aug 2025 at 13:52.

Oxfordshire County Council logo
Between
2 and 20 Oct 2025
Details
View Map
Share
Follow
Basil Hill Road

Oxfordshire County Council are proposing to carry out Works for road purposes on Basil Hill Road, Didcot.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 2 October 2025 and could run through until 20 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 3 Sep 2025 at 11:21.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Footpath Between Preston Road And Hogarth Place

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Footpath Between Preston Road And Hogarth Place, Abingdon.

These works are categorised as Major.

There will be no traffic signals or road closures necessary for these works and traffic will operate on a give-and-take basis.

The works will start on or after 6 October 2025 and could run through until 14 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 2 Sep 2025 at 11:11.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 24 Dec 2025
Details
View Map
Share
Drayton Road

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Drayton Road, Abingdon.

These works were categorised as Major.

Multi-way signals were planned to be in use for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 24 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 14 Jul 2025 at 10:56.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 24 Dec 2025
Details
View Map
Share
Follow
Drayton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Drayton Road, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 30 Jul 2025 at 11:59.

Southern Gas Networks logo
LONG TERM
Between
6 Oct and 24 Dec 2025
Details
View Map
Share
Follow
Drayton Road

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Drayton Road, Abingdon.

These works are categorised as Major.

Multi-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 24 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 21 Aug 2025 at 14:43.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Butterwort Place

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Butterwort Place, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 12:43.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Crowberry Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Crowberry Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 8 Aug 2025 at 14:02.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Rest Harrow

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Rest Harrow, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 8 Aug 2025 at 13:57.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Harebell Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Harebell Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 8 Aug 2025 at 14:04.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Swinbourne Road

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Swinbourne Road, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 12:41.

Thames Water logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Appleton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Appleton Road, Cumnor, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 30 Jul 2025 at 14:10.

Thames Water logo
Between
6 and 8 Oct 2025
Details
View Map
Share
Follow
Appleton Road

Thames Water are proposing to carry out Utility repair and maintenance works on Appleton Road, Cumnor, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 8 October 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Thames Water on 8 Aug 2025 at 12:05.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Havelock Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Havelock Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 8 Aug 2025 at 14:21.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Maidcroft Road

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Maidcroft Road, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 12:41.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Clive Road

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Clive Road, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 12:40.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Follow
Parker Street

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Parker Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 6 October 2025 and could run through until 17 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 7 Aug 2025 at 08:25.

Oxfordshire County Council logo
Between
6 and 17 Oct 2025
Details
View Map
Share
Warwick Street

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Warwick Street, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 October 2025 and run through until 17 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 12:45.

Southern Gas Networks logo
Between
13 and 28 Oct 2025
Details
View Map
Share
Follow
Broadway

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Broadway, Didcot.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 28 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Southern Gas Networks on 1 Jul 2025 at 12:01.

Scottish Hydro Electric Power Dis logo
Between
13 and 22 Oct 2025
Details
View Map
Share
Follow
Beagle Close

Scottish Hydro Electric Power Dis are proposing to carry out New service connection on Beagle Close, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 13 October 2025 and could run through until 22 October 2025. The works will impact the footway and carriageway.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 6 Aug 2025 at 16:16.

National Highways logo
Between
14 and 16 Oct 2025
Details
View Map
Share
Follow
Northbound A420 Between Cumnor And North Hinksey

National Highways are proposing to carry out Utility repair and maintenance works on Northbound A420 Between Cumnor And North Hinksey, Cumnor, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 14 October 2025 and could run through until 16 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by National Highways on 8 Aug 2025 at 11:09.

Gigaclear logo
Between
17 and 27 Oct 2025
Details
View Map
Share
Follow
Road Running Through Toot Baldon

Gigaclear are proposing to carry out Utility asset works on Road Running Through Toot Baldon, Toot Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 1 Aug 2025 at 11:41.

Gigaclear logo
Between
17 and 27 Oct 2025
Details
View Map
Share
Follow
Road Running Through Toot Baldon

Gigaclear are proposing to carry out Utility asset works on Road Running Through Toot Baldon, Toot Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 17 October 2025 and could run through until 27 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 7 Aug 2025 at 10:31.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 8 Dec 2025
Details
View Map
Share
Follow
Fox Lane

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on Fox Lane, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 8 December 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 9 Jul 2025 at 09:20.

Southern Gas Networks logo
LONG TERM
Between
20 Oct and 8 Dec 2025
Details
View Map
Share
Fox Lane

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on Fox Lane, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 8 December 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 11 Jun 2025 at 08:51.

Thames Water logo
Between
20 and 22 Oct 2025
Details
View Map
Share
Road Running Through Besselsleigh Village

Thames Water were proposing to carry out Utility repair and maintenance works on Road Running Through Besselsleigh Village, Besselsleigh, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 22 October 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 16 Jul 2025 at 10:47.

Oxfordshire County Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Butterwort Place

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Butterwort Place, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2025 at 08:14.

Oxfordshire County Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Butterwort Place

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Butterwort Place, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2025 at 08:18.

Oxfordshire County Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Swinbourne Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Swinbourne Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 13:28.

Oxfordshire County Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Maidcroft Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Maidcroft Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2025 at 08:09.

Oxfordshire County Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Maidcroft Road

Oxfordshire County Council were proposing to carry out Highway repair and maintenance works on Maidcroft Road, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 20 October 2025 and run through until 31 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2025 at 08:17.

Oxfordshire County Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Clive Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Clive Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 13:38.

Oxfordshire County Council logo
Between
20 and 31 Oct 2025
Details
View Map
Share
Follow
Warwick Street

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Warwick Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 20 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 19 Aug 2025 at 12:57.

Gigaclear logo
Between
24 and 29 Oct 2025
Details
View Map
Share
Baldon Lane

Gigaclear were proposing to carry out Utility asset works on Baldon Lane, Marsh Baldon, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 12 Aug 2025 at 12:27.

Gigaclear logo
Between
24 and 29 Oct 2025
Details
View Map
Share
Road Between Baldon Lane And The Green

Gigaclear were proposing to carry out Utility asset works on Road Between Baldon Lane And The Green, Marsh Baldon, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 12 Aug 2025 at 12:28.

Gigaclear logo
Between
24 and 29 Oct 2025
Details
View Map
Share
The Green

Gigaclear were proposing to carry out Utility asset works on The Green, Marsh Baldon, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 12 Aug 2025 at 12:30.

Gigaclear logo
Between
24 and 29 Oct 2025
Details
View Map
Share
Road Between Marsh Baldon And Toot Baldon

Gigaclear were proposing to carry out Utility asset works on Road Between Marsh Baldon And Toot Baldon, Marsh Baldon, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 24 October 2025 and run through until 29 October 2025. The works were due to impact the carriageway only.

This roadwork event was last updated by Gigaclear on 12 Aug 2025 at 12:29.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
St Helens Wharf

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Helens Wharf, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 12 Aug 2025 at 11:45.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
Follow
St Helens Wharf

Southern Gas Networks are proposing to carry out Utility repair and maintenance works on St Helens Wharf, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 21 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 19 Aug 2025 at 11:10.

Southern Gas Networks logo
Between
27 Oct and 21 Nov 2025
Details
View Map
Share
St Helens Wharf

Southern Gas Networks were proposing to carry out Utility repair and maintenance works on St Helens Wharf, Abingdon.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 27 October 2025 and run through until 21 November 2025. The works were due to impact the footway, carriageway and verge.

This roadwork event was last updated by Southern Gas Networks on 7 Aug 2025 at 09:15.

Oxfordshire County Council logo
Between
27 Oct and 14 Nov 2025
Details
View Map
Share
Follow
Section Of A4074 - No Properties (36202402)

Oxfordshire County Council are proposing to carry out Highway improvement works on Section Of A4074 - No Properties (36202402), Berinsfield, Wallingford.

These works are categorised as Major.

Two-way signals will be in place for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 14 November 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by Oxfordshire County Council on 7 Aug 2025 at 13:38.

Oxfordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Crowberry Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Crowberry Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 19:22.

Oxfordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Rest Harrow

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Rest Harrow, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 19:20.

Oxfordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Harebell Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Harebell Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 19:25.

Oxfordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Havelock Road

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Havelock Road, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 1 Sep 2025 at 19:33.

Oxfordshire County Council logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
Parker Street

Oxfordshire County Council are proposing to carry out Highway repair and maintenance works on Parker Street, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Oxfordshire County Council on 2 Sep 2025 at 11:15.

National Highways logo
Between
27 and 31 Oct 2025
Details
View Map
Share
Follow
North Hinksey Lane

National Highways are proposing to carry out Utility asset works on North Hinksey Lane, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 27 October 2025 and could run through until 31 October 2025. The works will impact the carriageway and verge.

This roadwork event was last updated by National Highways on 4 Aug 2025 at 12:28.

Gigaclear logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Baldon Lane

Gigaclear are proposing to carry out Utility asset works on Baldon Lane, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 15 Aug 2025 at 09:50.

Gigaclear logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Baldon Lane

Gigaclear are proposing to carry out Utility asset works on Baldon Lane, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 19 Aug 2025 at 10:42.

Gigaclear logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Road Between Baldon Lane And The Green

Gigaclear are proposing to carry out Utility asset works on Road Between Baldon Lane And The Green, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 15 Aug 2025 at 09:54.

Gigaclear logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Road Between Baldon Lane And The Green

Gigaclear are proposing to carry out Utility asset works on Road Between Baldon Lane And The Green, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 19 Aug 2025 at 10:41.

Gigaclear logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
The Green

Gigaclear are proposing to carry out Utility asset works on The Green, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 15 Aug 2025 at 09:51.

Gigaclear logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
The Green

Gigaclear are proposing to carry out Utility asset works on The Green, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 19 Aug 2025 at 10:41.

Gigaclear logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Road Between Marsh Baldon And Toot Baldon

Gigaclear are proposing to carry out Utility asset works on Road Between Marsh Baldon And Toot Baldon, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 15 Aug 2025 at 09:48.

Gigaclear logo
Between
28 and 31 Oct 2025
Details
View Map
Share
Follow
Road Between Marsh Baldon And Toot Baldon

Gigaclear are proposing to carry out Utility asset works on Road Between Marsh Baldon And Toot Baldon, Marsh Baldon, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 28 October 2025 and could run through until 31 October 2025. The works will impact the carriageway only.

This roadwork event was last updated by Gigaclear on 19 Aug 2025 at 10:44.

Scottish Hydro Electric Power Dis logo
LONG TERM
Between
2 Nov and 7 Dec 2025
Details
View Map
Share
Follow
Little Bury

Scottish Hydro Electric Power Dis are proposing to carry out Utility repair and maintenance works on Little Bury, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 2 November 2025 and could run through until 7 December 2025. The works will impact the carriageway only.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 13 Jun 2025 at 12:39.

Scottish Hydro Electric Power Dis logo
Between
3 and 5 Nov 2025
Details
View Map
Share
Follow
Barrow Road

Scottish Hydro Electric Power Dis are proposing to carry out Disconnection or alteration of supply on Barrow Road, Shippon, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 3 November 2025 and could run through until 5 November 2025. The works will impact the footway, carriageway and verge.

This roadwork event was last updated by Scottish Hydro Electric Power Dis on 22 Aug 2025 at 10:21.

Thames Water logo
Between
6 and 8 Nov 2025
Details
View Map
Share
Ashhurst Way

Thames Water were proposing to carry out Utility repair and maintenance works on Ashhurst Way, Oxford.

These works were categorised as Major.

The road was planned to be closed for some or all of the period. However, the works were cancelled.

The works were originally planned to start 6 November 2025 and run through until 8 November 2025. The works were due to impact the verge only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:41.

Thames Water logo
Between
10 and 13 Nov 2025
Details
View Map
Share
Follow
Henleys Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Henleys Lane, Drayton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 13 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 19 Aug 2025 at 10:53.

Thames Water logo
Between
10 and 12 Nov 2025
Details
View Map
Share
Follow
Henleys Lane

Thames Water are proposing to carry out Utility repair and maintenance works on Henleys Lane, Drayton, Abingdon.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 10 November 2025 and could run through until 12 November 2025. The works will impact the carriageway only.

This roadwork event was last updated by Thames Water on 26 Aug 2025 at 16:15.

Thames Water logo
Between
24 and 26 Nov 2025
Details
View Map
Share
Follow
Ashhurst Way

Thames Water are proposing to carry out Utility repair and maintenance works on Ashhurst Way, Oxford.

These works are categorised as Major.

The road will be closed for some or all of the period and could cause delays to journeys.

The works will start on or after 24 November 2025 and could run through until 26 November 2025. The works will impact the verge only.

This roadwork event was last updated by Thames Water on 13 Aug 2025 at 08:35.


Roadworks Map near to Thesiger Road, ABINGDON, OX14 2DX (Loading...)

Colour Codes
Planned
In Progress
Completed
Cancelled
MarkerMarker
Last Updated: 3 Sep 2025 13:15
Notes

  • Any red lines indicate the extent of the works.
  • Clicking on the map will re-centre to the selected point.
  • Within 1 mile, all roadworks are displayed.
  • Within 2-3 miles, standard, urgent and major roadworks are displayed.
  • For 3-5 miles, only major roadworks are shown.
  • The higher the marker number, the further away the roadworks are from the centre of the postcode.
  • Where traffic camera videos or images are shown, no historical versions are retained. Once a new image or video becomes available it overwrites the previous version.

Roadworks Listing near to Thesiger Road, ABINGDON, OX14 2DX (39 Events)

  • ...
Works Location and Details
Actual Work Date
(Scheduled Dates)
Status
Distance
(miles)
1
Thames Water logo
THESIGER ROAD 
(0.1 miles)
Thames Water
Utility asset works - Footway - Some carriageway incursion
In Progress
Since: 2 Sep 2025 07:30
(Scheduled: 2 Sep 2025 - 4 Sep 2025)
0.1
Details
Share
Follow
2
Oxfordshire County Council logo
VINEYARD 
(0.1 miles)
Oxfordshire County Council
Section 50 - Footway - No carriageway incursion
Planned
Scheduled: 3 Sep 2025 - 12 Sep 2025
0.1
Details
Share
Follow
3
Thames Water logo
URGENT
  
KINGSTON CLOSE 
(0.1 miles)
Thames Water
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 3 Sep 2025 11:27
(Scheduled: 3 Sep 2025 - 5 Sep 2025)
0.1
Details
Share
Follow
4
BT logo
RADLEY ROAD 
(0.2 miles)
BT
Utility asset works - Footway - Multi-way signals
In Progress
Since: 1 Sep 2025 12:12
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
0.2
Details
Share
Follow
5
Thames Water logo
URGENT
  
BURGESS CLOSE 
(0.3 miles)
Thames Water
Utility repair and maintenance works - Carriageway - Give and take
Complete
18 Aug 2025 10:30 - 26 Aug 2025 08:30
0.3
Details
Share
6
Thames Water logo
WOOTTON ROAD 
(0.4 miles)
Thames Water
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Sep 2025 - 8 Sep 2025
0.4
Details
Share
Follow
7
Scottish Hydro Electric Power Dis logo
URGENT
  
HIGH STREET 
(0.4 miles)
Scottish Hydro Electric Power Dis
Utility repair and maintenance works - Footway - Some carriageway incursion
In Progress
Since: 1 Sep 2025 11:07
(Scheduled: 1 Sep 2025 - 5 Sep 2025)
0.4
Details
Share
Follow
8
Thames Water logo
CURTIS AVENUE 
(0.4 miles)
Thames Water
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Sep 2025 - 8 Sep 2025
0.4
Details
Share
Follow
9
Thames Water logo
DUNDAS CLOSE 
(0.5 miles)
Thames Water
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Sep 2025 - 8 Sep 2025
0.5
Details
Share
Follow
10
Thames Water logo
LEE AVENUE 
(0.5 miles)
Thames Water
Utility asset works - Footway - Some carriageway incursion
Planned
Scheduled: 4 Sep 2025 - 8 Sep 2025
0.5
Details
Share
Follow
  • ...